Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Oneonta, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 361ft / 110mTotal length
  • $38,081,000Total costs
  • 75,128Total average daily traffic
  • 6,263Total average daily truck traffic
  • 101,759Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Oneonta
  • No street view available for this location

New bridges in Oneonta, AL - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11930-1939
  • 21940-1949
  • 51950-1959
  • 51960-1969
  • 11970-1979
  • 21980-1989
  • 21990-1999
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Oneonta, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
  • 11980-1989
  • 11990-1999
Average Bridge Daily Traffic in Oneonta, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Excellent
  • 16.7%Very good
  • 25.0%Good
  • 8.3%Satisfactory
  • 41.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Excellent
  • 16.7%Very good
  • 25.0%Good
  • 16.7%Satisfactory
  • 33.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Excellent
  • 16.7%Good
  • 33.3%Satisfactory
  • 41.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.5%Excellent
  • 9.1%Very good
  • 9.1%Good
  • 36.4%Satisfactory
  • 40.9%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 81.8%Satisfactory
  • 18.2%Fair
Find on map >>   Show street view

Structure Number: 458,  Location: .2 MI NO OF SO CTY LM (Lat: 33.927778,  Lng: -86.495747),  Route carried "on" structure: City street 2,  Year Built: 1928,  Status: Posted for load,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 563 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 837 (year 2036),  Design Load: H 10,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.3m (30.5ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $603,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $663,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 678,  Location: .2 MI. NO. CO RD 42 (Lat: 33.999444,  Lng: -86.438333),  Route carried "on" structure: State highway 75,  Year Built: 1929,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 7,530 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 9,692 (year 2041),  Features Intersected: SAND VALLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.162,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $304,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $334,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3463,  Location: 2.2 MI S. AL 75 (Lat: 33.940833,  Lng: -86.440556),  Route carried "on" structure: US 231,  Year Built: 1949,  Status: Open,  Structure Length: 7.83m (25.69ft),  Average Daily Traffic: 11,015 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 18,051 (year 2040),  Design Load: H 15,  Features Intersected: ABANDONDED RR/NO TRACKS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 405.041,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 37.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 8.85m (29.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,880,000,  Roadway Improvement Cost: $188,000,  Total Project Cost: $2,068,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5635,  Location: @ NO. ONEONTA CITY LIMIT (Lat: 33.960833,  Lng: -86.445833),  Route carried "on" structure: State highway 132,  Year Built: 1957,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,190 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,672 (year 2041),  Features Intersected: CHAMPION CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.567,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 42.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $256,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6055,  Location: 3 1/2 MI NE OF ONEONTA (Lat: 33.980581,  Lng: -86.429739),  Route carried "on" structure: County highway 39,  Year Built: 1957,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 951 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,414 (year 2041),  Design Load: H 15,  Features Intersected: MURPHEE VALLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 85.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $401,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $441,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6056,  Location: 2 1/2 MI NE OF ONEONTA (Lat: 33.973469,  Lng: -86.443650),  Route carried "on" structure: County highway 39,  Year Built: 1957,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 970 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,441 (year 2040),  Design Load: H 15,  Features Intersected: CHAMPION CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $461,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $507,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6059,  Location: 3 MI NE OF ONEONTA (Lat: 33.984775,  Lng: -86.424672),  Route carried "on" structure: County highway 39,  Year Built: 1957,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 951 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,414 (year 2041),  Design Load: H 15,  Features Intersected: HOODS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.91m (9.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $825,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $908,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6174,  Location: 1 1/2 MI N OF INLAND (Lat: 33.876058,  Lng: -86.568864),  Route carried "on" structure: County highway 15,  Year Built: 1958,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 786 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,167 (year 2040),  Design Load: H 15,  Features Intersected: HENDRICK MILL BRANCH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 64.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $268,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $295,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7159,  Location: 1 1/2 MI E OF TIDWELL (Lat: 33.943600,  Lng: -86.558600),  Route carried "on" structure: County highway 33,  Year Built: 1960,  Status: Posted for load,  Structure Length: 6.89m (22.60ft),  Average Daily Traffic: 786 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,167 (year 2041),  Design Load: H 15,  Features Intersected: CALVERT PRONG
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $1,250,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,375,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8834,  Location: .1 MI SO ONEONTA CITY LIM (Lat: 33.926944,  Lng: -86.500000),  Route carried "on" structure: State highway 75,  Year Built: 1965,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 9,530 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,266 (year 2041),  Design Load: H 15,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.613,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 39.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,370,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $2,607,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9751,  Location: .8 MI. SO. CO RD 15 (Lat: 33.851111,  Lng: -86.567500),  Route carried "on" structure: State highway 75,  Year Built: 1968,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 8,210 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,567 (year 2041),  Design Load: H 15,  Features Intersected: BLACKBURN FORK CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.977,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,766,000,  Roadway Improvement Cost: $277,000,  Total Project Cost: $3,043,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9752,  Location: .7 MI. SO. CO RD 15 (Lat: 33.852481,  Lng: -86.566483),  Route carried "on" structure: US 75,  Year Built: 1968,  Status: Open,  Structure Length: 11.31m (37.11ft),  Average Daily Traffic: 4,105 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,283 (year 2041),  Design Load: HS 20,  Features Intersected: BLACKBURN RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.154,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 5,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 44.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.19m (39.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,507,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $2,758,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9753,  Location: .4 MI. SO CO RD 15 (Lat: 33.856564,  Lng: -86.563178),  Route carried "on" structure: State highway 75,  Year Built: 1968,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 4,105 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,283 (year 2041),  Design Load: HS 20,  Features Intersected: BLACKBURN FK WARRIOR RV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.635,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 7,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.69m (35.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,420,000,  Roadway Improvement Cost: $242,000,  Total Project Cost: $2,662,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11039,  Location: HORTON MILL (Lat: 34.007647,  Lng: -86.448661),  Route carried "on" structure: County highway 193,  Year Built: 1935,  Year Reconstructed: 1974,  Status: Closed,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 170 (year 2019),  Average Future Daily Traffic: 230 (year 2039),  Features Intersected: LITTLE WARRIOR,  Facility Carried by Structure: HORTON MILL RD.
