Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Olive, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 308ft / 93.6mTotal length
  • $84,254,000Total costs
  • 12,839Total average daily traffic
  • 843Total average daily truck traffic
  • 17,577Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Olive
  • No street view available for this location

New bridges in Olive, NY - historical statistics
  • New bridges - historical statistics
  • 31910-1919
  • 11920-1929
  • 11950-1959
  • 21980-1989
  • 11990-1999
  • 42000-2009
  • 22010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 18.2%Good
  • 9.1%Satisfactory
  • 27.3%Fair
  • 27.3%Poor
  • 9.1%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 8.3%Good
  • 8.3%Satisfactory
  • 8.3%Fair
  • 41.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Very good
  • 16.7%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 202038,  Location: JCT RTE 28&28A-ESOPUS CRK (Lat: 42.003908,  Lng: -74.267789),  Route carried "on" structure: Other road 28A,  Year Built: 1911,  Year Reconstructed: 1975,  Status: Posted for load-capacity,  Structure Length: 13.87m (45.51ft),  Average Daily Traffic: 1,417 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,984 (year 2036),  Design Load: HS 20,  Features Intersected: ESOPUS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Local Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 8,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 13.86m (45.47ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $9,497,000,  Roadway Improvement Cost: $5,561,000,  Total Project Cost: $15,058,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 202039,  Location: .3 MI W JCT SH 28A & SH28 (Lat: 42.003381,  Lng: -74.269989),  Route carried "on" structure: Alternate State highway 28A,  Year Built: 1911,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 1,417 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,984 (year 2036),  Features Intersected: EX-ULSTER & DELWR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Local Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Critical Feature Inspection Date: December 2020,  Bridge Improvement Cost: $1,422,000,  Roadway Improvement Cost: $833,000,  Total Project Cost: $2,255,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20204,  Location: 1.2 MI SW JCT SH 28 & SH2 (Lat: 41.992167,  Lng: -74.277700),  Route carried "on" structure: State highway 28A,  Year Built: 1981,  Status: Open,  Structure Length: 14.42m (47.31ft),  Average Daily Traffic: 1,417 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,984 (year 2036),  Design Load: HS 20,  Features Intersected: TRAVER HOLLOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.979,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Local Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 79.2m (259.8ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.41m (47.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $6,144,000,  Roadway Improvement Cost: $3,598,000,  Total Project Cost: $9,742,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 202041,  Location: 2.8 MI S JCT SH 28 & SH 2 (Lat: 41.971328,  Lng: -74.277122),  Route carried "on" structure: Alternate Other road 28A,  Year Built: 2009,  Status: Open,  Structure Length: 11.19m (36.71ft),  Average Daily Traffic: 1,417 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,984 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: DRY BROOK, Bush Kill
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.586,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Local Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.18m (36.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,180,000,  Roadway Improvement Cost: $1,862,000,  Total Project Cost: $5,042,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 202043,  Location: 1.0MI E JCT RTE 28A&213 (Lat: 41.944650,  Lng: -74.204686),  Route carried "on" structure: Alternate State highway 28A,  Year Built: 2010,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 1,551 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,171 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: ASHOKAN RESV OTLT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.881,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Local Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 85.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,001,000,  Roadway Improvement Cost: $586,000,  Total Project Cost: $1,587,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222441,  Location: 1.2 MI S OF SHOKAN (Lat: 41.951936,  Lng: -74.208378),  Route carried "on" structure: Other road ,  Year Built: 1914,  Status: Posted for load,  Structure Length: 35.45m (116.31ft),  Average Daily Traffic: 1,600 (year 1978),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,240 (year 1998),  Features Intersected: ASHOKAN RESERVOIR,  Facility Carried by Structure: RESERVOIR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 15,  Number Of Approach Spans: 5,  Length of Maximum Span: 22.5m (73.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Very good,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 35.44m (116.27ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $25,109,000,  Roadway Improvement Cost: $14,704,000,  Total Project Cost: $39,813,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222442,  Location: AT SHOKAN (Lat: 41.969958,  Lng: -74.210369),  Route carried "on" structure: Other road ,  Year Built: 2009,  Status: Open,  Structure Length: 0.91m (2.99ft),  Truck Traffic: 10%,  Design Load: HS 20,  Features Intersected: ASHOKAN RAIL TRAIL,  Facility Carried by Structure: RESERVOIR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft)

Condition: Culverts: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $399,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 227082,  Location: 3.5 MI NW JCT Rts. 28 & 2 (Lat: 42.006089,  Lng: -74.290400),  Route carried "on" structure: Other road ,  Year Built: 2012,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 7 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 10 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: Traver Hollow Creek,  Facility Carried by Structure: BRADKIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $123,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $194,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 304114,  Location: 0.75 MI S JCT RTS 28A&213 (Lat: 41.921878,  Lng: -74.214286),  Route carried "on" structure: County highway 213,  Year Built: 1929,  Status: Posted for load,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 1,114 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,162 (year 2040),  Features Intersected: TONGORE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.416,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $655,000,  Roadway Improvement Cost: $383,000,  Total Project Cost: $1,038,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334637,  Location: IN WEST SHOKAN (Lat: 41.967097,  Lng: -74.286989),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 1,016 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,422 (year 2040),  Design Load: HS 20,  Features Intersected: BUSHKILL CREEK,  Facility Carried by Structure: CR 42
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.056,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.0m (101.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.33m (20.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,402,000,  Roadway Improvement Cost: $1,407,000,  Total Project Cost: $3,809,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334669,  Location: 2.2 MI SW OF WEST SHOKAN (Lat: 41.949758,  Lng: -74.318419),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 7 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 10 (year 2039),  Features Intersected: BUSH KILL,  Facility Carried by Structure: SOUTH HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $786,000,  Roadway Improvement Cost: $460,000,  Total Project Cost: $1,246,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33468,  Location: 2.0 MI SW OF KRUMVILLE (Lat: 41.866072,  Lng: -74.266742),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 72 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 101 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: ROCHESTER CREEK,  Facility Carried by Structure: UPPER SAHLER MILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.751,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $423,000,  Roadway Improvement Cost: $248,000,  Total Project Cost: $670,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 334756,  Location: 0.4 MI W OF WEST SHOKAN (Lat: 41.966294,  Lng: -74.294742),  Route carried "on" structure: County highway ,  Year Built: 1957,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 1,016 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,422 (year 2040),  Design Load: H 20,  Features Intersected: MALTBY HOLLOW BROOK,  Facility Carried by Structure: COUNTY ROAD 42
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.348,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.5m (60.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Serious,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,254,000,  Roadway Improvement Cost: $734,000,  Total Project Cost: $1,988,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33477,  Location: AT SAMSONVILLE (Lat: 41.886739,  Lng: -74.296147),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 788 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,103 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: METTACAHONTS CRK,  Facility Carried by Structure: SAMSONVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $891,000,  Roadway Improvement Cost: $522,000,  Total Project Cost: $1,413,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Discuss Olive, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.