Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Palmyra, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 220ft / 67.3mTotal length
  • $38,900,000Total costs
  • 28,592Total average daily traffic
  • 1,816Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Palmyra
  • No street view available for this location

New bridges in Palmyra, NY - historical statistics
  • New bridges - historical statistics
  • 31910-1919
  • 11930-1939
  • 11960-1969
  • 11980-1989
  • 41990-1999
  • 12000-2009
  • 22010-2019
Reconstructed bridges in Palmyra, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
  • 11990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Palmyra, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Excellent
  • 9.1%Very good
  • 45.5%Good
  • 18.2%Satisfactory
  • 9.1%Fair
  • 9.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.2%Excellent
  • 18.2%Very good
  • 9.1%Good
  • 27.3%Satisfactory
  • 18.2%Fair
  • 9.1%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Excellent
  • 9.1%Very good
  • 27.3%Good
  • 27.3%Satisfactory
  • 18.2%Fair
  • 9.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 58.3%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 101649,  Location: .2 MI N JCT SH21 & BRG CL (Lat: 43.067975,  Lng: -77.217028),  Route carried "on" structure: State highway 21,  Year Built: 1994,  Status: Open,  Structure Length: 26.43m (86.71ft),  Average Daily Traffic: 3,227 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,920 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: KENT STREET, CSX TRANS/A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.216,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 54.8m (179.8ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 26.42m (86.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $7,763,000,  Roadway Improvement Cost: $4,546,000,  Total Project Cost: $12,309,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102172,  Location: 0.9 MI W JCT RTS 31 & 21 (Lat: 43.063361,  Lng: -77.249819),  Route carried "on" structure: State highway 31,  Year Built: 1992,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 10,380 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,428 (year 2040),  Design Load: HS 20,  Features Intersected: GANARGUA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.410,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.14m (13.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,558,000,  Roadway Improvement Cost: $912,000,  Total Project Cost: $2,470,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 331453,  Location: 2.2 MI E OF MACEDON (Lat: 43.061158,  Lng: -77.257025),  Route carried "on" structure: Other road ,  Year Built: 2014,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 1,496 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,094 (year 2040),  Design Load: HL 93,  Features Intersected: GANARGUA CREEK,  Facility Carried by Structure: YELLOW MILLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.928,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $552,000,  Roadway Improvement Cost: $323,000,  Total Project Cost: $876,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 331455,  Location: 2.8 MI N OF PALMYRA (Lat: 43.090789,  Lng: -77.248964),  Route carried "on" structure: County highway ,  Year Built: 2015,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,445 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,459 (year 2040),  Features Intersected: RED CREEK,  Facility Carried by Structure: MACEDON CENTER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.248,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $191,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $303,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 331457,  Location: 2.2 MI N OF PALMYRA (Lat: 43.087917,  Lng: -77.238553),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 1.29m (4.23ft),  Average Daily Traffic: 1,848 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,286 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: RED CREEK,  Facility Carried by Structure: CR210 MAPLE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.510,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Channel: Good,  Culverts: Very good,  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $461,000,  Roadway Improvement Cost: $270,000,  Total Project Cost: $730,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 331462,  Location: 1.5 MI SE OF E PALMYRA (Lat: 43.077408,  Lng: -77.178131),  Route carried "on" structure: Other road ,  Year Built: 1932,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 297 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 416 (year 2037),  Design Load: HS 20,  Features Intersected: GANARGUA CREEK,  Facility Carried by Structure: SOUTH CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $582,000,  Roadway Improvement Cost: $341,000,  Total Project Cost: $922,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331463,  Location: 2.7 MILES EAST OF PALMYRA (Lat: 43.070839,  Lng: -77.184697),  Route carried "on" structure: Other road ,  Year Built: 1984,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 343 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 480 (year 2037),  Features Intersected: GANARGUA CREEK,  Facility Carried by Structure: HOGBACK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $591,000,  Roadway Improvement Cost: $346,000,  Total Project Cost: $937,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 401648,  Location: JCT OF RTE 21 + BARGE C (Lat: 43.064875,  Lng: -77.220242),  Route carried "on" structure: State highway 21,  Year Built: 1961,  Status: Posted for load-capacity,  Structure Length: 10.06m (33.01ft),  Average Daily Traffic: 4,006 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,866 (year 2040),  Design Load: H 20,  Features Intersected: Erie Canal Heritage Trai
Minimum Vertical Clearance: 4.59m (15.06ft),  Kilometerpoint: 3.926,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Navigation Control: Yes ( Vertical Clearance: 4.6m (15.1ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 70.1m (230.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.05m (32.97ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $5,852,000,  Roadway Improvement Cost: $3,427,000,  Total Project Cost: $9,280,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 443718,  Location: 0.4 MI W JCT RTE 21 + C (Lat: 43.067339,  Lng: -77.229450),  Route carried "on" structure: City street ,  Year Built: 1913,  Year Reconstructed: 1987,  Status: Closed,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 1,993 (year 2008),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,790 (year 2028),  Features Intersected: ERIE CANAL,  Facility Carried by Structure: DIVISION STREET
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.1m (148.0ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 0.0m,  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Fair,  Channel: Good,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Bridge Improvement Cost: $2,882,000,  Roadway Improvement Cost: $1,688,000,  Total Project Cost: $4,570,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 443719,  Location: 0.6MI W JCT RTE 21 & CANL (Lat: 43.067122,  Lng: -77.233911),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 1,848 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,286 (year 2040),  Design Load: HS 20,  Features Intersected: ERIE CANAL,  Facility Carried by Structure: MAPLE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Navigation Control: Yes ( Vertical Clearance: 4.5m (14.8ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.5m (142.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.41m (14.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,384,000,  Roadway Improvement Cost: $810,000,  Total Project Cost: $2,194,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 44372,  Location: 1.1 MI SW JCT RTE 21 + C (Lat: 43.063592,  Lng: -77.258150),  Route carried "on" structure: County highway ,  Year Built: 1911,  Status: Posted for load,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 1,699 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,379 (year 2037),  Features Intersected: ERIE CANAL,  Facility Carried by Structure: WALWORTH ROAD
Minimum Vertical Clearance: 4.21m (13.81ft),  Kilometerpoint: 0.193,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Navigation Control: Yes ( Vertical Clearance: 4.5m (14.8ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.1m (148.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Very good,  Operating Rating: 21.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $2,307,000,  Roadway Improvement Cost: $1,351,000,  Total Project Cost: $3,658,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 443725,  Location: ACCESS TO LOCK 29 (Lat: 43.064669,  Lng: -77.248767),  Route carried "on" structure: ServiceOther road ,  Year Built: 1914,  Year Reconstructed: 1955,  Status: Posted for load,  Structure Length: 3.32m (10.89ft),  Design Load: H 20,  Features Intersected: GANARGUA CREEK,  Facility Carried by Structure: LOCK 29 ACCESS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 23.4m (76.8ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 19.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $411,000,  Roadway Improvement Cost: $241,000,  Total Project Cost: $651,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 101649,  Location: .2 MI N JCT SH21 & BRG CL (Lat: 43.067975,  Lng: -77.217028),  Route carried "under" structure: Other road ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 10 (year 2021),  Features Intersected: KENT STREET, CSX TRANS/A,  Facility Carried by Structure: RTE 21
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.8m (179.8ft)

Discuss Palmyra, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.