  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 194ft / 59.1mTotal length
  • $21,250,000Total costs
  • 18,147Total average daily traffic
  • 2,852Total average daily truck traffic
  • 25,351Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Packwood
  • No street view available for this location

New bridges in Packwood, WA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 41930-1939
  • 21950-1959
  • 61960-1969
  • 21970-1979
  • 22010-2019
  • 12020-2022
Reconstructed bridges in Packwood, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21950-1959
  • 01960-1969
  • 11970-1979
Average Bridge Daily Traffic in Packwood, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 22.2%Very good
  • 44.4%Good
  • 27.8%Satisfactory
  • 5.6%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 22.2%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Very good
  • 66.7%Good
  • 11.1%Satisfactory
  • 5.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 44.4%Very good
  • 33.3%Good
  • 22.2%Satisfactory
Find on map >>   Show street view

Structure Number: 952A,  Location: 14.0 E JCT SR 131 (Lat: 46.579111,  Lng: -121.688472),  Route carried "on" structure: US 12,  Year Built: 1928,  Year Reconstructed: 1962,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 3,134 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 4,036 (year 2039),  Design Load: H 15,  Features Intersected: HALL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 207.541,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 26.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $622,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,243,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1287A,  Location: 20.2 E JCT SR 131 (Lat: 46.648806,  Lng: -121.613583),  Route carried "on" structure: US 12,  Year Built: 1930,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 2,284 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,941 (year 2039),  Design Load: H 15,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 217.519,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Serious,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $563,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,126,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6681A,  Location: 12.9 E JCT SR 131 (Lat: 46.568444,  Lng: -121.705167),  Route carried "on" structure: US 12,  Year Built: 1962,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 3,134 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 4,036 (year 2039),  Design Load: HS 20,  Features Intersected: SMITH CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 205.771,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 20.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $608,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,216,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6681B,  Location: 13.3 E JCT SR 131 (Lat: 46.571753,  Lng: -121.698944),  Route carried "on" structure: US 12,  Year Built: 1962,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 3,134 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 4,036 (year 2039),  Design Load: HS 20,  Features Intersected: JOHNSON CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 206.398,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,260,000,  Roadway Improvement Cost: $252,000,  Total Project Cost: $2,520,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7117A,  Location: 18.4 E JCT SR 131 (Lat: 46.633333,  Lng: -121.642500),  Route carried "on" structure: US 12,  Year Built: 1963,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 2,526 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 3,253 (year 2039),  Design Load: HS 20,  Features Intersected: LAKE CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 214.719,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 33.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $672,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $1,344,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 60300000013426,  Location: 4.2 MILES NW OF HWY 12 ON (Lat: 46.632481,  Lng: -121.711964),  Route carried "on" structure: Federal lands road 47000,  Year Built: 2010,  Status: Open,  Structure Length: 4.59m (15.06ft),  Average Daily Traffic: 50 (year 2014),  Average Future Daily Traffic: 75 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: SKATE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.800,  Lanes on structure: 1,  Owner: U.S. Forest Service,  Approaching Roadway Width: 4.2m (13.8ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 36.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 60304000000069,  Location: 4.2 MILES NW FROM HWY12 O (Lat: 46.664189,  Lng: -121.686725),  Route carried "on" structure: Federal lands road 52700,  Year Built: 1963,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 8 (year 1992),  Average Future Daily Traffic: 12 (year 2042),  Features Intersected: BUTTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.120,  Lanes on structure: 1,  Owner: U.S. Forest Service,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 60305000013433,  Location: 2 1/2 MILES SOUTH OF FS R (Lat: 46.615281,  Lng: -121.733019),  Route carried "on" structure: Federal lands road 47150,  Year Built: 2010,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 2 (year 0000),  Average Future Daily Traffic: 3 (year 2042),  Design Load: HL 93,  Features Intersected: WILLAME CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.760,  Lanes on structure: 1,  Owner: U.S. Forest Service,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 