Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Patterson, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 102ft / 30.8mTotal length
  • $29,040,000Total costs
  • 195,094Total average daily traffic
  • 22,299Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Patterson
  • No street view available for this location

New bridges in Patterson, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 31910-1919
  • 21930-1939
  • 11950-1959
  • 121960-1969
  • 21980-1989
  • 21990-1999
Reconstructed bridges in Patterson, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 52000-2009
Average Bridge Daily Traffic in Patterson, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.4%Very good
  • 15.4%Good
  • 46.2%Satisfactory
  • 23.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 38.5%Good
  • 38.5%Satisfactory
  • 23.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Very good
  • 30.8%Good
  • 38.5%Satisfactory
  • 7.7%Fair
  • 15.4%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 83.3%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 101668,  Location: 0.4 MI N JCT RTS 22+164 (Lat: 41.478217,  Lng: -73.578819),  Route carried "on" structure: State highway 22,  Year Built: 1932,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 13,128 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 13,189 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CROTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,808,000,  Roadway Improvement Cost: $1,059,000,  Total Project Cost: $2,866,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10456,  Location: 0.4 MI W JCT RTS 311+22 (Lat: 41.514342,  Lng: -73.598553),  Route carried "on" structure: State highway 311,  Year Built: 1958,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 7,821 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,500 (year 2040),  Design Load: HS 20,  Features Intersected: E BR CROTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.187,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,822,000,  Roadway Improvement Cost: $1,067,000,  Total Project Cost: $2,889,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1052771,  Location: I84 INT 18 (Lat: 41.474172,  Lng: -73.648692),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 22,655 (year 1996),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: RTE 311
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.436,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.0m (114.8ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.62m (11.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,913,000,  Roadway Improvement Cost: $1,120,000,  Total Project Cost: $3,034,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1052772,  Location: I84 INT 18 (Lat: 41.474072,  Lng: -73.649253),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 21,413 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 36,261 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 311
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.342,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.0m (114.8ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.62m (11.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,911,000,  Roadway Improvement Cost: $1,119,000,  Total Project Cost: $3,030,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1052781,  Location: .6 MI SE I84 EXIT 18 (Lat: 41.465556,  Lng: -73.644239),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 22,655 (year 1996),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: FAIR STREET-CR 60
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.404,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,271,000,  Roadway Improvement Cost: $1,330,000,  Total Project Cost: $3,601,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1052782,  Location: .6 MI SE I84 EXIT 18 (Lat: 41.465283,  Lng: -73.644675),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 21,413 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 36,261 (year 2040),  Design Load: HS 20,  Features Intersected: FAIR STREET-CR 60
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.372,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,216,000,  Roadway Improvement Cost: $1,297,000,  Total Project Cost: $3,513,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1052791,  Location: 1.7 MI E I84 INT 18 (Lat: 41.451450,  Lng: -73.638106),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 22,655 (year 1996),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: BULLET HOLE ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 8.045,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,905,000,  Roadway Improvement Cost: $1,116,000,  Total Project Cost: $3,021,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1052792,  Location: 1.7 MI E I84 INT 18 (Lat: 41.451253,  Lng: -73.638511),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 21,413 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 36,261 (year 2040),  Design Load: HS 20,  Features Intersected: BULLET HOLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.029,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,896,000,  Roadway Improvement Cost: $1,110,000,  Total Project Cost: $3,006,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 222387,  Location: 1.2 MILES SE OF HOLMES (Lat: 41.509083,  Lng: -73.633442),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 777 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,088 (year 2037),  Features Intersected: Maybrook Trailway, MNRR,  Facility Carried by Structure: MOONEY HILL ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Owner: Railroad,  Maintenance Responsibility: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $682,000,  Roadway Improvement Cost: $399,000,  Total Project Cost: $1,081,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334546,  Location: 2 MI NE OF CR 65 ON CR 68 (Lat: 41.498367,  Lng: -73.534658),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 2,891 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,015 (year 2040),  Design Load: HS 20,  Features Intersected: QUAKER BROOK,  Facility Carried by Structure: HAVLND HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.894,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $415,000,  Roadway Improvement Cost: $243,000,  Total Project Cost: $659,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 334547,  Location: 3.3 MILES SE OF PATTERSON (Lat: 41.494533,  Lng: -73.546639),  Route carried "on" structure: Other road ,  Year Built: 1938,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 419 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 587 (year 2037),  Features Intersected: HAVILAND HLLW BRK,  Facility Carried by Structure: BRIMSTONE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Inventory Rating: 80.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $274,000,  Total Project Cost: $743,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334548,  Location: 1.3 MI NW OF PATTERSON (Lat: 41.494197,  Lng: -73.606981),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 949 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,329 (year 2037),  Design Load: HS 20,  Features Intersected: MUDDY BROOK,  Facility Carried by Structure: CORNWALL HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.802,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $476,000,  Roadway Improvement Cost: $279,000,  Total Project Cost: $755,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334549,  Location: .3 MILE SE OF PATTERSON (Lat: 41.484228,  Lng: -73.570661),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 2,397 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,911 (year 2040),  Design Load: HS 20,  Features Intersected: HAVILAND HOLLOW BROOK,  Facility Carried by Structure: EAST BRANCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.047,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $531,000,  Roadway Improvement Cost: $311,000,  Total Project Cost: $842,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1052771,  Location: I84 INT 18 (Lat: 41.474172,  Lng: -73.648692),  Route carried "under" structure: State highway 311,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 9,770 (year 2002),  Features Intersected: RTE 311,  Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 1.641,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.0m (114.8ft)

