Bridge Statistics for Ochlocknee, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 262ft / 80.0mTotal length
  • $15,308,000Total costs
  • 7,520Total average daily traffic
  • 135Total average daily truck traffic
  • 11,280Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ochlocknee
  • No street view available for this location

New bridges in Ochlocknee, GA - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 61970-1979
  • 51980-1989
  • 21990-1999
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Ochlocknee, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 12000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 92.9%Good
  • 7.1%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 85.7%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 23.5%Very good
  • 35.3%Good
  • 23.5%Satisfactory
  • 17.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 1315067,  Location: APP 5.2 MI NE OF CAIRO (Lat: 30.939258,  Lng: -84.099389),  Route carried "on" structure: County highway 260,  Year Built: 1988,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20,  Features Intersected: BARNETTS CREEK,  Facility Carried by Structure: MCMILLAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,407,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $2,110,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1315093,  Location: GRADY- THOMAS CO LINE (Lat: 30.959397,  Lng: -84.111383),  Route carried "on" structure: State highway 188,  Year Built: 1999,  Status: Open,  Structure Length: 7.47m (24.51ft),  Average Daily Traffic: 790 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,185 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BARNETTS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $957,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $1,436,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2750033,  Location: 3 MI W OF OCHLOCKNEE (Lat: 30.962389,  Lng: -84.088228),  Route carried "on" structure: State highway 188,  Year Built: 1955,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 540 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 810 (year 2031),  Design Load: H 15,  Features Intersected: E BRANCH BARNETTS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Underwater Inspection Date: January 2020,  Bridge Improvement Cost: $805,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $1,207,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2750035,  Location: APP 2 MI E OF OCHLOCKNEE (Lat: 30.976958,  Lng: -84.023108),  Route carried "on" structure: State highway 188,  Year Built: 1971,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 820 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,230 (year 2031),  Design Load: HS 15,  Features Intersected: L. OCHLOCKNEE RIVER O/F
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $938,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2750036,  Location: APP 2 MI E OF OCHLOCKNEE (Lat: 30.976908,  Lng: -84.020039),  Route carried "on" structure: State highway 188,  Year Built: 1971,  Status: Open,  Structure Length: 12.74m (41.80ft),  Average Daily Traffic: 820 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,230 (year 2031),  Design Load: HS 15,  Features Intersected: LITTLE OCHLOCKNEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,633,000,  Roadway Improvement Cost: $163,000,  Total Project Cost: $2,450,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2755044,  Location: 1.5 MI NW OCHLOCKNEE (Lat: 30.981169,  Lng: -84.077328),  Route carried "on" structure: County highway 74,  Year Built: 1974,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: HORSE CREEK,  Facility Carried by Structure: DOLLAR STORE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: January 2020,  Bridge Improvement Cost: $391,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $586,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2755045,  Location: 2.5 MI W OF OCHLOCKNEE (Lat: 30.976878,  Lng: -84.095808),  Route carried "on" structure: County highway 74,  Year Built: 1974,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 520 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 780 (year 2031),  Design Load: H 15,  Features Intersected: E BR. BARNETTS CRK,  Facility Carried by Structure: DOLLAR STORE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.31m (37.11ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Underwater Inspection Date: January 2020,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $938,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2755065,  Location: 3 MI NE OF OCHLOCKNEE (Lat: 31.014258,  Lng: -84.037308),  Route carried "on" structure: County highway 126,  Year Built: 1989,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 240 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 360 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: L. OCHLOCKNEE RIV TRIB,  Facility Carried by Structure: STAGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: January 2020,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $141,000
Find on map >>   Show street view

Structure Number: 2755068,  Location: 3.5 MI NE OCHLOCKNEE (Lat: 31.015358,  Lng: -84.019428),  Route carried "on" structure: County highway 133,  Year Built: 1985,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 60 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 90 (year 2031),  Design Load: HS 15,  Features Intersected: LITTLE OCHLOCKNEE RIVER,  Facility Carried by Structure: ROUP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 16,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: January 2020,  Bridge Improvement Cost: $1,250,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,875,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2755069,  Location: 3 MI NE OF OCHLOCKNEE (Lat: 31.013528,  Lng: -84.036408),  Route carried "on" structure: County highway 133,  Year Built: 1985,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: L. OCHLOCKNEE RIV TRIB,  Facility Carried by Structure: ROUP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 2755076,  Location: 3.5 M S OF OCHLOCKNEE (Lat: 30.921789,  Lng: -84.047258),  Route carried "on" structure: County highway 156,  Year Built: 1970,  Status: Posted for load,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 30 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 45 (year 2031),  Features Intersected: PINE CREEK,  Facility Carried by Structure: ROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 15.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 41.94m (137.60ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: January 2020,  Bridge Improvement Cost: $219,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $328,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 2755077,  Location: 3.5 M S OF OCHLOCKNEE (Lat: 30.927358,  Lng: -84.036669),  Route carried "on" structure: County highway 156,  Year Built: 1974,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 40 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 60 (year 2031),  Features Intersected: WILSON BRANCH,  Facility Carried by Structure: ROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 41.21m (135.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 2755082,  Location: 2 MI SW OF OCHLOCKNEE (Lat: 30.947097,  Lng: -84.071389),  Route carried "on" structure: County highway 159,  Year Built: 1984,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 440 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 660 (year 2031),  Design Load: H 15,  Features Intersected: HORSE CREEK,  Facility Carried by Structure: McMILLAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $781,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,172,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2755123,  Location: 2 MI N OCHLOCKNEE (Lat: 30.999369,  Lng: -84.043989),  Route carried "on" structure: County highway 126,  Year Built: 1996,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 240 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 360 (year 2031),  Design Load: H 15,  Features Intersected: L. OCHLOCKNEE RIV TRIB,  Facility Carried by Structure: STAGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $195,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $293,000
Find on map >>   Show street view

Structure Number: 2755135,  Location: 1.5 MI NE OF OCHLOCKNEE (Lat: 30.995528,  Lng: -84.039139),  Route carried "on" structure: County highway 199,  Year Built: 2001,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 30 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 45 (year 2031),  Design Load: H 15,  Features Intersected: L. OCHLOCKNEE RIV TRIB,  Facility Carried by Structure: WUSRT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $128,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $192,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2755141,  Location: 2 MI W OF OCHLOCKNEE (Lat: 30.965028,  Lng: -84.079489),  Route carried "on" structure: State highway 188,  Year Built: 2001,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 660 (year 2011),  Truck Traffic: 11%,  Average Future Daily Traffic: 990 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HORSE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $574,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $862,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2755167,  Location: 3 MILES NORTHEAST OF OCHL (Lat: 31.013689,  Lng: -84.071339),  Route carried "on" structure: County highway 133,  Year Built: 2011,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HORSE CREEK,  Facility Carried by Structure: LEE WHITE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $469,000,  Deck Structure Type: Concrete Precast Panels