  • National Bridge Inventory (NBI) Statistics
  • 31Number of bridges
  • 246ft / 75.5mTotal length
  • $54,613,000Total costs
  • 138,762Total average daily traffic
  • 20,458Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pomfret
  • No street view available for this location

New bridges in Pomfret, NY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 191950-1959
  • 11960-1969
  • 11970-1979
  • 11980-1989
  • 31990-1999
  • 22000-2009
  • 32010-2019
Reconstructed bridges in Pomfret, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 21980-1989
  • 01990-1999
  • 22000-2009
Average Bridge Daily Traffic in Pomfret, NY
Average Bridge Truck Traffic in Pomfret, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.8%Excellent
  • 5.3%Very good
  • 21.1%Good
  • 31.6%Satisfactory
  • 21.1%Fair
  • 5.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.8%Excellent
  • 15.8%Very good
  • 36.8%Good
  • 21.1%Satisfactory
  • 10.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.3%Excellent
  • 10.5%Very good
  • 31.6%Good
  • 47.4%Satisfactory
  • 5.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.3%Excellent
  • 15.8%Very good
  • 10.5%Good
  • 47.4%Satisfactory
  • 15.8%Fair
  • 5.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Excellent
  • 33.3%Good
  • 16.7%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 101539,  Location: 2.8 MI NE OF BROCTON (Lat: 42.411589,  Lng: -79.396006),  Route carried "on" structure: US 20,  Year Built: 2004,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 3,500 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,533 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: LIT CANADAWAY CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.816,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Channel: Very good,  Culverts: Excellent,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $658,000,  Roadway Improvement Cost: $385,000,  Total Project Cost: $1,043,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 102787,  Location: 1.2MI S JCT RTS 60 & 83 (Lat: 42.397347,  Lng: -79.303908),  Route carried "on" structure: State highway 60,  Year Built: 1993,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 7,055 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 7,122 (year 2040),  Design Load: HS 20,  Features Intersected: CANADAWAY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.799,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 49.6m (162.7ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.02m (16.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,093,000,  Roadway Improvement Cost: $1,811,000,  Total Project Cost: $4,905,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102788,  Location: JCT SH 60 & SH 83 (Lat: 42.414719,  Lng: -79.304672),  Route carried "on" structure: State highway 60,  Year Built: 1931,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 8,914 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 8,955 (year 2040),  Features Intersected: DUTCH HOLLW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.762,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $527,000,  Roadway Improvement Cost: $309,000,  Total Project Cost: $836,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 22127,  Location: 1 MI S OF LAMBERTON (Lat: 42.396131,  Lng: -79.394372),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 464 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 650 (year 2040),  Design Load: HS 20,  Features Intersected: LIT CANADAWAY CRK,  Facility Carried by Structure: ELLICOTT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.963,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $458,000,  Roadway Improvement Cost: $268,000,  Total Project Cost: $727,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221271,  Location: 1.5 MI N OF CASSADAGA (Lat: 42.371581,  Lng: -79.324750),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 586 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 820 (year 2036),  Features Intersected: FREDONIA RES TRIB,  Facility Carried by Structure: GLASGOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.786,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 74.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $106,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $168,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 221272,  Location: 1.0 MI N OF LAMBERTON (Lat: 42.424358,  Lng: -79.402072),  Route carried "on" structure: Other road ,  Year Built: 1955,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 109 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 153 (year 2036),  Design Load: HS 20,  Features Intersected: LIT CANADAWAY CRK,  Facility Carried by Structure: LOWELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.788,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 76.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $439,000,  Roadway Improvement Cost: $257,000,  Total Project Cost: $695,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 221273,  Location: 2.2 MI S OF LEONA (Lat: 42.386336,  Lng: -79.298569),  Route carried "on" structure: Other road ,  Year Built: 1960,  Year Reconstructed: 1981,  Status: Posted for load-capacity,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 232 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 325 (year 2038),  Design Load: HS 20,  Features Intersected: CANADAWAY CREEK,  Facility Carried by Structure: SHUMLA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.625,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 22.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $787,000,  Roadway Improvement Cost: $461,000,  Total Project Cost: $1,247,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226774,  Location: 2 MILES SW OF FREDONIA (Lat: 42.400250,  Lng: -79.358964),  Route carried "on" structure: Other road ,  Year Built: 2016,  Status: Open,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 360 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 504 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: LIT CANADAWAY CRK,  Facility Carried by Structure: CHAUTAUQUA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.337,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.6m (31.5ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Poor,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.99m (3.