Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Pinehurst, Idaho (ID)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 36Number of bridges
  • 456ft / 139mTotal length
  • $29,128,000Total costs
  • 102,485Total average daily traffic
  • 18,056Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pinehurst
  • No street view available for this location

New bridges in Pinehurst, ID - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 21950-1959
  • 111960-1969
  • 51970-1979
  • 31980-1989
  • 21990-1999
  • 92010-2019
  • 12020-2022
Average Bridge Daily Traffic in Pinehurst, ID
Average Bridge Truck Traffic in Pinehurst, ID
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.7%Excellent
  • 14.8%Very good
  • 25.9%Good
  • 40.7%Satisfactory
  • 14.8%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.7%Excellent
  • 25.9%Very good
  • 29.6%Good
  • 33.3%Satisfactory
  • 7.4%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.7%Excellent
  • 29.6%Very good
  • 3.7%Good
  • 37.0%Satisfactory
  • 22.2%Fair
  • 3.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.3%Excellent
  • 26.1%Very good
  • 4.3%Good
  • 47.8%Satisfactory
  • 8.7%Fair
  • 8.7%Poor
Find on map >>   Show street view

Structure Number: 1707,  Location: 5.0 W. KELLOGG (Lat: 47.546222,  Lng: -116.227111),  Route carried "on" structure: Interstate 90,  Year Built: 1965,  Status: Open,  Structure Length: 12.07m (39.60ft),  Average Daily Traffic: 7,250 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 10,875 (year 2039),  Design Load: HS 20,  Features Intersected: S 5750;PINE CR;PINEHURST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 72.781,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: I,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.29m (43.60ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $2,734,000,  Roadway Improvement Cost: $270,000,  Total Project Cost: $4,101,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 17075,  Location: 5.0 W. KELLOGG (Lat: 47.547064,  Lng: -116.225744),  Route carried "on" structure: Interstate 90,  Year Built: 1965,  Status: Open,  Structure Length: 12.37m (40.58ft),  Average Daily Traffic: 7,250 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 10,875 (year 2039),  Design Load: HS 20,  Features Intersected: S 5750;PINE CR;PINEHURST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 72.782,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: I,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.62m (44.69ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $2,803,000,  Roadway Improvement Cost: $280,000,  Total Project Cost: $4,204,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 17081,  Location: 4.7 W. KELLOGG (Lat: 47.548022,  Lng: -116.221139),  Route carried "on" structure: Interstate 90,  Year Built: 2015,  Status: Open,  Structure Length: 8.87m (29.10ft),  Average Daily Traffic: 8,750 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 13,125 (year 2039),  Design Load: HL 93,  Features Intersected: PINEHURST ROAD GS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 73.193,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: I,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.4m (40.7ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17086,  Location: 4.7 W. KELLOGG (Lat: 47.547778,  Lng: -116.221944),  Route carried "on" structure: Interstate 90,  Year Built: 2014,  Status: Open,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 8,750 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 13,125 (year 2039),  Design Load: HL 93,  Features Intersected: PINEHURST ROAD GS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 73.217,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: I,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.8m (81.4ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17405,  Location: 5.1 W. KELLOGG (Lat: 47.544806,  Lng: -116.228611),  Route carried "on" structure: Ramp Interstate 90,  Year Built: 1977,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 800 (year 2019),  Average Future Daily Traffic: 1,200 (year 2039),  Design Load: HS 20,  Features Intersected: PINE CREEK;EB OFF RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.282,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,023,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,125,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1741,  Location: 4.9 W. KELLOGG (Lat: 47.547167,  Lng: -116.226778),  Route carried "on" structure: Ramp Interstate 90,  Year Built: 1965,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 800 (year 2019),  Average Future Daily Traffic: 1,200 (year 2039),  Design Load: HS 20,  Features Intersected: PINE CREEK;WB ON RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.031,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,178,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,767,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20456,  Location: 3.6 S. PINEHURST (Lat: 47.487056,  Lng: -116.242028),  Route carried "on" structure: County highway 5750,  Year Built: 2013,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 660 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 990 (year 2039),  Design Load: HL 93,  Features Intersected: W.FK.PINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 165.624,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2046,  Location: 3.4 S. PINEHURST (Lat: 47.490389,  Lng: -116.239778),  Route carried "on" structure: County highway 5750,  Year Built: 1956,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 660 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 990 (year 2039),  Design Load: HS 20,  Features Intersected: PINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 166.007,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.96m (9.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $544,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $816,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20465,  Location: 3.0 S. PINEHURST (Lat: 47.495278,  Lng: -116.240556),  Route carried "on" structure: County highway 5750,  Year Built: 1977,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 800 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,200 (year 2039),  Design Load: HS 20,  Features Intersected: PINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.155,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $784,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,176,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2047,  Location: 2.2 S. PINEHURST (Lat: 47.507300,  Lng: -116.242500),  Route carried "on" structure: County highway 5750,  Year Built: 1953,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 800 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,200 (year 2039),  Design Load: H 20,  Features Intersected: PINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.517,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.44m (11.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $783,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,175,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20475,  Location: 1.9 S. PINEHURST (Lat: 47.510722,  Lng: -116.242083),  Route carried "on" structure: County highway 5750,  Year Built: 1977,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 800 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,200 (year 2039),  Design Load: HS 20,  Features Intersected: PINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.896,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.75m (12.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $690,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $1,035,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20481,  Location: 1.3 S. PINEHURST (Lat: 47.519167,  Lng: -116.241861),  Route carried "on" structure: County highway 5750,  Year Built: 2019,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 800 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,200 (year 2039),  Design Load: HL 93,  Features Intersected: PINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.857,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 20487,  Location: 1.0 N PINEHURST (Lat: 47.546444,  Lng: -116.226250),  Route carried "on" structure: County highway 5759,  Year Built: 1935,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,500 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,250 (year 2039),  Design Load: H 15,  Features Intersected: LITTLE PINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.232,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 4.3m (14.1ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 20496,  Location: 7.2 W. KELLOGG (Lat: 47.549889,  Lng: -116.271306),  Route carried "on" structure: County highway 5752,  Year Built: 2018,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 2,300 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 3,450 (year 2039),  Design Load: HL 93,  Features Intersected: I 90 EB-WB;KINGSTON IC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20501,  Location: 0.17 S. ENAVILLE (Lat: 47.559167,  Lng: -116.252222),  Route carried "on" structure: County highway 5752,  Year Built: 2016,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 2,200 (year 2019),  Truck Traffic: 23%,  Average Future Daily Traffic: 3,300 (year 2039),  Design Load: HL 93,  Features Intersected: S.FK.COEUR D'ALENE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.084,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2059,  Location: AT PINEHURST WCL (Lat: 47.541694,  Lng: -116.241028),  Route carried "on" structure: City street 5764,  Year Built: 1967,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 2,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,300 (year 2039),  Design Load: HS 20,  Features Intersected: PINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.527,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.66m (15.