Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Palenville, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 26Number of bridges
  • 157ft / 48.1mTotal length
  • $25,853,000Total costs
  • 30,983Total average daily traffic
  • 2,303Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Palenville
  • No street view available for this location

New bridges in Palenville, NY - historical statistics
  • New bridges - historical statistics
  • 2Before 1900
  • 21920-1929
  • 11930-1939
  • 11940-1949
  • 11960-1969
  • 11970-1979
  • 21980-1989
  • 81990-1999
  • 52000-2009
  • 32010-2019
Reconstructed bridges in Palenville, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31980-1989
  • 01990-1999
  • 02000-2009
  • 32010-2019
Average Bridge Daily Traffic in Palenville, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.5%Excellent
  • 22.7%Very good
  • 27.3%Good
  • 22.7%Satisfactory
  • 9.1%Fair
  • 13.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.8%Excellent
  • 8.3%Very good
  • 25.0%Good
  • 8.3%Satisfactory
  • 29.2%Fair
  • 8.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Excellent
  • 12.5%Very good
  • 25.0%Good
  • 8.3%Satisfactory
  • 29.2%Fair
  • 8.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.8%Excellent
  • 23.1%Very good
  • 42.3%Satisfactory
  • 26.9%Fair
  • 3.8%Serious
Find on map >>   Show street view

Structure Number: 101798,  Location: JCT 23A & KAATERSKILL FLS (Lat: 42.191269,  Lng: -74.070706),  Route carried "on" structure: State highway 23A,  Year Built: 1920,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 4,049 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,223 (year 2040),  Design Load: HS 20,  Features Intersected: SPRUCE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.750,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $579,000,  Roadway Improvement Cost: $339,000,  Total Project Cost: $918,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 101799,  Location: 1.8 MI W JCT SH23A &SH32A (Lat: 42.177064,  Lng: -74.054758),  Route carried "on" structure: State highway 23A,  Year Built: 1991,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 4,049 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,223 (year 2040),  Design Load: HS 20,  Features Intersected: KAATERSKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.115,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.7m (159.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.93m (16.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,305,000,  Roadway Improvement Cost: $764,000,  Total Project Cost: $2,070,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1018,  Location: .9 MI W JCT SH23A & SH32A (Lat: 42.176722,  Lng: -74.037064),  Route carried "on" structure: State highway 23A,  Year Built: 1985,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 4,049 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,223 (year 2040),  Design Load: HL 93,  Features Intersected: KAATERSKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.708,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,044,000,  Roadway Improvement Cost: $611,000,  Total Project Cost: $1,655,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101801,  Location: 0.5 MI NE JCT RTS 23A &32 (Lat: 42.194883,  Lng: -73.977814),  Route carried "on" structure: State highway 23A,  Year Built: 2000,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 3,923 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,092 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: KISKATOM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.468,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.0m (78.7ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $880,000,  Roadway Improvement Cost: $515,000,  Total Project Cost: $1,395,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102237,  Location: 0.1 MI S JCT RT 23A & 32 (Lat: 42.190775,  Lng: -73.985550),  Route carried "on" structure: State highway 32,  Year Built: 2011,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 2,967 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,164 (year 2040),  Design Load: HS 20,  Features Intersected: KAATERSKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.381,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $824,000,  Roadway Improvement Cost: $482,000,  Total Project Cost: $1,306,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 102238,  Location: 2.2 MI N JCT RTS 23A & 32 (Lat: 42.223606,  Lng: -73.987003),  Route carried "on" structure: State highway 32,  Year Built: 1941,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 2,893 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,085 (year 2040),  Features Intersected: KISTATOM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.130,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $405,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $641,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102255,  Location: 0.5MI S JCT RTS 23A $ 32A (Lat: 42.169825,  Lng: -74.016433),  Route carried "on" structure: State highway 32A,  Year Built: 1992,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 1,938 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,021 (year 2040),  Design Load: HS 20,  Features Intersected: KAATERSKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.030,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $590,000,  Roadway Improvement Cost: $345,000,  Total Project Cost: $935,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 220063,  Location: 1 MI NORTH OF PALENVILLE (Lat: 42.203931,  Lng: -73.999883),  Route carried "on" structure: Other road ,  Year Built: 1936,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 190 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 266 (year 2036),  Features Intersected: TB KATTERSKILL CK,  Facility Carried by Structure: BOGGART ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.478,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 78.