Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ohio, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 194ft / 59.0mTotal length
  • $20,497,000Total costs
  • 5,341Total average daily traffic
  • 537Total average daily truck traffic
  • 5,730Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ohio
  • No street view available for this location

New bridges in Ohio, NY - historical statistics
  • New bridges - historical statistics
  • 3Before 1900
  • 11900-1909
  • 21920-1929
  • 11950-1959
  • 41960-1969
  • 21980-1989
  • 51990-1999
  • 22010-2019
  • 22020-2022
Reconstructed bridges in Ohio, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 61980-1989
  • 21990-1999
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 21.1%Excellent
  • 10.5%Very good
  • 57.9%Good
  • 10.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 21.1%Excellent
  • 31.6%Very good
  • 36.8%Good
  • 5.3%Poor
  • 5.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.8%Excellent
  • 31.6%Good
  • 26.3%Satisfactory
  • 26.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 13.6%Excellent
  • 13.6%Very good
  • 9.1%Good
  • 31.8%Satisfactory
  • 22.7%Fair
  • 9.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Excellent
  • 33.3%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 100474,  Location: 7.5 MI N JCT RTS 8 & 28 (Lat: 43.291108,  Lng: -74.981431),  Route carried "on" structure: State highway 8,  Year Built: 1969,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 954 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 959 (year 2040),  Design Load: HS 20,  Features Intersected: BLACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.258,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.11m (13.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,491,000,  Roadway Improvement Cost: $873,000,  Total Project Cost: $2,364,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100475,  Location: .2 MI S JCT SH 8 & SH 365 (Lat: 43.365739,  Lng: -74.957828),  Route carried "on" structure: State highway 8,  Year Built: 1997,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 954 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 959 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WEST CANADA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.735,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 55.7m (182.7ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.73m (18.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,146,000,  Roadway Improvement Cost: $671,000,  Total Project Cost: $1,816,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100476,  Location: 5.8 MI N JCT SH 8 & SH365 (Lat: 43.395411,  Lng: -74.859833),  Route carried "on" structure: State highway 8,  Year Built: 1997,  Status: Open,  Structure Length: 9.20m (30.18ft),  Average Daily Traffic: 1,361 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,369 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WEST CANADA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.019,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.4m (149.0ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.11m (29.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,412,000,  Roadway Improvement Cost: $1,413,000,  Total Project Cost: $3,825,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 105375,  Location: 1.8 MI W JCT RTS 365 & 8 (Lat: 43.360817,  Lng: -74.989019),  Route carried "on" structure: State highway 365,  Year Built: 1951,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,277 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,332 (year 2040),  Design Load: H 20,  Features Intersected: FINCH POND OUTLET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.707,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $194,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $307,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 107985,  Location: Nobelsboro (Lat: 43.437422,  Lng: -74.831153),  Route carried "on" structure: ServiceState lands road ,  Year Built: 2014,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 36 (year 2016),  Average Future Daily Traffic: 50 (year 2036),  Design Load: HS 20,  Features Intersected: Big Brook,  Facility Carried by Structure: Haskell Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.114,  Lanes on structure: 1,  Owner: State Agenciy,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $205,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $324,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 108069,  Location: 3.3 MI NE JCT N&S Lake Rd (Lat: 43.558286,  Lng: -74.913503),  Route carried "on" structure: Other road ,  Year Built: 2020,  Status: Open,  Structure Length: 1.25m (4.10ft),  Design Load: HL 93,  Features Intersected: Golden Stair Creek,  Facility Carried by Structure: North Lake Rd.