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,464,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $2,196,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 30705,  Location: 3.5 N. 0.6 E. ENAVILLE (Lat: 47.610583,  Lng: -116.238139),  Route carried "on" structure: County highway ,  Year Built: 1968,  Status: Open,  Structure Length: 13.72m (45.01ft),  Average Daily Traffic: 30 (year 2019),  Truck Traffic: 33%,  Average Future Daily Traffic: 45 (year 2039),  Design Load: HS 20,  Features Intersected: CD'A RIVER;N.FK.CD'A R,  Facility Carried by Structure: LITTLE N FORK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 191.525,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3072,  Location: 4.0 S. 0.9 W. PINEHURST (Lat: 47.481500,  Lng: -116.251611),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 150 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 225 (year 2039),  Design Load: HS 20,  Features Intersected: W.FK.PINE CREEK,  Facility Carried by Structure: ROSS GULCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 160.946,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $900,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3075,  Location: 0.4 S. 0.5 W. PINEHURST (Lat: 47.532639,  Lng: -116.244583),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 300 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 450 (year 2039),  Design Load: HS 20,  Features Intersected: PINE CREEK,  Facility Carried by Structure: OHIO AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.783,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.21m (13.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,093,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,640,000 ( Estimate for 2018),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 30785,  Location: 0.6 N. ENAVILLE (Lat: 47.569556,  Lng: -116.252528),  Route carried "on" structure: County highway ,  Year Built: 1930,  Status: Posted for load,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 1,100 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 1,650 (year 2039),  Design Load: H 15,  Features Intersected: STC 5752;N.FK.CD'A RIVER,  Facility Carried by Structure: OLD RIVER ROAD
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 161.320,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 14.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 9.17m (30.09ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2020,  Underwater Inspection Date: October 2021,  Bridge Improvement Cost: $1,490,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $2,235,000 ( Estimate for 2019),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 30813,  Location: 4.5 S. 0.8 E. PINEHURST (Lat: 47.469833,  Lng: -116.219806),  Route carried "on" structure: County highway ,  Year Built: 2021,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 30 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 45 (year 2041),  Design Load: HL 93,  Features Intersected: TRAPPER CREEK,  Facility Carried by Structure: TRAPPER CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.266,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: No rating analysis performed,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: No rating analysis performed,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 30815,  Location: 4.6 S. 0.8 E. PINEHURST (Lat: 47.472278,  Lng: -116.216861),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 30 (year 2019),  Truck Traffic: 33%,  Average Future Daily Traffic: 45 (year 2039),  Design Load: HS 20,  Features Intersected: E. FK. PINE CREEK,  Facility Carried by Structure: E.FK.PINE CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.790,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $660,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $990,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3082,  Location: 4.4 S. 0.5 E. PINEHURST (Lat: 47.475000,  Lng: -116.220833),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 130 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 195 (year 2039),  Design Load: HS 20,  Features Intersected: E. FK. PINE CREEK,  Facility Carried by Structure: E.FK.PINE CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.191,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 30855,  Location: 3.4 N. 0.4 E. ENAVILLE (Lat: 47.610333,  Lng: -116.240472),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 150 (year 2039),  Design Load: HS 20,  Features Intersected: LITTLE N.FK.CDA RIVER,  Facility Carried by Structure: OLD RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 167.409,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.5m (136.2ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 46.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3087,  Location: 8.3 W. KELLOGG (Lat: 47.550389,  Lng: -116.294833),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 7.10m (23.29ft),  Average Daily Traffic: 250 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 375 (year 2039),  Design Load: HS 20,  Features Intersected: I 90 EB-WB;HILLTOP RD.GS,  Facility Carried by Structure: HILLTOP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.116,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.17m (26.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,950,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $2,925,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 30875,  Location: 6.2 W. KELLOGG (Lat: 47.545417,  Lng: -116.252472),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 6.55m (21.49ft),  Average Daily Traffic: 490 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 735 (year 2039),  Design Load: HS 20,  Features Intersected: I 90;SHIPLETT ROAD GS,  Facility Carried by Structure: SHIPLETT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 160.948,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.86m (25.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,447,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $2,171,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 30986,  Location: 4.4 S. 0.5 E. PINEHURST (Lat: 47.476722,  Lng: -116.221639),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 30 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 45 (year 2039),  Design Load: HS 20,  Features Intersected: E. FK. PINE CREEK,  Facility Carried by Structure: HUNTER TRAPPER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 179.146,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $407,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $672,000,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L59844,  Location: 5.6 mi S of I90 (Lat: 47.476669,  Lng: -116.221669),  Route carried "on" structure: Federal lands road ,  Year Built: 1998,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 25 (year 2011),  Truck Traffic: 10%,  Average Future Daily Traffic: 35 (year 2040),  Design Load: HS 20,  Features Intersected: East Fork Pine Creek,  Facility Carried by Structure: 4002: HUNTER-TRAPP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: Bureau of Land Management,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1707,  Location: 5.0 W. KELLOGG (Lat: 47.546222,  Lng: -116.227111),  Route carried "under" structure: County highway 5750,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 3,300 (year 2018),  Truck Traffic: 6%,  Features Intersected: S 5750;PINE CR;PINEHURST,  Facility Carried by Structure: I 90 EBL
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 13.258,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 17075,  Location: 5.0 W. KELLOGG (Lat: 47.547064,  Lng: -116.225744),  Route carried "under" structure: County highway 5750,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 3,300 (year 2018),  Truck Traffic: 6%,  Features Intersected: S 5750;PINE CR;PINEHURST,  Facility Carried by Structure: I 90 WBL
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 13.290,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 17081,  Location: 4.7 W. KELLOGG (Lat: 47.548022,  Lng: -116.221139),  Route carried "under" structure: County highway 5759,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 1,400 (year 2018),  Truck Traffic: 17%,  Features Intersected: PINEHURST ROAD GS,  Facility Carried by Structure: I 90 WBL
Minimum Vertical Clearance: 6.93m (22.74ft),  Kilometerpoint: 13.671,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 17086,  Location: 4.7 W. KELLOGG (Lat: 47.547778,  Lng: -116.221944),  Route carried "under" structure: County highway 5759,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 1,400 (year 2018),  Truck Traffic: 17%,  Features Intersected: PINEHURST ROAD GS,  Facility Carried by Structure: I 90 EBL
Minimum Vertical Clearance: 6.86m (22.51ft),  Kilometerpoint: 13.702,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.8m (81.4ft)

