Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ossipee, New Hampshire (NH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 200ft / 61.4mTotal length
  • $72,266,000Total costs
  • 90,357Total average daily traffic
  • 5,288Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ossipee
  • No street view available for this location

New bridges in Ossipee, NH - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 21930-1939
  • 21940-1949
  • 31950-1959
  • 31960-1969
  • 21970-1979
  • 31990-1999
  • 32000-2009
  • 22010-2019
  • 32020-2022
Reconstructed bridges in Ossipee, NH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 21990-1999
  • 42000-2009
  • 12010-2019
Average Bridge Daily Traffic in Ossipee, NH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 21.1%Excellent
  • 15.8%Very good
  • 52.6%Good
  • 5.3%Satisfactory
  • 5.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 21.1%Excellent
  • 31.6%Very good
  • 31.6%Good
  • 10.5%Satisfactory
  • 5.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.8%Excellent
  • 21.1%Very good
  • 47.4%Good
  • 10.5%Satisfactory
  • 5.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.0%Excellent
  • 25.0%Very good
  • 35.0%Good
  • 25.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Excellent
  • 25.0%Very good
  • 50.0%Good
Find on map >>   Show street view

Structure Number: 204007500262,  Location: 0.01 MI W PINE HILL ROAD (Lat: 43.771328,  Lng: -71.239442),  Route carried "on" structure: Other road ,  Year Built: 1999,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 2.21m (7.25ft),  Average Daily Traffic: 81 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 119 (year 2042),  Features Intersected: LOVELL RIVER,  Facility Carried by Structure: BEAN MOUNTAIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.488,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 3.0m (9.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Very good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.21m (7.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 204009000268,  Location: 0.12 MI FR PINE HILL RD (Lat: 43.775064,  Lng: -71.228258),  Route carried "on" structure: Other road ,  Year Built: 1951,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 81 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 119 (year 2042),  Design Load: H 15,  Features Intersected: LOVELL RIVER,  Facility Carried by Structure: OSSIPEE MT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.112,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20401100022,  Location: 0.11 MI FR MOULTONVILLE (Lat: 43.740817,  Lng: -71.206944),  Route carried "on" structure: Other road ,  Year Built: 2018,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 81 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 119 (year 2042),  Features Intersected: DAN HOLE RIVER,  Facility Carried by Structure: VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.251,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Gravel,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 204011000282,  Location: 0.5 MI FR OSSIPEE RD (Lat: 43.786056,  Lng: -71.207236),  Route carried "on" structure: Other road ,  Year Built: 1940,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 81 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 119 (year 2042),  Design Load: HS 20,  Features Intersected: LOVELL RIVER,  Facility Carried by Structure: CHAPEL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.801,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 204011400328,  Location: 0.6 MI. TAMWORTH T.L. (Lat: 43.819111,  Lng: -71.206558),  Route carried "on" structure: State highway 25,  Year Built: 2005,  Status: Open,  Structure Length: 12.10m (39.70ft),  Average Daily Traffic: 3,994 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,911 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: BEARCAMP RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 132.002,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.10m (39.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 204012300233,  Location: 2.8 MI FR OLD NH RTE 16 (Lat: 43.751947,  Lng: -71.192769),  Route carried "on" structure: Other road ,  Year Built: 2007,  Status: Open,  Structure Length: 0.93m (3.05ft),  Average Daily Traffic: 374 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 553 (year 2042),  Design Load: HS 20,  Features Intersected: DAN HOLE RIVER,  Facility Carried by Structure: VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.208,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.4m (27.6ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.93m (3.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 204012300324,  Location: 0.8 MI. TAMWORTH T.L. (Lat: 43.816758,  Lng: -71.195681),  Route carried "on" structure: State highway 16,  Year Built: 1955,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 9,235 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,667 (year 2042),  Design Load: HS 20,  Features Intersected: CHOCORUA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 96.347,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 71.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 204012400163,  Location: 0.7 MI. TUFTONBORO TL (Lat: 43.702325,  Lng: -71.188431),  Route carried "on" structure: Other road ,  Year Built: 1997,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 81 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 119 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: BEECH RIVER,  Facility Carried by Structure: TUFTONBORO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.088,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.72m (2.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 204013800297,  Location: 2.5 MI S TAMWORTH T/L (Lat: 43.797386,  Lng: -71.181244),  Route carried "on" structure: State highway 16,  Year Built: 2021,  Status: Open,  Structure Length: 12.77m (41.90ft),  Average Daily Traffic: 9,235 (year 2020),  Average Future Daily Traffic: 13,667 (year 2042),  Design Load: HL 93,  Features Intersected: BEARCAMP RIVER
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 93.728,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 52.7m (172.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.77m (41.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 204013800299,  Location: 2.3 MI S TAMWORTH T/L (Lat: 43.799756,  Lng: -71.180761),  Route carried "on" structure: State highway 16,  Year Built: 2021,  Status: Open,  Structure Length: 5.44m (17.85ft),  Average Daily Traffic: 9,235 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,667 (year 2042),  Design Load: HL 93,  Features Intersected: RELIEF BEARCAMP RIVER