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 5.358,  Lanes on structure: 1,  Owner: State Agenciy,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 220467,  Location: 1.0 MI NE GRAY (Lat: 43.272972,  Lng: -74.928867),  Route carried "on" structure: Other road ,  Year Built: 1920,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 35 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 49 (year 2037),  Features Intersected: MILL CREEK,  Facility Carried by Structure: TEA CUP STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Good,  Operating Rating: 22.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $120,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $190,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220468,  Location: 3 MI NE OF GRAY (Lat: 43.284808,  Lng: -74.900483),  Route carried "on" structure: Other road ,  Year Built: 1920,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 10 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 14 (year 2036),  Features Intersected: MILL CREEK,  Facility Carried by Structure: AMBERG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 2.7m (8.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $128,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $203,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 220469,  Location: 2.6 MILES NE OF GRAY (Lat: 43.285908,  Lng: -74.893950),  Route carried "on" structure: Other road ,  Year Built: 1965,  Year Reconstructed: 1989,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 50 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 70 (year 2036),  Features Intersected: MILL CREEK,  Facility Carried by Structure: BILLY HAMLIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $171,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $271,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220473,  Location: 0.2 MI N OF NOBLEBORO (Lat: 43.398531,  Lng: -74.861583),  Route carried "on" structure: Other road ,  Year Built: 1900,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 36 (year 2016),  Average Future Daily Traffic: 50 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: MILL CREEK,  Facility Carried by Structure: HASKELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $166,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $263,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 220474,  Location: E TIP OF HINCKLEY RESERVR (Lat: 43.355017,  Lng: -74.998728),  Route carried "on" structure: Other road ,  Year Built: 1895,  Year Reconstructed: 1986,  Status: Posted for load,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 232 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 325 (year 2037),  Features Intersected: WEST CANADA CREEK,  Facility Carried by Structure: HARVEY BRIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.590,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 7.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 5.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 7.55m (24.77ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $3,070,000,  Roadway Improvement Cost: $1,798,000,  Total Project Cost: $4,869,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220475,  Location: 2 MI N OF NORTH WILMURT (Lat: 43.477978,  Lng: -75.009428),  Route carried "on" structure: Other road ,  Year Built: 1895,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 10 (year 2018),  Average Future Daily Traffic: 14 (year 2038),  Features Intersected: BLACK RIVER,  Facility Carried by Structure: FARR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.539,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 29.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $229,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $363,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 220476,  Location: 1 MI N OF NORTH WILMURT (Lat: 43.450553,  Lng: -75.014697),  Route carried "on" structure: Other road ,  Year Built: 1895,  Year Reconstructed: 1989,  Status: Posted for load,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 10 (year 2018),  Average Future Daily Traffic: 14 (year 2038),  Features Intersected: TWIN LAKES STREAM,  Facility Carried by Structure: FARR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.353,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $111,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $177,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 226913,  Location: 1.5 M EAST WILMURT CORNER (Lat: 43.365614,  Lng: -74.892625),  Route carried "on" structure: Other road ,  Year Built: 2021,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 5 (year 2019),  Average Future Daily Traffic: 7 (year 2039),  Design Load: HL 93,  Features Intersected: FOUR MILE CREEK,  Facility Carried by Structure: ATWOOD LAKE ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 2.639,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 56.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226914,  Location: 1.5 MI E OF WILMURT CRNR (Lat: 43.366214,  Lng: -74.892556),  Route carried "on" structure: Other road ,  Year Built: 1996,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 5 (year 2019),  Average Future Daily Traffic: 7 (year 2039),  Design Load: H 20,  Features Intersected: FOUR MILE CREEK,  Facility Carried by Structure: ATWOOD LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.703,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Excellent,  Operating Rating: 72.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $247,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 330792,  Location: 1.1 MILES NORTH OF GRAY (Lat: 43.281083,  Lng: -74.950681),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 91 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 127 (year 2039),  Design Load: HS 20,  Features Intersected: N BR BLACK CREEK,  Facility Carried by Structure: CR4 GRAY WILMURT R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.963,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $443,000,  Roadway Improvement Cost: $259,000,  Total Project Cost: $702,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 330793,  Location: 2.8 MILES NORTH OF GRAY (Lat: 43.305422,  Lng: -74.942994),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 91 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 127 (year 2039),  Design Load: HS 20,  Features Intersected: MOUNTS CREEK,  Facility Carried by Structure: CR4 GRAY WILMURT R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.795,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $507,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 330794,  Location: 0.2 MI SW OF WILMURT (Lat: 43.373892,  Lng: -74.907881),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 23 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 32 (year 2038),  Design Load: HS 20,  Features Intersected: FOURMILE BROOK,  Facility Carried by Structure: CR69 GRAY WILMURT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.739,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.5m (60.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Poor,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $379,000,  Roadway Improvement Cost: $222,000,  Total Project Cost: $602,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330795,  Location: .1 MILE SOUTH OF WILMURT (Lat: 43.375144,  Lng: -74.905319),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 30 (year 2018),  Average Future Daily Traffic: 42 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: WEST CANADA CREEK,  Facility Carried by Structure: GRAY WILMURT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.868,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $574,000,  Roadway Improvement Cost: $336,000,  Total Project Cost: $911,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 330796,  Location: 2.5 MILES SW OF OHIO (Lat: 43.291639,  Lng: -75.001081),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 45 (year 2016),  Average Future Daily Traffic: 63 (year 2036),  Design Load: HL 93,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: CR73 FISHER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.825,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $678,000,  Roadway Improvement Cost: $397,000,  Total Project Cost: $1,076,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 330797,  Location: 2 MILES NORTHWEST OF GREY (Lat: 43.287344,  Lng: -74.965558),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 35 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 49 (year 2036),  Features Intersected: MOUNTS CREEK,  Facility Carried by Structure: CR112 SANTMIRE ROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.250,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $76,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $120,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 442307,  Location: S END NORTH L ATWELL NY (Lat: 43.522058,  Lng: -74.947683),  Route carried "on" structure: Other road ,  Year Built: 1964,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 51 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 71 (year 2039),  Design Load: H 20,  Features Intersected: Sluiceway, NORTH LAKE,  Facility Carried by Structure: NORTH LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.36m (17.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $858,000,  Roadway Improvement Cost: $502,000,  Total Project Cost: $1,360,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Discuss Ohio, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.