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $405,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $641,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332539,  Location: 2.1 MI N OF CASSADAGA (Lat: 42.379053,  Lng: -79.314231),  Route carried "on" structure: Other road ,  Year Built: 1985,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 152 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 213 (year 2037),  Features Intersected: TRB FREDONIA RESV,  Facility Carried by Structure: DARBY SWITCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,064,000,  Roadway Improvement Cost: $623,000,  Total Project Cost: $1,687,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33254,  Location: .2 MILE WEST OF LAONA (Lat: 42.420756,  Lng: -79.309942),  Route carried "on" structure: County highway ,  Year Built: 2012,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 3,300 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,083 (year 2040),  Design Load: HL 93,  Features Intersected: CANADAWAY CREEK,  Facility Carried by Structure: WEBSTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 75.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,039,000,  Roadway Improvement Cost: $608,000,  Total Project Cost: $1,648,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 332541,  Location: 1.9 MI S OF LAONA (Lat: 42.389656,  Lng: -79.300167),  Route carried "on" structure: Other road ,  Year Built: 2010,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 288 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 403 (year 2036),  Design Load: HL 93,  Features Intersected: CANADAWAY CREEK,  Facility Carried by Structure: SHUMLA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.043,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,070,000,  Roadway Improvement Cost: $627,000,  Total Project Cost: $1,697,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332542,  Location: .6 MI SE OF LAMBERTON (Lat: 42.403408,  Lng: -79.392678),  Route carried "on" structure: Other road ,  Year Built: 1952,  Year Reconstructed: 1988,  Status: Posted for load-capacity,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 239 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 335 (year 2036),  Features Intersected: LIT CANADAWAY CRK,  Facility Carried by Structure: WEBSTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.818,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 20.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $562,000,  Roadway Improvement Cost: $329,000,  Total Project Cost: $891,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332543,  Location: 0.1 MI NW of Cassadaga (Lat: 42.350297,  Lng: -79.326942),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 788 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,103 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: Cassadaga Lakes,  Facility Carried by Structure: CR 48 Dale Dr
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 74.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.12m (20.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,492,000,  Roadway Improvement Cost: $874,000,  Total Project Cost: $2,366,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 332544,  Location: 0.8 MI S OF LAONA (Lat: 42.403350,  Lng: -79.304583),  Route carried "on" structure: Other road ,  Year Built: 1992,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 234 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 328 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: CANADAWAY CREEK,  Facility Carried by Structure: SPODEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.701,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $637,000,  Roadway Improvement Cost: $373,000,  Total Project Cost: $1,010,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 5511271,  Location: 3.2 MI SW OF DUNKIRK INT (Lat: 42.455089,  Lng: -79.366594),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 9,423 (year 2014),  Truck Traffic: 23%,  Design Load: HS 20+Mod,  Features Intersected: BEAVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 757.726,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $666,000,  Roadway Improvement Cost: $390,000,  Total Project Cost: $1,056,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 5511272,  Location: 3.2 MI SW OF DUNKIRK INT (Lat: 42.454469,  Lng: -79.366333),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 6,826 (year 2020),  Truck Traffic: 49%,  Average Future Daily Traffic: 7,650 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BEAVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.418,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $999,000,  Roadway Improvement Cost: $585,000,  Total Project Cost: $1,583,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 5511321,  Location: 2.9 MI W OF DUNKIRK INT (Lat: 42.457200,  Lng: -79.361347),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 9,423 (year 2014),  Truck Traffic: 23%,  Design Load: HS 20+Mod,  Features Intersected: CANADAWAY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 757.228,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,597,000,  Roadway Improvement Cost: $1,521,000,  Total Project Cost: $4,118,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 5511322,  Location: 2.9 MI W OF DUNKIRK INT (Lat: 42.456678,  Lng: -79.360944),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 6,826 (year 2020),  Truck Traffic: 49%,  Average Future Daily Traffic: 7,650 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CANADAWAY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.933,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,597,000,  Roadway Improvement Cost: $1,521,000,  Total Project Cost: $4,118,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 551135,  Location: 5.8 MI SW OF DUNKIRK INT (Lat: 42.420806,  Lng: -79.401633),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 13,652 (year 2020),  Truck Traffic: 49%,  Average Future Daily Traffic: 16,259 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: LIT CANADAWAY CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.672,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,749,000,  Roadway Improvement Cost: $1,024,000,  Total Project Cost: $2,773,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 551136,  Location: 5.7 MI SW OF DUNKIRK INT (Lat: 42.421869,  Lng: -79.399958),  Route carried "on" structure: Other road ,  Year Built: 1957,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 296 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 414 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: NORTH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.110,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.44m (30.