Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Pevely, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 29Number of bridges
  • 341ft / 104mTotal length
  • $2,552,000Total costs
  • 523,495Total average daily traffic
  • 74,689Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pevely
  • No street view available for this location

New bridges in Pevely, MO - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 11950-1959
  • 231960-1969
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Pevely, MO - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 21990-1999
Average Bridge Daily Traffic in Pevely, MO
Average Bridge Truck Traffic in Pevely, MO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 23.5%Good
  • 41.2%Satisfactory
  • 29.4%Fair
  • 5.9%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 47.1%Good
  • 41.2%Satisfactory
  • 11.8%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 41.2%Good
  • 58.8%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 75.0%Satisfactory
  • 12.5%Fair
  • 12.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Good
  • 50.0%Fair
  • 25.0%Poor
Find on map >>   Show street view

Structure Number: 23629,  Location: S 924 T 41 N R 6 E (Lat: 38.270261,  Lng: -90.405381),  Route carried "on" structure: County highway 206,  Year Built: 1930,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 400 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 680 (year 2041),  Design Load: H 15,  Features Intersected: SANDY CR,  Facility Carried by Structure: HERKY-HORINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.092,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 27.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 29036,  Location: S 226 T 41 N R 6 E (Lat: 38.284964,  Lng: -90.390856),  Route carried "on" structure: US 61,  Year Built: 2002,  Status: Open,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 8,937 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,193 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: UP RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 312.059,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3223,  Location: S 5 T 41 N R 6 E (Lat: 38.313169,  Lng: -90.382911),  Route carried "on" structure: City street 194,  Year Built: 2007,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 39 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 66 (year 2041),  Design Load: HS 20,  Features Intersected: TRIB OF MISSISSIPP,  Facility Carried by Structure: BUSHBERG RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 84.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 33836,  Location: S 6 T 41 N R 6 E (Lat: 38.316850,  Lng: -90.397669),  Route carried "on" structure: US 61,  Year Built: 2011,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 5,978 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,163 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: KOCHS CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 326.010,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 54.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4702,  Location: S 7 T 41 N R 6 E (Lat: 38.307706,  Lng: -90.399603),  Route carried "on" structure: US 61,  Year Built: 1935,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 5,978 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,163 (year 2041),  Features Intersected: GIBSON CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 309.202,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 87.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.15m (0.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $375,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 698,  Location: S 19 T 41 N R 6 E (Lat: 38.269922,  Lng: -90.403631),  Route carried "on" structure: Interstate 55,  Year Built: 1965,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 31,036 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 57,417 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: CST HERKY-HORINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.372,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 699,  Location: S 19 T 41 N R 6 E (Lat: 38.269953,  Lng: -90.403333),  Route carried "on" structure: Interstate 55,  Year Built: 1965,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 31,495 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 58,266 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: CST HERKY-HORINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 289.287,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 7,  Location: S 11 T 48 N R 16 W (Lat: 38.938978,  Lng: -92.628858),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 132 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 178 (year 2041),  Design Load: H 15,  Features Intersected: IS 70,  Facility Carried by Structure: WOODLAND SCHOOL DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.479,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Serious,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.71m (2.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $380,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $570,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7,  Location: S 30 T 41 N R 5 E (Lat: 38.255069,  Lng: -90.402686),  Route carried "on" structure: Interstate 55,  Year Built: 1965,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 31,036 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 57,417 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: CST MCNUTT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.030,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 701,  Location: S 30 T 41 N R 5 E (Lat: 38.255056,  Lng: -90.402394),  Route carried "on" structure: Interstate 55,  Year Built: 1965,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 28,722 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 53,136 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: CST MCNUTT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 287.629,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 704,  Location: S 420 T 41 N R 6 E (Lat: 38.283906,  Lng: -90.403314),  Route carried "on" structure: Interstate 55,  Year Built: 1964,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 62,531 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 115,682 (year 2041),  Design Load: HS 20,  Features Intersected: BR SANDY CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.840,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.0m (128.0ft),  Skew: 21 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 705,  Location: S 420 T 41 N R 6 E (Lat: 38.283436,  Lng: -90.403528),  Route carried "on" structure: Interstate 55,  Year Built: 1965,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 31,036 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 57,417 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: UP RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.872,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 69.