Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Picnic Point-North Lynnwood, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 469ft / 143mTotal length
  • $99,138,000Total costs
  • 877,129Total average daily traffic
  • 53,051Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Picnic Point-North Lynnwood
  • No street view available for this location

New bridges in Picnic Point-North Lynnwood, WA - historical statistics
  • New bridges - historical statistics
  • 41960-1969
  • 121980-1989
  • 22000-2009
Reconstructed bridges in Picnic Point-North Lynnwood, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 31990-1999
Average Bridge Daily Traffic in Picnic Point-North Lynnwood, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 50.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 80.0%Good
  • 20.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 80.0%Good
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 11561A,  Location: 1.3 N JCT I-405 (Lat: 47.849833,  Lng: -122.258139),  Route carried "on" structure: County highway ,  Year Built: 1963,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 9.85m (32.32ft),  Average Daily Traffic: 44,483 (year 2010),  Truck Traffic: 5%,  Average Future Daily Traffic: 75,710 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: I-5,  Facility Carried by Structure: 164TH ST SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 6,  Lanes under structure: 14,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.7m (81.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 24.6m (80.7ft),  Out-to-Out Width: 29.2m (95.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.85m (32.32ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $5,362,000,  Roadway Improvement Cost: $1,072,000,  Total Project Cost: $10,724,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 11598C,  Location: 1.1 N JCT SR 524 (Lat: 47.832028,  Lng: -122.262778),  Route carried "on" structure: Interstate 5,  Year Built: 1980,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 8.38m (27.49ft),  Average Daily Traffic: 71,003 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 102,812 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: S 405 & N 525 RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 293.898,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.38m (27.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $4,345,000,  Roadway Improvement Cost: $869,000,  Total Project Cost: $8,690,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11598D,  Location: 0.3 N JCT I-405 (Lat: 47.834639,  Lng: -122.262306),  Route carried "on" structure: City street ,  Year Built: 1962,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 14.57m (47.80ft),  Average Daily Traffic: 8,340 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 15,145 (year 2036),  Design Load: HS 20,  Features Intersected: I-5,  Facility Carried by Structure: MAPLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Lanes under structure: 11,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.57m (47.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,155,000,  Roadway Improvement Cost: $631,000,  Total Project Cost: $6,310,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 11627A,  Location: 1.4 N JCT I-5 (Lat: 47.850000,  Lng: -122.274806),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 30,703 (year 2012),  Truck Traffic: 15%,  Average Future Daily Traffic: 38,212 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: SR 525,  Facility Carried by Structure: 164TH ST SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 34.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.43m (21.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,448,000,  Roadway Improvement Cost: $490,000,  Total Project Cost: $4,895,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 11627B,  Location: 2.4 N JCT I-5 (Lat: 47.864194,  Lng: -122.275250),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 8,494 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 13,649 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SR 525,  Facility Carried by Structure: 148TH ST SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.076,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.71m (22.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,848,000,  Roadway Improvement Cost: $370,000,  Total Project Cost: $3,696,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 11855B,  Location: JCT I-5 (Lat: 47.833722,  Lng: -122.264639),  Route carried "on" structure: Ramp Interstate 405,  Year Built: 1981,  Status: Open,  Structure Length: 38.71m (127.00ft),  Average Daily Traffic: 14,295 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 20,699 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: RAMPS AND SWAMP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 38.71m (127.00ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $8,636,000,  Roadway Improvement Cost: $1,727,000,  Total Project Cost: $17,272,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11980A,  Location: 0.4 N JCT I-5 (Lat: 47.836111,  Lng: -122.269111),  Route carried "on" structure: State highway 525,  Year Built: 1983,  Status: Open,  Structure Length: 25.30m (83.01ft),  Average Daily Traffic: 33,748 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 48,867 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: MAPLE RD & ASH WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.612,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 42.4m (139.