Bridge Statistics for Pe Ell, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 184ft / 56.2mTotal length
  • $26,573,000Total costs
  • 15,153Total average daily traffic
  • 2,384Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pe Ell
  • No street view available for this location

New bridges in Pe Ell, WA - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 51950-1959
  • 11960-1969
  • 11970-1979
  • 31980-1989
  • 21990-1999
  • 32010-2019
Average Bridge Truck Traffic in Pe Ell, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 44.4%Very good
  • 38.9%Good
  • 16.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 44.4%Very good
  • 22.2%Good
  • 27.8%Satisfactory
  • 5.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 38.9%Very good
  • 27.8%Good
  • 16.7%Satisfactory
  • 16.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 44.4%Very good
  • 22.2%Good
  • 27.8%Satisfactory
  • 5.6%Fair
Find on map >>   Show street view

Structure Number: 1351A,  Location: 0.4 E PACIFIC CO (Lat: 46.552222,  Lng: -123.351361),  Route carried "on" structure: State highway 6,  Year Built: 1930,  Status: Open,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 1,371 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,765 (year 2039),  Design Load: H 15,  Features Intersected: ROCK CR NP RY-ABANDONED
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.234,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 7.80m (25.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,536,000,  Roadway Improvement Cost: $307,000,  Total Project Cost: $3,072,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1490A,  Location: 5.7 E PACIFIC CO (Lat: 46.595722,  Lng: -123.279306),  Route carried "on" structure: State highway 6,  Year Built: 1931,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 2,390 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,078 (year 2039),  Features Intersected: JONES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.876,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 40.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $256,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $512,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1558A,  Location: 3.4 E PACIFIC CO (Lat: 46.569472,  Lng: -123.304389),  Route carried "on" structure: State highway 6,  Year Built: 1931,  Status: Open,  Structure Length: 9.88m (32.41ft),  Average Daily Traffic: 1,475 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,899 (year 2039),  Design Load: H 15,  Features Intersected: CHEHALIS R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.046,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 10,  Length of Maximum Span: 56.1m (184.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 21.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.88m (32.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,592,000,  Roadway Improvement Cost: $518,000,  Total Project Cost: $5,184,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18572A,  Location: 1.5 E PACIFIC CO (Lat: 46.552547,  Lng: -123.330556),  Route carried "on" structure: State highway 6,  Year Built: 2015,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 1,371 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,765 (year 2039),  Design Load: HL 93,  Features Intersected: ROCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.988,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.71m (22.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,672,000,  Roadway Improvement Cost: $334,000,  Total Project Cost: $3,344,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18572B,  Location: 1.9 E PACIFIC CO (Lat: 46.552939,  Lng: -123.321028),  Route carried "on" structure: State highway 6,  Year Built: 2015,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 1,371 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,765 (year 2039),  Design Load: HL 93,  Features Intersected: ROCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.744,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.6m (143.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,140,000,  Roadway Improvement Cost: $228,000,  Total Project Cost: $2,280,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19412A,  Location: 6.5 E PACIFIC CO (Lat: 46.609439,  Lng: -123.275056),  Route carried "on" structure: State highway 6,  Year Built: 2019,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,390 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,078 (year 2039),  Design Load: HL 93,  Features Intersected: FRONIA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.986,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 96.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 79.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $187,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $374,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 79648,  Location: 0.18 NE JCT SR 6 (Lat: 46.554083,  Lng: -123.360889),  Route carried "on" structure: County highway 49910,  Year Built: 1981,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 16 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 60 (year 2039),  Design Load: HS 20,  Features Intersected: ROCK CREEK,  Facility Carried by Structure: WALVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $138,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $276,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 79798,  Location: 0.18 W 27092 (Lat: 46.634736,  Lng: -123.283478),  Route carried "on" structure: County highway 27071,  Year Built: 1963,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 415 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 750 (year 2038),  Design Load: HS 15,  Features Intersected: CHEHALIS RIVER,  Facility Carried by Structure: ELK CREEK RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.0m (118.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.71m (22.