Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Peabody, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 30Number of bridges
  • 341ft / 104mTotal length
  • $105,808,000Total costs
  • 967,405Total average daily traffic
  • 78,751Total average daily truck traffic
  • 1,589,267Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Peabody
  • No street view available for this location

New bridges in Peabody, MA - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 31940-1949
  • 61950-1959
  • 61970-1979
  • 71980-1989
  • 32000-2009
  • 12010-2019
  • 12020-2022
Reconstructed bridges in Peabody, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
  • 01990-1999
  • 42000-2009
Average Bridge Daily Traffic in Peabody, MA
Average Bridge Truck Traffic in Peabody, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.9%Very good
  • 20.7%Good
  • 48.3%Satisfactory
  • 20.7%Fair
  • 3.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.9%Very good
  • 24.1%Good
  • 37.9%Satisfactory
  • 24.1%Fair
  • 6.9%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.9%Very good
  • 10.3%Good
  • 58.6%Satisfactory
  • 24.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: D030188H7DOTNBI,  Location: 0.4 MI N OF ST-114 (Lat: 42.547147,  Lng: -70.936592),  Route carried "on" structure: State highway 128,  Year Built: 2021,  Status: Open,  Structure Length: 2.20m (7.22ft),  Average Daily Traffic: 80,652 (year 2017),  Truck Traffic: 12%,  Design Load: HL 93,  Features Intersected: WATER WATERS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 64.728,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 29.1m (95.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: P030012TFDOTNBI,  Location: .1 MI N RR TRACKS (Lat: 42.548264,  Lng: -70.983153),  Route carried "on" structure: US 1,  Year Built: 1948,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 2.17m (7.12ft),  Average Daily Traffic: 23,230 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 73,753 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: HWY LOWELL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.495,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.7m (41.7ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $11,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $17,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P030012TGDOTNBI,  Location: .1 MI N OF RR TRACKS (Lat: 42.548378,  Lng: -70.983306),  Route carried "on" structure: US 1,  Year Built: 1948,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 2.17m (7.12ft),  Average Daily Traffic: 19,815 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 73,753 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: HWY LOWELL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.495,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.7m (41.7ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $11,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $17,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: P030062QCDOT634,  Location: NEXT TO WARREN STREET CAF (Lat: 42.530072,  Lng: -70.930333),  Route carried "on" structure: City street ,  Year Built: 1946,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 2,900 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,948 (year 2031),  Design Load: H 20,  Features Intersected: RR MBTA/BMRR,  Facility Carried by Structure: HWY WARREN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $593,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $890,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: P03007AX6DOT634,  Location: .1 MI N PINE STREET (Lat: 42.543778,  Lng: -70.994756),  Route carried "on" structure: State highway ,  Year Built: 2004,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 6,700 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,844 (year 2032),  Design Load: HS 20,  Features Intersected: OTHER PED BIKE PATH,  Facility Carried by Structure: HWY JOHNSON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 0.0m,  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 60.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $433,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $650,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P03008AX5DOT634,  Location: .1 MI S PINE STREET (Lat: 42.542303,  Lng: -70.995111),  Route carried "on" structure: State highway ,  Year Built: 2004,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 300 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 474 (year 2032),  Design Load: HS 20,  Features Intersected: RR MBTA (ABANDONED),  Facility Carried by Structure: HWY JHNSN ST EXT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 3.9m (12.8ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 98.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $989,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $1,484,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P030092QDDOT634,  Location: .1 MI SW OF RTE 114 (Lat: 42.533447,  Lng: -70.930356),  Route carried "on" structure: City street ,  Year Built: 1937,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 9,500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,687 (year 2031),  Features Intersected: RR MBTA/BMRR,  Facility Carried by Structure: HWY ENDICOTT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $480,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $721,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: P03010AF9DOTNBI,  Location: .8K EAST OF ST 128 (Lat: 42.535178,  Lng: -70.930336),  Route carried "on" structure: State highway 114,  Year Built: 2000,  Status: Open,  Structure Length: 1.69m (5.54ft),  Average Daily Traffic: 46,100 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 72,648 (year 2032),  Design Load: HS 20,  Features Intersected: RR MBTA/BMRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.200,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.6m (54.5ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 71.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,395,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $2,093,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P03013B1CMUNNBI,  Location: SW OF HRMONYGROVE CEMETRY (Lat: 42.524508,  Lng: -70.918678),  Route carried "on" structure: Business City street ,  Year Built: 2015,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 5,300 (year 2018),  Truck Traffic: 3%,  Design Load: HL 93,  Features Intersected: WATER NORTH RIVER,  Facility Carried by Structure: HWY HOWLEY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: March 2020,  Underwater Inspection Date: April 2019,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: P030152UEDOTNBI,  Location: .8 MI S ST114 (Lat: 42.533608,  Lng: -70.950714),  Route carried "on" structure: State highway 128,  Year Built: 1937,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 102,600 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 151,455 (year 2032),  Design Load: HS 20,  Features Intersected: HWY LOWELL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.675,  Lanes on structure: 5,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 22.3m (73.2ft),  Out-to-Out Width: 23.9m (78.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,911,000,  Roadway Improvement Cost: $292,000,  Total Project Cost: $4,367,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P030162UMDOTNBI,  Location: .8 MI LOWELL STREET (Lat: 42.539958,  Lng: -70.938097),  Route carried "on" structure: State highway 114,  Year Built: 1938,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 56,508 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 70,911 (year 2031),  Design Load: H 20,  Features Intersected: ST128
