Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ogden, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 194ft / 58.6mTotal length
  • $39,221,000Total costs
  • 146,822Total average daily traffic
  • 7,055Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ogden
  • No street view available for this location

New bridges in Ogden, NY - historical statistics
  • New bridges - historical statistics
  • 31900-1909
  • 11910-1919
  • 11960-1969
  • 151990-1999
Reconstructed bridges in Ogden, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Ogden, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 33.3%Good
  • 16.7%Satisfactory
  • 8.3%Fair
  • 16.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 41.7%Very good
  • 25.0%Good
  • 16.7%Fair
  • 16.7%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 58.3%Good
  • 25.0%Satisfactory
  • 8.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 42.9%Very good
  • 42.9%Good
  • 14.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 107469,  Location: JCT CO RD 208 & SH 531 (Lat: 43.160228,  Lng: -77.753847),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 11,951 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,518 (year 2040),  Design Load: HS 20,  Features Intersected: 531 531 43012059 WB, RTE,  Facility Carried by Structure: MANITOU ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.381,  Lanes on structure: 6,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 23.0m (75.5ft),  Out-to-Out Width: 24.0m (78.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,944,000,  Roadway Improvement Cost: $2,310,000,  Total Project Cost: $6,254,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1074701,  Location: 2.6 MI E JCT SH259 &SH531 (Lat: 43.167044,  Lng: -77.760936),  Route carried "on" structure: State highway 531,  Year Built: 1994,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 14,017 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,621 (year 2040),  Design Load: HS 20,  Features Intersected: LYELL ROAD-CR 117
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.286,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.8m (110.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,350,000,  Roadway Improvement Cost: $791,000,  Total Project Cost: $2,141,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1074702,  Location: 2.6 MI E JCT SH259 &SH531 (Lat: 43.167044,  Lng: -77.761214),  Route carried "on" structure: State highway 531,  Year Built: 1994,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 14,017 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,621 (year 2040),  Design Load: HS 20,  Features Intersected: LYELL ROAD-CR 117
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.026,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.8m (110.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,367,000,  Roadway Improvement Cost: $800,000,  Total Project Cost: $2,167,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107471,  Location: 1.6 MI E JCT RTS 259& 531 (Lat: 43.175314,  Lng: -77.774039),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 3,062 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,788 (year 2040),  Design Load: HS 20,  Features Intersected: 531 531 43012041 WB, RTE,  Facility Carried by Structure: GILLETT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.883,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,074,000,  Roadway Improvement Cost: $1,214,000,  Total Project Cost: $3,288,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107472,  Location: 0.4 MI E OF JCT NY259&531 (Lat: 43.177853,  Lng: -77.796519),  Route carried "on" structure: State highway 531,  Year Built: 1994,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 28,034 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 29,242 (year 2040),  Design Load: HS 20,  Features Intersected: NORTHRUP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.551,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $562,000,  Roadway Improvement Cost: $329,000,  Total Project Cost: $891,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1074731,  Location: RT.531 W.B.OVER RTE 259 (Lat: 43.178733,  Lng: -77.804397),  Route carried "on" structure: State highway 531,  Year Built: 1994,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 9,040 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,429 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 259
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.151,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 47.5m (155.8ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.87m (15.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,675,000,  Roadway Improvement Cost: $981,000,  Total Project Cost: $2,657,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1074732,  Location: RT.531 E.B. OVER RTE 259 (Lat: 43.178531,  Lng: -77.804408),  Route carried "on" structure: State highway 531,  Year Built: 1994,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 14,017 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,621 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 259
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.891,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 47.5m (155.8ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.87m (15.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,675,000,  Roadway Improvement Cost: $981,000,  Total Project Cost: $2,657,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107474,  Location: .2 MI W JCT SH259 & SH531 (Lat: 43.179881,  Lng: -77.814433),  Route carried "on" structure: Bypass State highway 531,  Year Built: 1994,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 18,080 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 18,859 (year 2040),  Design Load: HS 20,  Features Intersected: West Branch Northrup Cre