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.30m (83.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $9,628,000,  Roadway Improvement Cost: $1,926,000,  Total Project Cost: $19,256,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11980B,  Location: 0.4 N JCT I-5 (Lat: 47.836028,  Lng: -122.269306),  Route carried "on" structure: State highway 525,  Year Built: 1983,  Status: Open,  Structure Length: 23.07m (75.69ft),  Average Daily Traffic: 33,748 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 48,867 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: MAPLE RD & ASH WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.612,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 42.4m (139.1ft),  Curb-To-Curb Width: 17.5m (57.4ft),  Out-to-Out Width: 20.9m (68.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.07m (75.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $9,084,000,  Roadway Improvement Cost: $1,817,000,  Total Project Cost: $18,168,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12036A,  Location: 0.6 N JCT I-5 (Lat: 47.839028,  Lng: -122.272083),  Route carried "on" structure: State highway 525,  Year Built: 1983,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 67,495 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 97,732 (year 2039),  Design Load: HS 20,  Features Intersected: ALDERWOOD MALL PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.998,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.0m (95.1ft),  Skew: 33 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 29.1m (95.5ft),  Out-to-Out Width: 30.6m (100.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $4,113,000,  Roadway Improvement Cost: $823,000,  Total Project Cost: $8,226,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16859A,  Location: 1.5 N JCT I-405 (Lat: 47.853278,  Lng: -122.256278),  Route carried "on" structure: Ramp City street 5,  Year Built: 2005,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 533 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 771 (year 2039),  Design Load: HL 93,  Features Intersected: I-5 SB,  Facility Carried by Structure: ASH WAY ACCESS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018,  Bridge Improvement Cost: $950,000,  Roadway Improvement Cost: $190,000,  Total Project Cost: $1,901,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11561A,  Location: 1.3 N JCT I-405 (Lat: 47.849833,  Lng: -122.258139),  Route carried "under" structure: Interstate 5,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 163,030 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-5,  Facility Carried by Structure: 164TH ST SW
Minimum Vertical Clearance: 6.48m (21.26ft),  Kilometerpoint: 295.958,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 11598C,  Location: 1.0 N JCT SR 524 (Lat: 47.832028,  Lng: -122.262778),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 16,421 (year 2019),  Truck Traffic: 15%,  Features Intersected: S 405 & N 525 RAMPS
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 0.531,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 11598C,  Location: 1.4 N JCT SR 524 (Lat: 47.832028,  Lng: -122.262778),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 26,953 (year 2019),  Truck Traffic: 15%,  Features Intersected: S 405 & N 525 RAMPS
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.821,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 11598D,  Location: 0.3 N JCT I-405 (Lat: 47.834639,  Lng: -122.262306),  Route carried "under" structure: Interstate 5,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 142,005 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-5,  Facility Carried by Structure: MAPLE ROAD
Minimum Vertical Clearance: 6.30m (20.67ft),  Kilometerpoint: 294.285,  Lanes on structure: 2,  Lanes under structure: 11,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 11627A,  Location: 1.4 N JCT I-5 (Lat: 47.850000,  Lng: -122.274806),  Route carried "under" structure: State highway 525,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 58,971 (year 2019),  Truck Traffic: 4%,  Features Intersected: SR 525,  Facility Carried by Structure: 164TH ST SW
Minimum Vertical Clearance: 5.99m (19.65ft),  Kilometerpoint: 2.253,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 11627B,  Location: 2.4 N JCT I-5 (Lat: 47.864194,  Lng: -122.275250),  Route carried "under" structure: State highway 525,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 58,971 (year 2019),  Truck Traffic: 4%,  Features Intersected: SR 525,  Facility Carried by Structure: 148TH ST SW
Minimum Vertical Clearance: 6.15m (20.18ft),  Kilometerpoint: 3.830,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 11855B,  Location: 1.4 N JCT SR 524 (Lat: 47.833722,  Lng: -122.264639),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 16,421 (year 2019),  Truck Traffic: 5%,  Features Intersected: RAMPS AND SWAMP CREEK
Minimum Vertical Clearance: 6.05m (19.85ft),  Kilometerpoint: 0.563,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 16859A,  Location: 1.5 N JCT I-405 (Lat: 47.853278,  Lng: -122.256278),  Route carried "under" structure: Interstate 5,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 81,515 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-5 SB,  Facility Carried by Structure: ASH WAY ACCESS
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 296.361,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.0m (105.0ft)

Discuss Picnic Point-North Lynnwood, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.