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $235,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $373,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220065,  Location: 6 MI SW VILLAGE CATSKILL (Lat: 42.162283,  Lng: -73.968022),  Route carried "on" structure: Other road ,  Year Built: 1921,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 166 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 232 (year 2038),  Features Intersected: KAATERSKILL CREEK,  Facility Carried by Structure: HIGH FALLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.537,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 11.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $757,000,  Roadway Improvement Cost: $443,000,  Total Project Cost: $1,200,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222453,  Location: 1.0 MI SE OF PATENVILLE (Lat: 42.161483,  Lng: -74.005336),  Route carried "on" structure: Other road ,  Year Built: 1884,  Year Reconstructed: 1991,  Status: Posted for load,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 259 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 363 (year 2037),  Design Load: H 15,  Features Intersected: KAATERSKILL CREEK,  Facility Carried by Structure: DRUMMOND FALLS ROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 16.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $458,000,  Roadway Improvement Cost: $268,000,  Total Project Cost: $726,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 222454,  Location: 2.0 MI NW.OF CEMENTON (Lat: 42.147656,  Lng: -73.957833),  Route carried "on" structure: ServiceOther road ,  Year Built: 1985,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 200 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 280 (year 2037),  Features Intersected: KAATERSKILL CREEK,  Facility Carried by Structure: CHARLES SMITH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of replacement,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,156,000,  Roadway Improvement Cost: $677,000,  Total Project Cost: $1,833,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 227042,  Location: Catskill (Lat: 42.165528,  Lng: -74.006144),  Route carried "on" structure: Other road ,  Year Built: 2007,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 284 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 398 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: KAATERSKILL OVERFLOW,  Facility Carried by Structure: PENNSYLVANIA AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.786,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $143,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 227083,  Location: 0.6 MI SE JCT CR 33 & W.S (Lat: 42.106392,  Lng: -74.040617),  Route carried "on" structure: Other road ,  Year Built: 2012,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 223 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 312 (year 2038),  Design Load: HS 20,  Features Intersected: Plattekill Creek,  Facility Carried by Structure: KATE YAEGER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Inventory Rating: 69.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $237,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $376,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320059,  Location: 4 MI SW OF PURLING (Lat: 42.243031,  Lng: -74.028792),  Route carried "on" structure: Other road ,  Year Built: 1996,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 50 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 70 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: KISKATOM BROOK,  Facility Carried by Structure: WINTER CLOVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $308,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $488,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320062,  Location: 1 MI E OF LAWRENCEVILLE (Lat: 42.204658,  Lng: -73.974525),  Route carried "on" structure: Other road ,  Year Built: 2004,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 602 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 843 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: KISKATOM BROOK,  Facility Carried by Structure: MOUNTAIN TPK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.255,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.0m (42.7ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Fair,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $331,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $525,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 320064,  Location: HAMLET OF PALENVILLE (Lat: 42.172119,  Lng: -74.019042),  Route carried "on" structure: Other road ,  Year Built: 1975,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 589 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 825 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: KAATERSKILL CREEK,  Facility Carried by Structure: WOODSTOCK AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.303,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $666,000,  Roadway Improvement Cost: $390,000,  Total Project Cost: $1,056,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 320067,  Location: 2 MI NE HMLT PALENVILLE (Lat: 42.184211,  Lng: -73.971564),  Route carried "on" structure: Other road ,  Year Built: 2009,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 140 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 196 (year 2036),  Design Load: HS 20,  Features Intersected: KAATERSKILL CREEK,  Facility Carried by Structure: HIGH FALLS RD EXT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.0m (85.3ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $833,000,  Roadway Improvement Cost: $488,000,  Total Project Cost: $1,320,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 320102,  Location: 5 MI.SE TANNERSVILLE (Lat: 42.132897,  Lng: -74.082083),  Route carried "on" structure: Other road ,  Year Built: 1895,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 317 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 444 (year 2039),  Features Intersected: PLATTEKILL CREEK,  Facility Carried by Structure: PLATTECLOVE MT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Excellent,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 14.