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.328,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $2,143,000,  Roadway Improvement Cost: $215,000,  Total Project Cost: $3,215,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: P030212UFDOTNBI,  Location: .3 MI S ST114 (Lat: 42.537322,  Lng: -70.943211),  Route carried "on" structure: State highway 128,  Year Built: 1958,  Status: Open,  Structure Length: 2.12m (6.96ft),  Average Daily Traffic: 18,100 (year 0019),  Truck Traffic: 4%,  Average Future Daily Traffic: 153,982 (year 2032),  Design Load: H 20,  Features Intersected: HWY ACCESS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.1m (85.6ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.7m (31.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 26.1m (85.6ft),  Out-to-Out Width: 29.9m (98.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Inventory Rating: 75.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,584,000,  Roadway Improvement Cost: $259,000,  Total Project Cost: $3,877,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: P030232VNDOTNBI,  Location: .2 MI E US1 (Lat: 42.519553,  Lng: -70.993639),  Route carried "on" structure: Interstate 95,  Year Built: 1959,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 7.41m (24.31ft),  Average Daily Traffic: 55,500 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 93,810 (year 2032),  Design Load: H 20,  Features Intersected: I 95 /ST128,  Facility Carried by Structure: US 1 CONN RPS A&B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 23.5m (77.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.50m (24.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $6,924,000,  Roadway Improvement Cost: $693,000,  Total Project Cost: $10,387,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: P030242VPDOTNBI,  Location: .1 MI E US1 (Lat: 42.520736,  Lng: -70.994806),  Route carried "on" structure: Interstate 95,  Year Built: 1959,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 31,300 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 35,692 (year 2032),  Design Load: H 20,  Features Intersected: I 95 RAMP F
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 101.659,  Lanes on structure: 1,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.1m (26.6ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 67.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $1,501,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P030252VQDOTNBI,  Location: .1 MI E US1 (Lat: 42.521903,  Lng: -70.994339),  Route carried "on" structure: Interstate 95,  Year Built: 1959,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 25,200 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 19,504 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I 95 RAMP C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 101.666,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,171,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,757,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: P030262VRDOTNBI,  Location: 2.1 KM S I95 (Lat: 42.523719,  Lng: -70.996267),  Route carried "on" structure: Interstate 95,  Year Built: 1959,  Status: Open,  Structure Length: 7.99m (26.21ft),  Average Daily Traffic: 36,300 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 55,276 (year 2032),  Design Load: HS 20,  Features Intersected: US 1 NEWBURY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.5m (57.4ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.1m (95.5ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 17.5m (57.4ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 47.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $6,757,000,  Roadway Improvement Cost: $676,000,  Total Project Cost: $10,136,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: P030272TEDOTNBI,  Location: 0.16 KM EAST US 1 (Lat: 42.526631,  Lng: -70.992864),  Route carried "on" structure: State highway ,  Year Built: 1959,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 6,600 (year 2019),  Truck Traffic: 24%,  Average Future Daily Traffic: 6,159 (year 2032),  Design Load: H 20,  Features Intersected: HWY US 1 N RAMP C,  Facility Carried by Structure: HWY DEARBON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.3m (27.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.3m (53.5ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $934,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,402,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: P030362VWDOTNBI,  Location: .1 MI N LOWELL STREET (Lat: 42.548133,  Lng: -70.981111),  Route carried "on" structure: Interstate 95,  Year Built: 1974,  Year Reconstructed: 1984,  Status: Temporarily open,  Structure Length: 0.93m (3.05ft),  Average Daily Traffic: 39,500 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 56,381 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OTHER MBTA - BIKE TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 105.163,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.7m (28.5ft),  Curb-To-Curb Width: 81.5m (267.4ft),  Out-to-Out Width: 82.8m (271.7ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $3,253,000,  Roadway Improvement Cost: $326,000,  Total Project Cost: $4,880,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: P030362VXDOTNBI,  Location: .1 MI N LOWELL STREET (Lat: 42.547672,  Lng: -70.981661),  Route carried "on" structure: Interstate 95,  Year Built: 1974,  Status: Temporarily open,  Structure Length: 0.93m (3.05ft),  Average Daily Traffic: 44,800 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 85,756 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OTHER MBTA - BIKE TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 105.163,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.7m (28.5ft),  Curb-To-Curb Width: 81.5m (267.4ft),  Out-to-Out Width: 82.8m (271.7ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 55.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $3,253,000,  Roadway Improvement Cost: $326,000,  Total Project Cost: $4,880,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: P0303731TDOTNBI,  Location: AT FOREST STREET (Lat: 42.532625,  Lng: -70.981806),  Route carried "on" structure: State highway ,  Year Built: 1974,  Status: Open,  Structure Length: 8.90m (29.20ft),  Average Daily Traffic: 2,500 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,358 (year 2032),  Design Load: HS 20,  Features Intersected: I 95,  Facility Carried by Structure: HWY FOREST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.4m (139.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.00m (29.