  • 21Number of bridges
  • 144ft / 43.6mTotal length
  • $4,400,000Total costs
  • 41,136Total average daily traffic
  • 3,873Total average daily truck traffic
  • 66,627Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Parsons
  • No street view available for this location

New bridges in Parsons, TN - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 31950-1959
  • 11960-1969
  • 61970-1979
  • 31980-1989
  • 21990-1999
  • 22000-2009
  • 22010-2019
Average Bridge Daily Traffic in Parsons, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 62.5%Good
  • 37.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 37.5%Good
  • 37.5%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 37.5%Good
  • 37.5%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 19.0%Good
  • 81.0%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 38.5%Good
  • 46.2%Satisfactory
  • 15.4%Fair
Find on map >>   Show street view

Structure Number: 20017390001,  Location: 3.2 MI NE JCT SR20&SR69 (Lat: 35.672000,  Lng: -88.078781),  Route carried "on" structure: County highway 1739,  Year Built: 1976,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 388 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 621 (year 2042),  Design Load: H 15,  Features Intersected: TARRAPIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.621,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $191,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $287,000 ( Estimate for 2022),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200A0160001,  Location: 2.7 MI NW JCT SR20&SR69 (Lat: 35.660167,  Lng: -88.177111),  Route carried "on" structure: County highway 16,  Year Built: 1972,  Status: Posted for load,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 10 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 16 (year 2042),  Design Load: H 10,  Features Intersected: ARMS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.147,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 10.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 8.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $52,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $79,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 200A0180001,  Location: 2.1 MI W JCT SR20&SR69 (Lat: 35.648417,  Lng: -88.163972),  Route carried "on" structure: County highway 18,  Year Built: 1977,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 40 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 64 (year 2040),  Design Load: H 15,  Features Intersected: JOHNSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.416,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200A0320001,  Location: 2.4 MI NW JCT SR20&SR69 (Lat: 35.684917,  Lng: -88.132056),  Route carried "on" structure: County highway 32,  Year Built: 1984,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 940 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,504 (year 2040),  Design Load: HS 20,  Features Intersected: SHIPMAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.378,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $61,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $92,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200A0320003,  Location: 2.2 MI NE JCT SR20&SR69 (Lat: 35.678528,  Lng: -88.106111),  Route carried "on" structure: County highway 32,  Year Built: 1977,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 290 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 464 (year 2040),  Design Load: H 15,  Features Intersected: SHORT AND DIRTY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.919,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200A0380001,  Location: 5.1 MI N JCT SR20&SR69 (Lat: 35.717500,  Lng: -88.116139),  Route carried "on" structure: County highway 38,  Year Built: 2006,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 130 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 208 (year 2040),  Design Load: HS 20,  Features Intersected: STORMS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.196,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 79.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200A1600001,  Location: 2.1 MI SE JCT SR20&SR69 (Lat: 35.628611,  Lng: -88.101639),  Route carried "on" structure: County highway 160,  Year Built: 2004,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 200 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 320 (year 2040),  Features Intersected: HERRON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.456,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.0m (78.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200A1690001,  Location: 1 M SW JCT SR 20&SR 100 (Lat: 35.632667,  Lng: -88.053444),  Route carried "on" structure: County highway 169,  Year Built: 1990,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 50 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.135,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 200A3890003,  Location: 1.7 MI SE JCT SR20&SR202 (Lat: 35.619722,  Lng: -88.159250),  Route carried "on" structure: County highway 389,  Year Built: 1984,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 130 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 208 (year 2040),  Design Load: HS 20,  Features Intersected: JOHNSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.231,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200A3890005,  Location: 2.1 MI SE JCT SR20&SR202 (Lat: 35.619833,  Lng: -88.150250),  Route carried "on" structure: County highway 389,  Year Built: 1955,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 130 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 208 (year 2040),  Design Load: H 15,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.059,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: 20S80640003,  Location: 4.3 MI NW JCT SR20&SR69 (Lat: 35.711583,  Lng: -88.137861),  Route carried "on" structure: County highway 5577,  Year Built: 1954,  Status: Posted for load,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 403 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 864 (year 2040),  Design Load: H 15,  Features Intersected: CUB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.789,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $201,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $302,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20S80640009,  Location: 3.4 MI NW JCT SR20&SR69 (Lat: 35.697417,  Lng: -88.153500),  Route carried "on" structure: County highway 5577,  Year Built: 1954,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 822 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,504 (year 2041),  Design Load: H 20,  Features Intersected: SULPHUR FORK CUB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.091,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.36m (14.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $229,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 20S80640011,  Location: 2.5 MI NW JCT SR20&SR69 (Lat: 35.684833,  Lng: -88.138639),  Route carried "on" structure: County highway 5577,  Year Built: 1972,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 822 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,504 (year 2040),  Design Load: H 20,  Features Intersected: ROCKY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.344,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20S80680007,  Location: .13 MI.S.OF SR020 (Lat: 35.633056,  Lng: -88.049028),  Route carried "on" structure: County highway 511,  Year Built: 1960,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 320 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 512 (year 2040),  Design Load: H 15,  Features Intersected: PIKES PEAK BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.160,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: 20SR0200001,  Location: 1.48 MI.WEST OF PARSONS (Lat: 35.640750,  Lng: -88.174000),  Route carried "on" structure: State highway 20,  Year Built: 2011,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 5,904 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 9,072 (year 2040),  Design Load: HL 93,  Features Intersected: ARMS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.384,  Lanes on structure: 50,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 26.3m (86.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20SR0200003,  Location: .87 MI.WEST OF PARSONS (Lat: 35.642883,  Lng: -88.163633),  Route carried "on" structure: State highway 20,  Year Built: 2011,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 5,904 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 9,072 (year 2040),  Design Load: HL 93,  Features Intersected: JOHNSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.350,  Lanes on structure: 50,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 26.3m (86.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20SR0200005,  Location: IN PARSONS CITY LIMITS (Lat: 35.648417,  Lng: -88.140472),  Route carried "on" structure: State highway 20,  Year Built: 1986,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 6,600 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 11,440 (year 2040),  Design Load: HS 20,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.506,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $248,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $373,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 20SR0200007,  Location: IN PARSONS CITY LIMITS (Lat: 35.649028,  Lng: -88.137500),  Route carried "on" structure: State highway 20,  Year Built: 1932,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 6,600 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 10,560 (year 2042),  Design Load: H 15,  Features Intersected: BUCKNER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.812,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $221,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $332,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20SR0200009,  Location: .17 MI.EAST OF PARSONS (Lat: 35.645389,  Lng: -88.102806),  Route carried "on" structure: State highway 20,  Year Built: 1930,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,609 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,648 (year 2040),  Design Load: H 15,  Features Intersected: RAINS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.031,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $205,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $308,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 20SR0690017,  Location: 1.4 MI.SO.OF JEANNETTE (Lat: 35.716056,  Lng: -88.105639),  Route carried "on" structure: State highway 69,  Year Built: 1973,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 5,304 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 8,486 (year 2042),  Design Load: HS 20,  Features Intersected: CUB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.559,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 63.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.86m (22.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,598,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $2,398,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 20SR1000005,  Location: .2 M S JCT SR 20&SR 100 (Lat: 35.632000,  Lng: -88.050583),  Route carried "on" structure: State highway 100,  Year Built: 1990,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,540 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,272 (year 2040),  Design Load: HS 20,  Features Intersected: PIKES PEAKS BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.009,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021