Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Pierce, Idaho (ID)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 49ft / 14.7mTotal length
  • $1,373,000Total costs
  • 2,660Total average daily traffic
  • 673Total average daily truck traffic
  • 3,990Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pierce
  • No street view available for this location

New bridges in Pierce, ID - historical statistics
  • New bridges - historical statistics
  • 31950-1959
  • 11960-1969
  • 61970-1979
  • 22000-2009
Average Bridge Truck Traffic in Pierce, ID
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 41.7%Good
  • 41.7%Satisfactory
  • 8.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 33.3%Satisfactory
  • 8.3%Fair
  • 8.3%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 41.7%Good
  • 8.3%Satisfactory
Find on map >>   Show street view

Structure Number: 10315,  Location: 0.4 S. PIERCE (Lat: 46.478389,  Lng: -115.798861),  Route carried "on" structure: State highway 11,  Year Built: 1971,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 650 (year 2019),  Truck Traffic: 31%,  Average Future Daily Traffic: 975 (year 2039),  Design Load: HS 20,  Features Intersected: OROFINO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.138,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1032,  Location: AT PIERCE NCL (Lat: 46.492389,  Lng: -115.800056),  Route carried "on" structure: State highway 11,  Year Built: 1975,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 40%,  Average Future Daily Traffic: 300 (year 2039),  Design Load: HS 20,  Features Intersected: CANAL CREEK;PIERCE BR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.730,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10325,  Location: 0.7 N. PIERCE (Lat: 46.499556,  Lng: -115.812667),  Route carried "on" structure: State highway 11,  Year Built: 1958,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 40%,  Average Future Daily Traffic: 300 (year 2039),  Design Load: HS 20,  Features Intersected: QUARTZ CREEK;N.PIERCE BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.407,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10335,  Location: 1.8 N. PIERCE (Lat: 46.512800,  Lng: -115.815800),  Route carried "on" structure: State highway 11,  Year Built: 1972,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 40%,  Average Future Daily Traffic: 300 (year 2039),  Design Load: HS 20,  Features Intersected: QUARTZ CREEK;THREE MILE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.026,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 10345,  Location: 2.6 N. PIERCE (Lat: 46.519400,  Lng: -115.828300),  Route carried "on" structure: State highway 11,  Year Built: 1958,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 40%,  Average Future Daily Traffic: 300 (year 2039),  Design Load: HS 20,  Features Intersected: QUARTZ CREEK(JAYPE BR)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 52.513,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1035,  Location: 5.4 N. PIERCE (Lat: 46.556400,  Lng: -115.835800),  Route carried "on" structure: State highway 11,  Year Built: 1975,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 40%,  Average Future Daily Traffic: 300 (year 2039),  Design Load: HS 20,  Features Intersected: QUARTZ CREEK;HOLLYWOOD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.906,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29055,  Location: 1.2 S. 0.1 E. PIERCE (Lat: 46.473342,  Lng: -115.796628),  Route carried "on" structure: County highway 4784,  Year Built: 1960,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 110 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 165 (year 2039),  Design Load: H 20,  Features Intersected: OROFINO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.605,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 29061,  Location: IN PEIRCE (Lat: 46.488300,  Lng: -115.800561),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Posted for load,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 190 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 285 (year 2039),  Design Load: H 20,  Features Intersected: OROFINO CREEK,  Facility Carried by Structure: FROMELT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.775,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 16.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $342,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $513,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 29065,  Location: IN PIERCE (Lat: 46.488019,  Lng: -115.800814),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 190 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 285 (year 2039),  Design Load: H 15,  Features Intersected: OROFINO CREEK,  Facility Carried by Structure: MOSCRIP ROAD
Minimum Vertical Clearance: 10.67m (35.01ft),  Kilometerpoint: 161.061,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2907,  Location: IN PIERCE; CARLE ST (Lat: 46.490800,  Lng: -115.800861),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 190 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 285 (year 2039),  Design Load: H 15,  Features Intersected: OROFINO CREEK,  Facility Carried by Structure: CARLE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.043,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 14.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 8.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $231,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $347,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 29076,  Location: IN PEIRCE (Lat: 46.492417,  Lng: -115.800861),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Posted for load,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 190 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 285 (year 2039),  Design Load: H 20,  Features Intersected: OROFINO CREEK,  Facility Carried by Structure: FORMELT ROAD
Minimum Vertical Clearance: 9.14m (29.99ft),  Kilometerpoint: 163.223,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $342,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $513,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10501000000114,  Location: MILL POND (Lat: 46.471136,  Lng: -115.796364),  Route carried "on" structure: Federal lands road 250,  Year Built: 1958,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 140 (year 1981),  Truck Traffic: 5%,  Average Future Daily Traffic: 210 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: OROFINO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.800,  Lanes on structure: 2,  Owner: U.S. Forest Service,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 24.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Pierce, Idaho (ID) on our hugely popular Idaho forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.