Minimum Vertical Clearance: 2.59m (8.50ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 7.38m (24.21ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $708,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $779,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 11714,  Location: 3.5 MI EAST OF ONEONTA (Lat: 33.940444,  Lng: -86.542481),  Route carried "on" structure: County highway 449,  Year Built: 1976,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 54 (year 2020),  Average Future Daily Traffic: 80 (year 2040),  Features Intersected: CHITWOOD CREEK,  Facility Carried by Structure: FAULKNER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 14.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 8.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.05m (6.73ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $211,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $232,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 13102,  Location: .2 MI SO ROOSA CITY LIMIT (Lat: 33.972222,  Lng: -86.494444),  Route carried "on" structure: US 231,  Year Built: 1940,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 6,270 (year 2021),  Truck Traffic: 16%,  Average Future Daily Traffic: 8,150 (year 2041),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 412.063,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,811,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $1,992,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13717,  Location: 1 MI NORTH OF ALLGOOD (Lat: 33.919458,  Lng: -86.527067),  Route carried "on" structure: County highway 448,  Year Built: 1985,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 30 (year 2020),  Average Future Daily Traffic: 45 (year 2040),  Design Load: H 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: DAVIDSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $261,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $287,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14663,  Location: 2 MI NW OF TAITS GAP (Lat: 33.988036,  Lng: -86.418658),  Route carried "on" structure: County highway 270,  Year Built: 1988,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 330 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 491 (year 2041),  Design Load: HS 20,  Features Intersected: HOODS CREEK,  Facility Carried by Structure: HOODS CROSSROADS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $341,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $375,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 17034,  Location: .7 MI. SO.CO RD 15 . (Lat: 33.852500,  Lng: -86.566792),  Route carried "on" structure: State highway 75,  Year Built: 1998,  Status: Open,  Structure Length: 11.28m (37.01ft),  Average Daily Traffic: 4,105 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,283 (year 2041),  Design Load: HS 20,  Features Intersected: BLACKBURN FORK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 61.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.16m (39.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,501,000,  Roadway Improvement Cost: $350,000,  Total Project Cost: $3,851,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17035,  Location: .4 MI SO CO RD 15 (Lat: 33.855917,  Lng: -86.563847),  Route carried "on" structure: State highway 75,  Year Built: 1998,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 4,105 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,283 (year 2041),  Design Load: HS 20,  Features Intersected: BLACKBURN FORK WARRIOR R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.635,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 67.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.69m (35.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,079,000,  Roadway Improvement Cost: $308,000,  Total Project Cost: $3,387,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17893,  Location: .8 MI. NO CO RD 39 (Lat: 33.985708,  Lng: -86.442203),  Route carried "on" structure: State highway 75,  Year Built: 2013,  Status: Open,  Structure Length: 20.12m (66.01ft),  Average Daily Traffic: 7,530 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 9,692 (year 2041),  Design Load: HS 20,  Features Intersected: CALVERT PRONG(CHAMPION)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 52.598,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 86.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 20.12m (66.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $6,345,000,  Roadway Improvement Cost: $635,000,  Total Project Cost: $6,980,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18371,  Location: 1 MI S OF INLAND (Lat: 33.853053,  Lng: -86.565003),  Route carried "on" structure: County highway 75,  Year Built: 2005,  Status: Open,  Structure Length: 8.35m (27.40ft),  Average Daily Traffic: 805 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,196 (year 2042),  Design Load: HS 20,  Features Intersected: LITTLE WARRIOR (RELIEF),  Facility Carried by Structure: REMLAP DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 9.35m (30.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,923,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $2,115,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19823,  Location: 2.5 MI S OF ALLGOOD (Lat: 33.859992,  Lng: -86.554533),  Route carried "on" structure: County highway 1966,  Year Built: 2006,  Status: Open,  Structure Length: 1.17m (3.84ft),  Average Daily Traffic: 37 (year 2020),  Average Future Daily Traffic: 55 (year 2040),  Features Intersected: VALLEY CREEK,  Facility Carried by Structure: EVANS DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 3.8m (12.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $151,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $166,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Oneonta, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.