Find on map >>   Show street view

Structure Number: 1052772,  Location: I84 INT 18 (Lat: 41.474072,  Lng: -73.649253),  Route carried "under" structure: State highway 311,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 9,770 (year 2002),  Features Intersected: RTE 311,  Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 1.641,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.0m (114.8ft)

Find on map >>   Show street view

Structure Number: 1052781,  Location: .6 MI SE I84 EXIT 18 (Lat: 41.465556,  Lng: -73.644239),  Route carried "under" structure: County highway ,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 900 (year 1982),  Features Intersected: FAIR STREET-CR 60,  Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.9m (94.8ft)

Find on map >>   Show street view

Structure Number: 1052782,  Location: .6 MI SE I84 EXIT 18 (Lat: 41.465283,  Lng: -73.644675),  Route carried "under" structure: County highway ,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 900 (year 1982),  Features Intersected: FAIR STREET-CR 60,  Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 1052791,  Location: 1.7 MI E I84 INT 18 (Lat: 41.451450,  Lng: -73.638106),  Route carried "under" structure: Other road ,  Year Built: 1968,  Structure Length: 0. m,  Features Intersected: BULLET HOLE ROAD,  Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 1052792,  Location: 1.7 MI E I84 INT 18 (Lat: 41.451253,  Lng: -73.638511),  Route carried "under" structure: Other road ,  Year Built: 1968,  Structure Length: 0. m,  Features Intersected: BULLET HOLE ROAD,  Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.3m (79.7ft)

Find on map >>   Show street view

Structure Number: 704136,  Location: 0.34 MI N JCT 164&311 (Lat: 41.489053,  Lng: -73.624683),  Route carried "under" structure: State highway 311,  Year Built: 1907,  Structure Length: 0. m,  Average Daily Traffic: 5,530 (year 2002),  Features Intersected: RTE 311,  Facility Carried by Structure: MNRR BE LINE
Minimum Vertical Clearance: 3.65m (11.98ft),  Kilometerpoint: 4.682,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 8.5m (27.9ft)

Find on map >>   Show street view

Structure Number: 704137,  Location: 0.25 MI E JCT 311&164 (Lat: 41.484325,  Lng: -73.622181),  Route carried "under" structure: State highway 164,  Year Built: 1915,  Structure Length: 0. m,  Average Daily Traffic: 2,546 (year 2002),  Features Intersected: RTE 164,  Facility Carried by Structure: MNRR BE LINE
Minimum Vertical Clearance: 3.96m (12.99ft),  Kilometerpoint: 0.402,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 7.3m (24.0ft)

Find on map >>   Show street view

Structure Number: 704138,  Location: 0.50 MI E JCT 311&164 (Lat: 41.482867,  Lng: -73.618033),  Route carried "under" structure: State highway 164,  Year Built: 1915,  Structure Length: 0. m,  Average Daily Traffic: 2,546 (year 2002),  Features Intersected: RTE 164,  Facility Carried by Structure: Future rail trail
Minimum Vertical Clearance: 3.78m (12.40ft),  Kilometerpoint: 0.805,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 9.4m (30.8ft)

Find on map >>   Show street view

Structure Number: 704139,  Location: 0.80 MI E JCT 311&164 (Lat: 41.479717,  Lng: -73.611622),  Route carried "under" structure: State highway 164,  Year Built: 1915,  Structure Length: 0. m,  Average Daily Traffic: 2,546 (year 2002),  Features Intersected: RTE 164,  Facility Carried by Structure: MNRR HA LINE
Minimum Vertical Clearance: 3.99m (13.09ft),  Kilometerpoint: 1.287,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 7.9m (25.9ft)

Discuss Patterson, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.