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 93.995,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 49.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.44m (17.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 204014700233,  Location: 0.14 MI FR MOULTONVILLE (Lat: 43.753203,  Lng: -71.168872),  Route carried "on" structure: Other road ,  Year Built: 2017,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 81 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 119 (year 2042),  Features Intersected: BROOK,  Facility Carried by Structure: PADDY ACRE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Excellent,  Operating Rating: 72.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 56.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 204014700235,  Location: 146 FT FR DANA MERROW RD (Lat: 43.754122,  Lng: -71.169531),  Route carried "on" structure: Other road ,  Year Built: 1940,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 24 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 35 (year 2042),  Design Load: HL 93,  Features Intersected: DAN HOLE RIVER,  Facility Carried by Structure: MILL HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 69.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 53.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.65m (2.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 204015300268,  Location: 4.3 MI S TAMWORTH T/L (Lat: 43.778158,  Lng: -71.165597),  Route carried "on" structure: State highway 16,  Year Built: 2021,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 9,235 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,667 (year 2042),  Design Load: HL 93,  Features Intersected: LOVELL RIVER
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 91.155,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 204015400195,  Location: 3.3 MI FR TUFTONBORO TL (Lat: 43.726622,  Lng: -71.158442),  Route carried "on" structure: Other road ,  Year Built: 1928,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 945 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,398 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: BEECH RIVER,  Facility Carried by Structure: TUFTONBORO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.050,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 204016500248,  Location: NEW NH 16 OVER OLD NH 16 (Lat: 43.762897,  Lng: -71.152036),  Route carried "on" structure: State highway 16,  Year Built: 1970,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 9,235 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,667 (year 2042),  Design Load: HS 20,  Features Intersected: OLD NH 16,OLD NH 25
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 89.079,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 204016900226,  Location: 0.14 MI FR TUFTONBORO RD (Lat: 43.747722,  Lng: -71.148503),  Route carried "on" structure: Other road ,  Year Built: 1994,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 81 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 119 (year 2042),  Features Intersected: DAN HOLE RIVER,  Facility Carried by Structure: ANNIE NICHOLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.217,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 204017500238,  Location: 6.0 MI TAMWORTH T.L. (Lat: 43.756556,  Lng: -71.141331),  Route carried "on" structure: State highway 16,  Year Built: 1969,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 6,004 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,885 (year 2042),  Design Load: HS 20,  Features Intersected: NH 25
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.968,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.2m (46.6ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 204017700229,  Location: .3 MI JCT. 16 (Lat: 43.750458,  Lng: -71.139753),  Route carried "on" structure: State highway ,  Year Built: 1932,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 1,823 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,698 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: BEECH RIVER,  Facility Carried by Structure: NH 16B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.526,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 204018300246,  Location: 0.6 MI FROM OLD N.H. 16 (Lat: 43.761967,  Lng: -71.134642),  Route carried "on" structure: State highway 25,  Year Built: 1963,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 3.82m (12.53ft),  Average Daily Traffic: 5,394 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,983 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: PINE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 142.290,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 87.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.82m (12.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 204019400146,  Location: 1.6 MI WOLFEBORO T.L. (Lat: 43.691350,  Lng: -71.117853),  Route carried "on" structure: State highway 28,  Year Built: 1959,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 4,662 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,899 (year 2042),  Design Load: HS 20,  Features Intersected: PAR(ABD)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 136.004,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 204023200121,  Location: 2.8 MI FROM WAKEFIELD TL (Lat: 43.674822,  Lng: -71.079686),  Route carried "on" structure: State highway 16,  Year Built: 1976,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 7,857 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,628 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: PINE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.149,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 204023500133,  Location: 0.5 MI E JCT RTE 16 (Lat: 43.684133,  Lng: -71.079300),  Route carried "on" structure: State highway ,  Year Built: 2004,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 81 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 119 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: PINE RIVER,  Facility Carried by Structure: GRANITE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.768,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: No rating analysis performed,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 204023800112,  Location: 2.4 MI FROM WAKEFIELD TL (Lat: 43.669464,  Lng: -71.073389),  Route carried "on" structure: State highway 16,  Year Built: 1930,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 7,857 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,628 (year 2042),  Design Load: H 15,  Features Intersected: PINE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 76.350,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.0m,  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 204017500238,  Location: 6.0 MI TAMWORTH T.L. (Lat: 43.756556,  Lng: -71.141331),  Route carried "under" structure: State highway 25,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 4,600 (year 2011),  Truck Traffic: 7%,  Features Intersected: NH 25,  Facility Carried by Structure: NH 16
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.3m (96.1ft)

Discuss Ossipee, New Hampshire (NH) on our hugely popular New Hampshire forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.