81128,  Location: 2.83 N JCT US 12 (Lat: 46.633889,  Lng: -121.665778),  Route carried "on" structure: County highway 72650,  Year Built: 1976,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 749 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,353 (year 2038),  Design Load: HS 20,  Features Intersected: BUTTER CREEK,  Facility Carried by Structure: CANNON RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $748,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,496,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 81223,  Location: 1.0 NE PACKWOOD (Lat: 46.632667,  Lng: -121.641167),  Route carried "on" structure: County highway 72331,  Year Built: 1936,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 39 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 28 (year 2038),  Design Load: H 15,  Features Intersected: LAKE CREEK,  Facility Carried by Structure: THOMPSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.94m (16.21ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $875,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $1,750,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8135,  Location: 10.0 E RANDLE (Lat: 46.569997,  Lng: -121.709247),  Route carried "on" structure: County highway 70891,  Year Built: 1967,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 48 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 87 (year 2039),  Features Intersected: SLOUGH CREEK,  Facility Carried by Structure: STOVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $394,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $789,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 82009,  Location: 0.5 NW PACKWOOD (Lat: 46.611639,  Lng: -121.677806),  Route carried "on" structure: County highway 72651,  Year Built: 1955,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 1,331 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,404 (year 2039),  Design Load: HS 20,  Features Intersected: COWLITZ OVERFLOW,  Facility Carried by Structure: SKATE CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $626,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,251,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 82011,  Location: 1.5 NW PACKWOOD (Lat: 46.619900,  Lng: -121.691983),  Route carried "on" structure: County highway 72681,  Year Built: 1978,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 75 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 136 (year 2039),  Design Load: HS 20,  Features Intersected: SKATE CREEK,  Facility Carried by Structure: CRAIG RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $560,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $1,120,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 82012,  Location: 0.5 NW PACKWOOD (Lat: 46.612194,  Lng: -121.678806),  Route carried "on" structure: County highway 72651,  Year Built: 1953,  Year Reconstructed: 1964,  Status: Open,  Structure Length: 11.95m (39.21ft),  Average Daily Traffic: 1,331 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,404 (year 2039),  Design Load: HS 20,  Features Intersected: COWLITZ,  Facility Carried by Structure: SKATE CREEK ROAD
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 76.2m (250.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.95m (39.21ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: March 2021,  Bridge Improvement Cost: $2,430,000,  Roadway Improvement Cost: $486,000,  Total Project Cost: $4,861,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 82937,  Location: 0.5 SW PACKWOOD (Lat: 46.601406,  Lng: -121.672422),  Route carried "on" structure: County highway 71631,  Year Built: 1962,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 22 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 40 (year 2038),  Design Load: H 15,  Features Intersected: PUD TAILRACE,  Facility Carried by Structure: RIFFE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $360,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 84331,  Location: 3.0 SW PACKWOOD (Lat: 46.569997,  Lng: -121.709247),  Route carried "on" structure: County highway 71030,  Year Built: 1936,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 34 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 62 (year 2038),  Features Intersected: SMITH CREEK,  Facility Carried by Structure: BAKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $582,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,165,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 84339,  Location: 2.9 SW PACKWOOD (Lat: 46.571328,  Lng: -121.707881),  Route carried "on" structure: County highway 71030,  Year Built: 1936,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 34 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 62 (year 2038),  Features Intersected: VEACH CREEK,  Facility Carried by Structure: BAKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $374,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $749,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 89177,  Location: 0.2 E HWY 12 (Lat: 46.610178,  Lng: -121.664281),  Route carried "on" structure: County highway 72121,  Year Built: 2020,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 212 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 383 (year 2040),  Design Load: HL 93,  Features Intersected: HALL CREEK,  Facility Carried by Structure: SNYDER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $130,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $260,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Packwood, Washington (WA) on our hugely popular Washington forum.