Bridge Statistics for Pawling, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 59ft / 17.9mTotal length
  • $13,665,000Total costs
  • 30,158Total average daily traffic
  • 2,513Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pawling
  • No street view available for this location

New bridges in Pawling, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 31950-1959
  • 21960-1969
  • 31990-1999
  • 12000-2009
Reconstructed bridges in Pawling, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Pawling, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 44.4%Good
  • 33.3%Satisfactory
  • 11.1%Fair
  • 11.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 55.6%Good
  • 22.2%Satisfactory
  • 11.1%Fair
  • 11.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.2%Very good
  • 11.1%Good
  • 22.2%Satisfactory
  • 44.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Good
  • 57.1%Satisfactory
  • 14.3%Fair
  • 14.3%Poor
Find on map >>   Show street view

Structure Number: 101669,  Location: 0.5 MI N PUTNAM CO LINE (Lat: 41.531869,  Lng: -73.585344),  Route carried "on" structure: State highway 22,  Year Built: 1999,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 16,297 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,451 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BRADY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.788,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 18.5m (60.7ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $549,000,  Total Project Cost: $1,487,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 101671,  Location: JCT RTS 22+55 1.9 MI N CL (Lat: 41.550603,  Lng: -73.591864),  Route carried "on" structure: State highway 55,  Year Built: 1962,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 6.10m (20.01ft),  Truck Traffic: 11%,  Design Load: HS 20,  Features Intersected: 22 22 82051019 NB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.924,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.09m (19.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,722,000,  Roadway Improvement Cost: $1,594,000,  Total Project Cost: $4,315,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10272,  Location: .5 MI W JCT SH55 & 22 (Lat: 41.550178,  Lng: -73.601847),  Route carried "on" structure: State highway 55,  Year Built: 2000,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 4,596 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,617 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MNRR HA LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.087,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,396,000,  Roadway Improvement Cost: $817,000,  Total Project Cost: $2,213,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104134,  Location: 0.1 MI S JCT RTS 292 + 55 (Lat: 41.586233,  Lng: -73.659278),  Route carried "on" structure: State highway 292,  Year Built: 1991,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 810 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 844 (year 2040),  Design Load: HS 20,  Features Intersected: WHALEY LAKE STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.236,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 56.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $399,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 104135,  Location: 3.5 MI S JCT SH292 & SH55 (Lat: 41.547792,  Lng: -73.659419),  Route carried "on" structure: State highway 292,  Year Built: 1959,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 810 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 844 (year 2040),  Design Load: H 20,  Features Intersected: Maybrook Trailway, MNRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.974,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.86m (9.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,649,000,  Roadway Improvement Cost: $966,000,  Total Project Cost: $2,615,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222304,  Location: .5 MILE NW OF PAWLING (Lat: 41.562408,  Lng: -73.603792),  Route carried "on" structure: Other road ,  Year Built: 1935,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,780 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,202 (year 2040),  Features Intersected: PAWLING CREEK,  Facility Carried by Structure: WEST MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Operating Rating: 88.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $270,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $428,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 226872,  Location: 2 MI W VILLAGE OF PAWLING (Lat: 41.611217,  Lng: -73.580400),  Route carried "on" structure: Other road ,  Year Built: 1950,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 405 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 567 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: SWAMP RIVER,  Facility Carried by Structure: KITCHEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $157,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $249,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 234346,  Location: 0.9 MI SW OF HURD CORNERS (Lat: 41.584142,  Lng: -73.597764),  Route carried "on" structure: Other road ,  Year Built: 1993,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 544 (year 2014),  Truck Traffic: 13%,  Average Future Daily Traffic: 762 (year 2034),  Design Load: HS 20,  Features Intersected: SWAMP RIVER,  Facility Carried by Structure: RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $525,000,  Roadway Improvement Cost: $307,000,  Total Project Cost: $832,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 234347,  Location: 0.6 MI NE OF PAWLING (Lat: 41.570542,  Lng: -73.599725),  Route carried "on" structure: Other road ,  Year Built: 1928,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,778 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,489 (year 2040),  Features Intersected: SWAMP RIVER,  Facility Carried by Structure: CHARLES COLEMAN BO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $413,000,  Roadway Improvement Cost: $242,000,  Total Project Cost: $654,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 234348,  Location: 2.2 MI SE OF PAWLING (Lat: 41.537506,  Lng: -73.576906),  Route carried "on" structure: Other road ,  Year Built: 1957,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 378 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 529 (year 2040),  Design Load: HS 20,  Features Intersected: BRADY BROOK,  Facility Carried by Structure: RAVINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $298,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $473,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 101671,  Location: JCT RTS 22+55 1.9 MI N CL (Lat: 41.550603,  Lng: -73.591864),  Route carried "under" structure: State highway 22,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 2,760 (year 1999),  Features Intersected: 22 22 82051019 NB, RTE,  Facility Carried by Structure: RTE 55
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 3.089,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.3m (56.8ft)