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.055,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $676,000,  Roadway Improvement Cost: $396,000,  Total Project Cost: $1,072,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331715,  Location: 2 MI NW OF SPENCERPORT (Lat: 43.197533,  Lng: -77.857900),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 1,507 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,110 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SALMON CREEK,  Facility Carried by Structure: Canal Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.384,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $364,000,  Roadway Improvement Cost: $213,000,  Total Project Cost: $577,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 33616,  Location: 1.4 MI E OF SPENCERPORT (Lat: 43.188519,  Lng: -77.773603),  Route carried "on" structure: County highway ,  Year Built: 1969,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 2,492 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,083 (year 2040),  Design Load: H 20,  Features Intersected: EX-NY CENTRAL RR,  Facility Carried by Structure: GILLETT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.347,  Lanes on structure: 2,  Owner: Railroad,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.48m (14.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,285,000,  Roadway Improvement Cost: $753,000,  Total Project Cost: $2,038,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 444314,  Location: 1.4MI E JCT BARGE C + 259 (Lat: 43.190703,  Lng: -77.773581),  Route carried "on" structure: Other road ,  Year Built: 1909,  Year Reconstructed: 1994,  Status: Posted for load-capacity,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 2,492 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,083 (year 2040),  Features Intersected: Erie Canal Heritage Trai,  Facility Carried by Structure: GILLETT ROAD
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 3.604,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Navigation Control: Yes ( Vertical Clearance: 5.1m (16.7ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 45.1m (148.0ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of replacement,  Length Of Structure Improvement: 5.69m (18.67ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $1,666,000,  Roadway Improvement Cost: $975,000,  Total Project Cost: $2,641,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 444316,  Location: 1.2MI W JCT BARGE C + 259 (Lat: 43.195856,  Lng: -77.823483),  Route carried "on" structure: Other road ,  Year Built: 1909,  Status: Posted for load,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 828 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,159 (year 2036),  Features Intersected: Erie Canal Bike Path, ER,  Facility Carried by Structure: TRIMMER ROAD
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.998,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 45.1m (148.0ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $2,182,000,  Roadway Improvement Cost: $1,278,000,  Total Project Cost: $3,460,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 444318,  Location: 1.4 MI E JCT BG CNL&SH260 (Lat: 43.202714,  Lng: -77.872667),  Route carried "on" structure: County highway ,  Year Built: 1908,  Year Reconstructed: 2003,  Status: Posted for load,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 1,020 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,428 (year 2040),  Features Intersected: Canalway Trail, ERIE CAN,  Facility Carried by Structure: CR 244- Gallup Rd
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.563,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 45.1m (148.0ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 10.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.69m (18.67ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $2,040,000,  Roadway Improvement Cost: $1,194,000,  Total Project Cost: $3,234,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 444359,  Location: .4 MI N JCT SH 31 & SH 36 (Lat: 43.195583,  Lng: -77.853828),  Route carried "on" structure: County highway ,  Year Built: 1912,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 3,077 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,807 (year 2040),  Design Load: HS 20,  Features Intersected: ERIE CANAL,  Facility Carried by Structure: WASHINGTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.2m (118.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.32m (14.17ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $3,875,000,  Roadway Improvement Cost: $2,269,000,  Total Project Cost: $6,144,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107469,  Location: JCT CO RD 208 & SH 531 (Lat: 43.160228,  Lng: -77.753847),  Route carried "under" structure: State highway 531,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2021),  Features Intersected: 531 531 43012059 WB, RTE,  Facility Carried by Structure: MANITOU ROAD
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 2.574,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 1074701,  Location: 2.6 MI E JCT SH259 &SH531 (Lat: 43.167044,  Lng: -77.760936),  Route carried "under" structure: County highway ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 1,015 (year 2019),  Truck Traffic: 4%,  Features Intersected: LYELL ROAD-CR 117,  Facility Carried by Structure: RTE 531
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 1.046,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 1074702,  Location: 2.6 MI E JCT SH259 &SH531 (Lat: 43.167044,  Lng: -77.761214),  Route carried "under" structure: County highway ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 1,184 (year 2015),  Truck Traffic: 3%,  Features Intersected: LYELL ROAD-CR 117,  Facility Carried by Structure: RTE 531
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 107471,  Location: 1.6 MI E JCT RTS 259& 531 (Lat: 43.175314,  Lng: -77.774039),  Route carried "under" structure: State highway 531,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 8,735 (year 1993),  Features Intersected: 531 531 43012041 WB, RTE,  Facility Carried by Structure: GILLETT ROAD
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 5.471,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 1074731,  Location: RT.531 W.B.OVER RTE 259 (Lat: 43.178733,  Lng: -77.804397),  Route carried "under" structure: State highway 259,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 6,899 (year 2018),  Truck Traffic: 3%,  Features Intersected: RTE 259,  Facility Carried by Structure: RTE 531
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 9.590,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 1074732,  Location: RT.531 E.B. OVER RTE 259 (Lat: 43.178531,  Lng: -77.804408),  Route carried "under" structure: State highway 259,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 4,355 (year 2018),  Truck Traffic: 4%,  Features Intersected: RTE 259,  Facility Carried by Structure: RTE 531
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 9.557,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.5m (155.8ft)

Discuss Ogden, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.