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,019,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,529,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: P030402VUDOTNBI,  Location: .2 MI E US1 (Lat: 42.546611,  Lng: -70.981944),  Route carried "on" structure: Interstate 95,  Year Built: 1974,  Status: Open,  Structure Length: 3.34m (10.96ft),  Average Daily Traffic: 49,900 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 57,644 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY LOWELL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 103.945,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.7m (74.5ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.5m (106.6ft),  Curb-To-Curb Width: 22.7m (74.5ft),  Out-to-Out Width: 24.3m (79.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 87.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $650,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $976,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: P030402VVDOTNBI,  Location: .2 MI E US1 (Lat: 42.546875,  Lng: -70.982097),  Route carried "on" structure: Interstate 95,  Year Built: 1974,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 60,000 (year 2017),  Truck Traffic: 13%,  Average Future Daily Traffic: 86,862 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY LOWELL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 103.945,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 19.7m (64.6ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 85.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $544,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $817,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: P030442VTDOTNBI,  Location: .1 MI E US1 (Lat: 42.543044,  Lng: -70.985211),  Route carried "on" structure: Interstate 95,  Year Built: 1975,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 23,500 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 36,324 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: US 1 NB/NEWBURY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,788,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $2,683,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: P0304531UDOTNBI,  Location: 1.5MI S LOWELL STREET (Lat: 42.526978,  Lng: -70.956719),  Route carried "on" structure: State highway ,  Year Built: 1988,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 16,900 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 23,690 (year 2031),  Design Load: HS 20,  Features Intersected: ST128,  Facility Carried by Structure: HWY FOREST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.977,  Lanes on structure: 6,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 25.1m (82.3ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 7.00m (22.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $7,617,000,  Roadway Improvement Cost: $762,000,  Total Project Cost: $11,426,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P030462VYDOTNBI,  Location: .1 MI E US1 (Lat: 42.542169,  Lng: -70.984006),  Route carried "on" structure: Interstate 95,  Year Built: 1986,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 76,700 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 125,870 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: I 95 RAMP FROM US 1 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 40.2m (131.9ft),  Skew: 35 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 63.7m (209.0ft),  Curb-To-Curb Width: 40.2m (131.9ft),  Out-to-Out Width: 41.1m (134.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 85.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 6.70m (21.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $10,817,000,  Roadway Improvement Cost: $1,082,000,  Total Project Cost: $16,226,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P030472W0DOTNBI,  Location: .6 MI S FOREST STREET (Lat: 42.525850,  Lng: -70.978406),  Route carried "on" structure: Interstate 95,  Year Built: 1988,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 4,200 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 61,277 (year 2031),  Design Load: HS 20,  Features Intersected: I 95 RAMP E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,802,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $2,704,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P030482W1DOTNBI,  Location: .7 MI S FOREST STREET (Lat: 42.524764,  Lng: -70.976947),  Route carried "on" structure: Interstate 95,  Year Built: 1988,  Status: Open,  Structure Length: 8.35m (27.40ft),  Average Daily Traffic: 7,500 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 25,743 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: ST128
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.1m (138.1ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $4,356,000,  Roadway Improvement Cost: $436,000,  Total Project Cost: $6,535,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P030492W2DOTNBI,  Location: .7 MI S FOREST STREET (Lat: 42.524006,  Lng: -70.973278),  Route carried "on" structure: Interstate 95,  Year Built: 1988,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 4,200 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 61,277 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I 95 RAMP J
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 51.8m (169.9ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,949,000,  Roadway Improvement Cost: $295,000,  Total Project Cost: $4,424,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P030502UGDOTNBI,  Location: 1.7 MI S LOWELL STREET (Lat: 42.525769,  Lng: -70.972150),  Route carried "on" structure: State highway 128,  Year Built: 1988,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 106,900 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 129,661 (year 2031),  Design Load: HS 20,  Features Intersected: I 95 RAMP J
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 49.1m (161.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 49.0m (160.8ft),  Out-to-Out Width: 49.9m (163.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 68.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,255,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $1,883,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P030512LJDOTNBI,  Location: 1 MILE N OF US ONE (Lat: 42.523347,  Lng: -70.981689),  Route carried "on" structure: State highway ,  Year Built: 1988,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 4,200 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,528 (year 2033),  Design Load: HS 20,  Features Intersected: I 95 /ST128,  Facility Carried by Structure: HWY FARM AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.603,  Lanes on structure: 2,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.1m (148.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 72.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 8.80m (28.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,887,000,  Roadway Improvement Cost: $289,000,  Total Project Cost: $4,331,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Discuss Peabody, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.