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,137,000,  Roadway Improvement Cost: $1,837,000,  Total Project Cost: $4,975,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 551137,  Location: 4.6 MI SW OF DUNKIRK INT (Lat: 42.435200,  Lng: -79.386778),  Route carried "on" structure: County highway ,  Year Built: 1957,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 420 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 519 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE I90,  Facility Carried by Structure: CR 74 BERRY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.655,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Toll Authority,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.79m (19.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,047,000,  Roadway Improvement Cost: $1,198,000,  Total Project Cost: $3,245,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 551138,  Location: 4.6 MI SW OF DUNKIRK INT (Lat: 42.435200,  Lng: -79.385694),  Route carried "on" structure: County highway ,  Year Built: 1957,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 420 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 519 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE I90,  Facility Carried by Structure: CR 74 BERRY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.751,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Toll Authority,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.88m (19.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,067,000,  Roadway Improvement Cost: $1,210,000,  Total Project Cost: $3,277,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 551139,  Location: 3.8 MI SW OF DUNKIRK INT (Lat: 42.446133,  Lng: -79.377267),  Route carried "on" structure: County highway ,  Year Built: 1957,  Status: Open,  Structure Length: 9.17m (30.09ft),  Average Daily Traffic: 1,213 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,500 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: CR 78 VAN BUREN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.832,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.17m (30.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,040,000,  Roadway Improvement Cost: $1,780,000,  Total Project Cost: $4,821,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 55114,  Location: 3.0 MI W OF DUNKIRK INT (Lat: 42.456153,  Lng: -79.362481),  Route carried "on" structure: Other road ,  Year Built: 1955,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 821 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,015 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE I90,  Facility Carried by Structure: CHESTNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Toll Authority,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,604,000,  Roadway Improvement Cost: $939,000,  Total Project Cost: $2,543,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 551141,  Location: 3.0 MI W OF DUNKIRK INT (Lat: 42.456714,  Lng: -79.362775),  Route carried "on" structure: Other road ,  Year Built: 1955,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 821 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,015 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE I90,  Facility Carried by Structure: CHESTNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.030,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Toll Authority,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,604,000,  Roadway Improvement Cost: $939,000,  Total Project Cost: $2,543,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 551136,  Location: 5.7 MI SW OF DUNKIRK INT (Lat: 42.421869,  Lng: -79.399958),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 10,400 (year 1977),  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: NORTH RD
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 762.312,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 551137,  Location: 4.6 MI SW OF DUNKIRK INT (Lat: 42.435200,  Lng: -79.386778),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 10,400 (year 1977),  Features Intersected: RTE I90,  Facility Carried by Structure: CR 74 BERRY RD
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 760.510,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 551138,  Location: 4.6 MI SW OF DUNKIRK INT (Lat: 42.435200,  Lng: -79.385694),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 10,400 (year 1977),  Features Intersected: RTE I90,  Facility Carried by Structure: CR 74 BERRY RD
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 760.494,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 551139,  Location: 3.8 MI SW OF DUNKIRK INT (Lat: 42.446133,  Lng: -79.377267),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 10,400 (year 1977),  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: CR 78 VAN BUREN RD
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 759.046,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 55114,  Location: 3.0 MI W OF DUNKIRK INT (Lat: 42.456153,  Lng: -79.362481),  Route carried "under" structure: Interstate 90,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 10,400 (year 1977),  Features Intersected: RTE I90,  Facility Carried by Structure: CHESTNUT ST
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 757.340,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 551141,  Location: 3.0 MI W OF DUNKIRK INT (Lat: 42.456714,  Lng: -79.362775),  Route carried "under" structure: Interstate 90,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 10,400 (year 1977),  Features Intersected: RTE I90,  Facility Carried by Structure: CHESTNUT ST
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 757.356,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)