Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Port Hadlock-Irondale, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 157ft / 47.8mTotal length
  • $15,742,000Total costs
  • 52,640Total average daily traffic
  • 4,262Total average daily truck traffic
  • 72,169Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Port Hadlock-Irondale
  • No street view available for this location

New bridges in Port Hadlock-Irondale, WA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11940-1949
  • 31950-1959
  • 11970-1979
  • 31980-1989
  • 12000-2009
Reconstructed bridges in Port Hadlock-Irondale, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
Average Bridge Daily Traffic in Port Hadlock-Irondale, WA
Average Bridge Truck Traffic in Port Hadlock-Irondale, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Very good
  • 50.0%Good
  • 30.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Very good
  • 50.0%Good
  • 40.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 50.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Very good
  • 11.1%Good
  • 22.2%Satisfactory
Find on map >>   Show street view

Structure Number: 2571A,  Location: 0.1 E JCT US 101 (Lat: 47.987833,  Lng: -122.885750),  Route carried "on" structure: State highway 20,  Year Built: 1940,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 5,013 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,817 (year 2039),  Design Load: H 15,  Features Intersected: SNOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.17m (10.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018,  Bridge Improvement Cost: $749,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,498,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5377A,  Location: 2.2 E JCT US 101 (Lat: 47.995833,  Lng: -122.846111),  Route carried "on" structure: State highway 20,  Year Built: 1956,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 5,752 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 7,822 (year 2039),  Design Load: HS 20,  Features Intersected: EAGLEMOUNT HALF BRIDGE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.589,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 24.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $461,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $922,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13073A,  Location: 7.8 S CLALLAM CO (Lat: 47.989083,  Lng: -122.889556),  Route carried "on" structure: US 101,  Year Built: 1986,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 13,449 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 18,290 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SALMON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 454.495,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.72m (12.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,122,000,  Roadway Improvement Cost: $224,000,  Total Project Cost: $2,245,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 13073B,  Location: 8.0 S CLALLAM CO (Lat: 47.987333,  Lng: -122.885861),  Route carried "on" structure: US 101,  Year Built: 1986,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 13,449 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 18,290 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SNOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 454.817,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 17.3m (56.8ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $582,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,164,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 79967,  Location: 0.15 MI. NE SR-116 (Lat: 48.032500,  Lng: -122.778333),  Route carried "on" structure: Spur County highway 63450,  Year Built: 1971,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 140 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 158 (year 2042),  Features Intersected: CHIMACUM CREEK,  Facility Carried by Structure: HUNT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80439,  Location: 2.7 E JCT SR 19 (Lat: 48.031494,  Lng: -122.733189),  Route carried "on" structure: State highway 116,  Year Built: 1951,  Status: Open,  Structure Length: 20.42m (66.99ft),  Average Daily Traffic: 2,786 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,788 (year 2039),  Design Load: HS 20,  Features Intersected: PORTAGE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.297,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Navigation Control: Yes ( Vertical Clearance: 17.4m (57.1ft), Horizontal Clearance: 42.7m (140.1ft)),  Material/Design: Steel,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 74.7m (245.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 20.42m (66.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: March 2021,  Underwater Inspection Date: July 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $3,752,000,  Roadway Improvement Cost: $750,000,  Total Project Cost: $7,504,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 81786,  Location: 9.4 N JCT SR 104 (Lat: 48.011833,  Lng: -122.775306),  Route carried "on" structure: State highway 19,  Year Built: 1916,  Year Reconstructed: 1953,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 8,793 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 11,958 (year 2039),  Design Load: H 15,  Features Intersected: CHIMACUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.080,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 26.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $502,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 84649,  Location: 3.45 JCT FAS9517 (Lat: 47.963333,  Lng: -122.780556),  Route carried "on" structure: County highway 93150,  Year Built: 1955,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,069 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,735 (year 2042),  Design Load: HS 20,  Features Intersected: CHIMACUM CREEK,  Facility Carried by Structure: CENTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8576,  Location: 0.1 MI S LATAH (Lat: 47.276067,  Lng: -117.153156),  Route carried "on" structure: County highway 2976,  Year Built: 1988,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 16 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 23 (year 2040),  Design Load: HS 20,  Features Intersected: LATAH CREEK,  Facility Carried by Structure: MARSH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.1m (148.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $954,000,  Roadway Improvement Cost: $191,000,  Total Project Cost: $1,907,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 866,  Location: 0.5 NW JCT SR101 (Lat: 48.042406,  Lng: -122.878467),  Route carried "on" structure: County highway 50140,  Year Built: 2000,  Status: Open,  Structure Length: 8.96m (29.40ft),  Average Daily Traffic: 173 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 288 (year 2038),  Design Load: HS 20,  Features Intersected: CONTRACTOR'S CREEK,  Facility Carried by Structure: OLD GARDINER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Port Hadlock-Irondale, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.