Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Peck, Idaho (ID)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 164ft / 50.4mTotal length
  • $11,720,000Total costs
  • 88,670Total average daily traffic
  • 17,866Total average daily truck traffic
  • 133,005Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Peck
  • No street view available for this location

New bridges in Peck, ID - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 11940-1949
  • 61960-1969
  • 41970-1979
  • 21980-1989
  • 12010-2019
Reconstructed bridges in Peck, ID - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 21980-1989
Average Bridge Daily Traffic in Peck, ID
Average Bridge Truck Traffic in Peck, ID
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 31.3%Good
  • 37.5%Satisfactory
  • 12.5%Fair
  • 6.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.3%Very good
  • 18.8%Good
  • 37.5%Satisfactory
  • 31.3%Fair
  • 6.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.8%Good
  • 68.8%Satisfactory
  • 12.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Very good
  • 55.6%Good
  • 11.1%Poor
Find on map >>   Show street view

Structure Number: 10405,  Location: 5.9 W. OROFINO (Lat: 46.496417,  Lng: -116.434472),  Route carried "on" structure: US 12,  Year Built: 1984,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 4,200 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 6,300 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: BIG CANYON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.177,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: US0,  Subroute: 5),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.8m (117.5ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1075,  Location: 4.6 W. AMERICAN FALLS (Lat: 42.725306,  Lng: -112.906611),  Route carried "on" structure: Interstate 86,  Year Built: 1980,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 3,850 (year 2019),  Truck Traffic: 31%,  Average Future Daily Traffic: 5,775 (year 2039),  Design Load: HS 20,  Features Intersected: ISAAK LOOP GS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.698,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1081,  Location: 5.7 E. AMERICAN FALLS (Lat: 42.834483,  Lng: -112.770128),  Route carried "on" structure: Interstate 86,  Year Built: 1963,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 6,000 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 9,000 (year 2039),  Design Load: HS 20,  Features Intersected: RAMSEY RD;SEAGULL BAY IC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.320,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1085,  Location: 6.1 W. CHUBBUCK (Lat: 42.899528,  Lng: -112.584139),  Route carried "on" structure: Interstate 86,  Year Built: 1968,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 6,500 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 9,750 (year 2039),  Design Load: HS 20,  Features Intersected: UPRR;POCATELLO AIRPORT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.718,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1105,  Location: 13.8 N. MALAD (Lat: 42.374861,  Lng: -112.209833),  Route carried "on" structure: Interstate 15,  Year Built: 1971,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 5,500 (year 2019),  Truck Traffic: 24%,  Average Future Daily Traffic: 8,250 (year 2039),  Design Load: HS 20,  Features Intersected: MARSH VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.322,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,053,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,580,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1106,  Location: 11.8 S. ARIMO (Lat: 42.410861,  Lng: -112.191972),  Route carried "on" structure: Interstate 15,  Year Built: 1971,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 5,500 (year 2019),  Truck Traffic: 24%,  Average Future Daily Traffic: 8,250 (year 2039),  Design Load: HS 20,  Features Intersected: WOODLAND RD.GS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.521,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.09m (16.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,157,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,736,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1107,  Location: 11.1 S. ARIMO (Lat: 42.421083,  Lng: -112.186917),  Route carried "on" structure: Interstate 15,  Year Built: 1971,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 11,000 (year 2019),  Truck Traffic: 24%,  Average Future Daily Traffic: 16,500 (year 2039),  Design Load: HS 20,  Features Intersected: MARSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.707,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 33.7m (110.6ft),  Out-to-Out Width: 34.7m (113.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,268,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $1,902,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 111,  Location: 8.2 S. MCCAMMON (Lat: 42.566833,  Lng: -112.179083),  Route carried "on" structure: Interstate 15,  Year Built: 1964,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 6,250 (year 2019),  Truck Traffic: 22%,  Average Future Daily Traffic: 9,375 (year 2039),  Design Load: HS 20,  Features Intersected: STC 1755;ARIMO RD.IC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 65.058,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.51m (14.80ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,050,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,538,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1134,  Location: 9.8 N. POCATELLO (Lat: 43.012361,  Lng: -112.408333),  Route carried "on" structure: Interstate 15,  Year Built: 1960,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 13,000 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 19,500 (year 2039),  Design Load: HS 20,  Features Intersected: FORT HALL MAIN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 127.505,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1171,  Location: 2.0 S. IDAHO FALLS (Lat: 43.474597,  Lng: -112.077750),  Route carried "on" structure: Interstate 15,  Year Built: 1962,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 11,500 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 17,250 (year 2039),  Design Load: HS 20,  Features Intersected: PORTER CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 187.490,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1172,  Location: IN IDAHO FALLS;BROADWAY (Lat: 43.496361,  Lng: -112.053722),  Route carried "on" structure: Interstate 15,  Year Built: 1962,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 11,500 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 17,250 (year 2039),  Design Load: HS 20,  Features Intersected: I 15B;BROADWAY ST.IC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 190.758,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.9m (52.2ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,455,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $2,183,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2023,  Location: 0.3 S. PECK (Lat: 46.467806,  Lng: -116.418222),  Route carried "on" structure: County highway 4747,  Year Built: 1948,  Status: Posted for load,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 30 (year 2019),  Truck Traffic: 33%,  Average Future Daily Traffic: 45 (year 2039),  Design Load: H 15,  Features Intersected: BIG CANYON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.375,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $431,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $646,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20236,  Location: AT PECK NCL (Lat: 46.478472,  Lng: -116.425194),  Route carried "on" structure: County highway 4747,  Year Built: 2019,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 1,600 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,400 (year 2039),  Design Load: HL 93,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.684,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2631,  Location: JOHNS LANDING W/COLLISTER (Lat: 43.659333,  Lng: -116.249833),  Route carried "on" structure: City street 9443,  Year Built: 1977,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,000 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,000 (year 2039),  Design Load: HS 20,  Features Intersected: FARMERS UNION CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.327,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 29825,  Location: 0.4 S. 0.3 E. PECK (Lat: 46.470889,  Lng: -116.420333),  Route carried "on" structure: County highway ,  Year Built: 1930,  Year Reconstructed: 1960,  Status: Posted for load,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 190 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 285 (year 2039),  Design Load: H 10,  Features Intersected: BIG CANYON CREEK,  Facility Carried by Structure: LITTLE CANYON ROAD
Minimum Vertical Clearance: 3.51m (11.52ft),  Kilometerpoint: 160.957,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 14.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.05m (13.29ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $614,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $922,000 ( Estimate for 2019),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2997,  Location: IN PECK;NE SECTION (Lat: 46.475944,  Lng: -116.422833),  Route carried "on" structure: City street ,  Year Built: 1920,  Status: Posted for load,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 75 (year 2039),  Design Load: H 10,  Features Intersected: BIG CANYON CREEK,  Facility Carried by Structure: LULU STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 160.958,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 7.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 4.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.27m (14.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $809,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,213,000 ( Estimate for 2019),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Discuss Peck, Idaho (ID) on our hugely popular Idaho forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.