Find on map >>   Show street view

Structure Number: 20496,  Location: 7.2 W. KELLOGG (Lat: 47.549889,  Lng: -116.271306),  Route carried "under" structure: Interstate 90,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2018),  Truck Traffic: 21%,  Features Intersected: I 90 EB-WB;KINGSTON IC,  Facility Carried by Structure: STC5752;CDA RVR RD
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 69.228,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 30785,  Location: 0.6 N. ENAVILLE (Lat: 47.569556,  Lng: -116.252528),  Route carried "under" structure: County highway 5752,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 1,100 (year 2018),  Truck Traffic: 28%,  Features Intersected: STC 5752;N.FK.CD'A RIVER,  Facility Carried by Structure: OLD RIVER ROAD
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 3.364,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 3087,  Location: 8.3 W. KELLOGG (Lat: 47.550389,  Lng: -116.294833),  Route carried "under" structure: Interstate 90,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 2018),  Truck Traffic: 22%,  Features Intersected: I 90 EB-WB;HILLTOP RD.GS,  Facility Carried by Structure: HILLTOP ROAD
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 67.398,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 30875,  Location: 6.2 W. KELLOGG (Lat: 47.545417,  Lng: -116.252472),  Route carried "under" structure: Interstate 90,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2018),  Truck Traffic: 21%,  Features Intersected: I 90;SHIPLETT ROAD GS,  Facility Carried by Structure: SHIPLETT ROAD
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 70.739,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.4m (57.1ft)

Discuss Pinehurst, Idaho (ID) on our hugely popular Idaho forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.