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 706,  Location: S 420 T 41 N R 6 E (Lat: 38.283475,  Lng: -90.403192),  Route carried "on" structure: Interstate 55,  Year Built: 1965,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 31,495 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 58,266 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: UP RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 290.786,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 69.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.58m (1.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $612,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $918,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 707,  Location: S 420 T 41 N R 6 E (Lat: 38.283794,  Lng: -90.404158),  Route carried "on" structure: ServiceState highway 55,  Year Built: 1964,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,557 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,603 (year 2041),  Design Load: H 15,  Features Intersected: BR SANDY CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.343,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 708,  Location: S 420 T 41 N R 6 E (Lat: 38.283269,  Lng: -90.404231),  Route carried "on" structure: ServiceState highway 55,  Year Built: 1964,  Status: Posted for load,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 2,557 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,603 (year 2041),  Design Load: H 15,  Features Intersected: UP RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.388,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.59m (1.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $459,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $689,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 801,  Location: S 19 T 41 N R 6 E (Lat: 38.265994,  Lng: -90.403000),  Route carried "on" structure: Interstate 55,  Year Built: 1965,  Status: Open,  Structure Length: 12.34m (40.49ft),  Average Daily Traffic: 31,036 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 57,417 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: JOACHIM CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.778,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 802,  Location: S 19 T 41 N R 6 E (Lat: 38.266175,  Lng: -90.402697),  Route carried "on" structure: Interstate 55,  Year Built: 1965,  Status: Open,  Structure Length: 12.34m (40.49ft),  Average Daily Traffic: 31,495 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 58,266 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: JOACHIM CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 288.821,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 803,  Location: S 420 T 41 N R 6 E (Lat: 38.287092,  Lng: -90.403144),  Route carried "on" structure: Interstate 55,  Year Built: 1965,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 33,476 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 61,931 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: RT Z
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.460,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 804,  Location: S 420 T 41 N R 6 E (Lat: 38.287133,  Lng: -90.402825),  Route carried "on" structure: Interstate 55,  Year Built: 1965,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 31,495 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 58,266 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: RT Z
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 291.192,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 833,  Location: S 420 T 41 N R 6 E (Lat: 38.291642,  Lng: -90.404353),  Route carried "on" structure: Interstate 55,  Year Built: 1965,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 33,476 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 61,931 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: BNSF RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.929,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 834,  Location: S 420 T 41 N R 6 E (Lat: 38.292136,  Lng: -90.404244),  Route carried "on" structure: Interstate 55,  Year Built: 1965,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 34,101 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 63,087 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: BNSF RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 291.718,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 698,  Location: S 19 T 41 N R 6 E (Lat: 38.269922,  Lng: -90.403631),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 856 (year 2021),  Truck Traffic: 13%,  Features Intersected: CST HERKY-HORINE RD,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.359,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 699,  Location: S 19 T 41 N R 6 E (Lat: 38.269953,  Lng: -90.403333),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 856 (year 2021),  Truck Traffic: 13%,  Features Intersected: CST HERKY-HORINE RD,  Facility Carried by Structure: IS 55 N
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 7,  Location: S 30 T 41 N R 5 E (Lat: 38.255069,  Lng: -90.402686),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,554 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST MCNUTT ST,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 1.427,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 7,  Location: S 30 T 41 N R 5 E (Lat: 38.255069,  Lng: -90.402686),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,977 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST MCNUTT ST,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 701,  Location: S 30 T 41 N R 5 E (Lat: 38.255056,  Lng: -90.402394),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,554 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST MCNUTT ST,  Facility Carried by Structure: IS 55 N
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 1.455,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 701,  Location: S 30 T 41 N R 5 E (Lat: 38.255056,  Lng: -90.402394),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,977 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST MCNUTT ST,  Facility Carried by Structure: IS 55 N
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.810,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 803,  Location: S 420 T 41 N R 6 E (Lat: 38.287092,  Lng: -90.403144),  Route carried "under" structure: State highway Z,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,588 (year 2021),  Truck Traffic: 7%,  Features Intersected: RT Z,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 8.979,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 804,  Location: S 420 T 41 N R 6 E (Lat: 38.287133,  Lng: -90.402825),  Route carried "under" structure: State highway Z,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 9,125 (year 2021),  Truck Traffic: 9%,  Features Intersected: RT Z,  Facility Carried by Structure: IS 55 N
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 9.006,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.1m (56.1ft)

Discuss Pevely, Missouri (MO) on our hugely popular Missouri forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.