Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Port Angeles, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 315ft / 95.8mTotal length
  • $43,574,000Total costs
  • 83,151Total average daily traffic
  • 6,426Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Port Angeles
  • No street view available for this location

New bridges in Port Angeles, WA - historical statistics
  • New bridges - historical statistics
  • 31950-1959
  • 21960-1969
  • 11970-1979
  • 21980-1989
  • 21990-1999
  • 32000-2009
  • 12010-2019
Average Bridge Daily Traffic in Port Angeles, WA
Average Bridge Truck Traffic in Port Angeles, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 45.5%Good
  • 9.1%Satisfactory
  • 36.4%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 63.6%Good
  • 27.3%Satisfactory
  • 9.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 27.3%Very good
  • 45.5%Good
  • 18.2%Satisfactory
  • 9.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 62.5%Very good
  • 12.5%Satisfactory
  • 12.5%Fair
  • 12.5%Poor
Find on map >>   Show street view

Structure Number: 5115A,  Location: JCT US 101 (Lat: 48.106583,  Lng: -123.462611),  Route carried "on" structure: State highway 117,  Year Built: 1956,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 1,212 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 1,517 (year 2039),  Features Intersected: US 101
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $768,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $1,536,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9090A,  Location: 37.0 E JCT SR 113 (Lat: 48.101278,  Lng: -123.558528),  Route carried "on" structure: State highway 112,  Year Built: 1972,  Status: Open,  Structure Length: 17.19m (56.40ft),  Average Daily Traffic: 5,654 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,078 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: ELWHA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 96.770,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 115.8m (379.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 69.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.19m (56.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $4,286,000,  Roadway Improvement Cost: $857,000,  Total Project Cost: $8,573,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 15259A,  Location: 0.4 E JCT SR 117 (Lat: 48.107806,  Lng: -123.453944),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 1,941 (year 2002),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,129 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: US 101,  Facility Carried by Structure: PINE ST/BLACK DIAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.5m (132.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.21m (13.81ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $662,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,325,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 81422,  Location: 01.90 E JCT SR112 (Lat: 48.111639,  Lng: -123.514444),  Route carried "on" structure: County highway 93110,  Year Built: 1957,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,748 (year 2017),  Truck Traffic: 40%,  Average Future Daily Traffic: 3,320 (year 2034),  Design Load: HS 15,  Features Intersected: DRY CREEK,  Facility Carried by Structure: EDGEWOOD DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83749,  Location: 00.2 SE JCT SR101 (Lat: 48.063333,  Lng: -123.571667),  Route carried "on" structure: County highway 30380,  Year Built: 1986,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 557 (year 2017),  Truck Traffic: 40%,  Average Future Daily Traffic: 1,170 (year 2037),  Design Load: HS 20,  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: OLY.HOTSPRINGS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 85033,  Location: 0.7 W DOWNTOWN (Lat: 48.121667,  Lng: -123.445000),  Route carried "on" structure: City street 990,  Year Built: 1980,  Status: Open,  Structure Length: 10.94m (35.89ft),  Average Daily Traffic: 4,300 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,470 (year 2038),  Features Intersected: THIRD STREET,  Facility Carried by Structure: TUMWATER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.94m (35.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,723,000,  Roadway Improvement Cost: $345,000,  Total Project Cost: $3,446,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 87964,  Location: 0.4 W Lincoln St (US101) (Lat: 48.115389,  Lng: -123.445111),  Route carried "on" structure: City street 990,  Year Built: 2008,  Status: Open,  Structure Length: 23.10m (75.79ft),  Average Daily Traffic: 15,584 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 22,220 (year 2041),  Design Load: HL 93,  Features Intersected: Valley St & Valley Crk,  Facility Carried by Structure: 8th Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 47.2m (154.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.10m (75.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $6,367,000,  Roadway Improvement Cost: $1,273,000,  Total Project Cost: $12,734,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 87965,  Location: 0.8 W Lincoln St (US1010 (Lat: 48.117778,  Lng: -123.451111),  Route carried "on" structure: City street 990,  Year Built: 2008,  Status: Open,  Structure Length: 23.10m (75.79ft),  Average Daily Traffic: 14,212 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 21,066 (year 2041),  Design Load: HL 93,  Features Intersected: Tumwater Crk & SR117,  Facility Carried by Structure: 8th Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.295,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 47.2m (154.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.10m (75.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $6,367,000,  Roadway Improvement Cost: $1,273,000,  Total Project Cost: $12,734,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8843,  Location: 0.4 mi N of W Hill St. (Lat: 48.134328,  Lng: -123.465408),  Route carried "on" structure: City street 990,  Year Built: 1961,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 3,608 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,020 (year 2038),  Design Load: H 20,  Features Intersected: Log Channel,  Facility Carried by Structure: Marine Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.0m,  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 72 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: Febuary 2019,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $348,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 88631,  Location: 0.8 E JCT SR 101 (Lat: 48.104806,  Lng: -123.421389),  Route carried "on" structure: City street 990,  Year Built: 2013,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 7,306 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,401 (year 2041),  Design Load: HL 93,  Features Intersected: PEABODY CREEK,  Facility Carried by Structure: LAURIDSEN BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.6m (143.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 14.2m (46.6ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,402,000,  Roadway Improvement Cost: $280,000,  Total Project Cost: $2,803,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9500024P,  Location: 4.1 MI. S. OF JCT. HWY. 1 (Lat: 48.064639,  Lng: -123.427306),  Route carried "on" structure: ServiceState lands road ,  Year Built: 1969,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 5 (year 2011),  Average Future Daily Traffic: 10 (year 2031),  Features Intersected: HURRICANE RIDGE ROAD,  Facility Carried by Structure: DNR ACCESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $75,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5115A,  Location: 3.6 N JCT SR 112 (Lat: 48.106583,  Lng: -123.462611),  Route carried "under" structure: US 101,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 10,916 (year 2019),  Truck Traffic: 4%,  Features Intersected: US 101,  Facility Carried by Structure: SR 117 NB
Minimum Vertical Clearance: 9.30m (30.51ft),  Kilometerpoint: 396.301,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 15259A,  Location: 0.4 E JCT SR 117 (Lat: 48.107806,  Lng: -123.453944),  Route carried "under" structure: US 101,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 11,322 (year 2019),  Truck Traffic: 4%,  Features Intersected: US 101,  Facility Carried by Structure: PINE ST/BLACK DIAM
Minimum Vertical Clearance: 6.43m (21.10ft),  Kilometerpoint: 396.929,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 87965,  Location: 1.0 N JCT US 101 (Lat: 48.117778,  Lng: -123.451111),  Route carried "under" structure: State highway 117,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 4,786 (year 2014),  Truck Traffic: 32%,  Features Intersected: Tumwater Crk & SR117,  Facility Carried by Structure: 8th Street
Minimum Vertical Clearance: 24.31m (79.76ft),  Kilometerpoint: 1.561,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.2m (154.9ft)

Discuss Port Angeles, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.