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,320,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $2,640,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80089,  Location: 10.0 W LEWIS CO (Lat: 46.554083,  Lng: -123.360917),  Route carried "on" structure: County highway 48700,  Year Built: 1992,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 40 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 100 (year 2039),  Design Load: HS 20,  Features Intersected: HALF MOON CREEK,  Facility Carried by Structure: CLARK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $286,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $572,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 80236,  Location: 2.5 SW PE ELL (Lat: 46.549731,  Lng: -123.341703),  Route carried "on" structure: Spur County highway 26200,  Year Built: 1985,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 17 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 31 (year 2037),  Design Load: HS 20,  Features Intersected: ROCK CR.,  Facility Carried by Structure: ROCK CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $274,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $547,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80807,  Location: 0.02 W JCT 26890 (Lat: 46.629789,  Lng: -123.336592),  Route carried "on" structure: County highway 27071,  Year Built: 1952,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 192 (year 2019),  Truck Traffic: 61%,  Average Future Daily Traffic: 347 (year 2039),  Design Load: HS 20,  Features Intersected: ELK CREEK,  Facility Carried by Structure: ELK CREEK RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $259,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $518,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80809,  Location: 3.W OF DOTY (Lat: 46.631542,  Lng: -123.337322),  Route carried "on" structure: County highway 27071,  Year Built: 1983,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 192 (year 2019),  Truck Traffic: 61%,  Average Future Daily Traffic: 347 (year 2039),  Design Load: HS 20,  Features Intersected: EIGHT CR.,  Facility Carried by Structure: ELK CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $136,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $273,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80938,  Location: 0.6 W DOTY (Lat: 46.630075,  Lng: -123.310339),  Route carried "on" structure: County highway 27071,  Year Built: 1952,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 183 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 331 (year 2038),  Design Load: H 15,  Features Intersected: DEER CREEK,  Facility Carried by Structure: ELK CREEK RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $250,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 81091,  Location: 0.85 W 27092 (Lat: 46.634550,  Lng: -123.296789),  Route carried "on" structure: County highway 27071,  Year Built: 1951,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 355 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 642 (year 2038),  Features Intersected: ELK CREEK,  Facility Carried by Structure: ELK CREEK RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.24m (17.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $2,614,000,  Roadway Improvement Cost: $523,000,  Total Project Cost: $5,229,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83466,  Location: 1.0 NE PE ELL (Lat: 46.580822,  Lng: -123.278872),  Route carried "on" structure: County highway 26521,  Year Built: 1953,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 9 (year 2019),  Truck Traffic: 22%,  Average Future Daily Traffic: 17 (year 2039),  Design Load: H 15,  Features Intersected: JONES CREEK,  Facility Carried by Structure: LECH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $132,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $264,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 83471,  Location: 0.41 E JCT SR.6 (Lat: 46.588106,  Lng: -123.275894),  Route carried "on" structure: Spur County highway 26581,  Year Built: 1972,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 21 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 38 (year 2039),  Design Load: H 15,  Features Intersected: JONES CR.,  Facility Carried by Structure: BEAM RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $178,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $356,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85591,  Location: 0.5 BLK E MAIN ST (Lat: 46.568753,  Lng: -123.296778),  Route carried "on" structure: City street 975,  Year Built: 1950,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 355 (year 2015),  Truck Traffic: 9%,  Average Future Daily Traffic: 660 (year 2036),  Design Load: H 15,  Features Intersected: STOWE CREEK,  Facility Carried by Structure: KELSO STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $151,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $302,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 86088,  Location: 2.5 BLKS S SR 6 (Lat: 46.568003,  Lng: -123.300253),  Route carried "on" structure: City street 975,  Year Built: 1994,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 600 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 866 (year 2036),  Design Load: HS 20,  Features Intersected: STOWE CREEK,  Facility Carried by Structure: THIRD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $580,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: IM,  Location: 4.9 E PACIFIC CO (Lat: 46.584575,  Lng: -123.287083),  Route carried "under" structure: State highway 6,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 2,390 (year 2019),  Truck Traffic: 14%,  Features Intersected: STATE ROUTE 6,  Facility Carried by Structure: STATE PARKS TRAIL
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 47.476,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 21.3m (69.9ft)