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $128,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $203,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 330301,  Location: HAMLET OF PLATTE CLOVE (Lat: 42.133814,  Lng: -74.086389),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 574 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 804 (year 2036),  Design Load: HS 20,  Features Intersected: PLATTEKILL CREEK,  Facility Carried by Structure: PLATTE CLOVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.415,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Serious,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $258,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $410,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330304,  Location: 5.5 MI NW JCT SH23A & SH3 (Lat: 42.202286,  Lng: -74.061967),  Route carried "on" structure: County highway ,  Year Built: 2013,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 747 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,046 (year 2036),  Design Load: HL 93,  Features Intersected: SPRUCE CREEK,  Facility Carried by Structure: MOUNTAIN HOUSE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.089,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 28.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $763,000,  Roadway Improvement Cost: $447,000,  Total Project Cost: $1,210,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334675,  Location: AT WEST SAUGERTIES (Lat: 42.112847,  Lng: -74.048939),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 989 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,385 (year 2037),  Design Load: HS 20,  Features Intersected: PLATTEKILL CREEK,  Facility Carried by Structure: COUNTY ROAD 33
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.390,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $846,000,  Roadway Improvement Cost: $496,000,  Total Project Cost: $1,342,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334681,  Location: 1.6 M NE OF W SAUGERTIES (Lat: 42.122989,  Lng: -74.021261),  Route carried "on" structure: County highway ,  Year Built: 1995,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 818 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,145 (year 2039),  Design Load: HS 20,  Features Intersected: PLATTEKILL CREEK,  Facility Carried by Structure: BLUE MOUNTAIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.285,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $692,000,  Roadway Improvement Cost: $405,000,  Total Project Cost: $1,097,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334682,  Location: 2.5 MI NE OF W SAUGERTIES (Lat: 42.131869,  Lng: -74.017539),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 818 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,145 (year 2039),  Design Load: HS 20,  Features Intersected: LUCAS KILL,  Facility Carried by Structure: BLUE MOUNTAIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.363,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.76m (5.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $897,000,  Roadway Improvement Cost: $525,000,  Total Project Cost: $1,422,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334727,  Location: 4 MI W JCT I87 & CR 212 (Lat: 42.112239,  Lng: -74.045883),  Route carried "on" structure: Other road ,  Year Built: 2001,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 91 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 127 (year 2037),  Design Load: H 20,  Features Intersected: PLATTEKILL CREEK,  Facility Carried by Structure: MILLARD BURNETT RO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.9m (58.7ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 69.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $502,000,  Roadway Improvement Cost: $294,000,  Total Project Cost: $796,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 334728,  Location: 0.3 MI W OF W SAUGERTIES (Lat: 42.115336,  Lng: -74.055703),  Route carried "on" structure: Other road ,  Year Built: 1996,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 58 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 81 (year 2037),  Design Load: HS 20,  Features Intersected: PLATTEKILL CREEK,  Facility Carried by Structure: BECKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 78.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $134,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $213,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 334779,  Location: 1.7 MI E OF W.SAUGERTIES (Lat: 42.109619,  Lng: -74.016508),  Route carried "on" structure: Other road ,  Year Built: 1966,  Status: Open,  Structure Length: 1.89m (6.20ft),  Truck Traffic: 10%,  Features Intersected: PLATTEKILL CREEK,  Facility Carried by Structure: VAN VLIERDEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 30.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $1,387,000,  Roadway Improvement Cost: $812,000,  Total Project Cost: $2,200,000 ( Estimate for 2021),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Palenville, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.