Bridge Statistics for Port Jervis, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 433ft / 132mTotal length
  • $83,603,000Total costs
  • 193,000Total average daily traffic
  • 21,167Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Port Jervis
  • No street view available for this location

New bridges in Port Jervis, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 51930-1939
  • 121960-1969
  • 22000-2009
  • 22010-2019
  • 12020-2022
Reconstructed bridges in Port Jervis, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 01990-1999
  • 32000-2009
  • 12010-2019
Average Bridge Daily Traffic in Port Jervis, NY
Average Bridge Truck Traffic in Port Jervis, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 21.4%Excellent
  • 14.3%Very good
  • 14.3%Good
  • 35.7%Satisfactory
  • 7.1%Fair
  • 7.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 42.9%Excellent
  • 7.1%Very good
  • 21.4%Satisfactory
  • 28.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 21.4%Excellent
  • 7.1%Very good
  • 14.3%Good
  • 21.4%Satisfactory
  • 21.4%Fair
  • 7.1%Poor
  • 7.1%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.1%Excellent
  • 11.1%Very good
  • 33.3%Good
  • 44.4%Satisfactory
Find on map >>   Show street view

Structure Number: 1003081,  Location: 3.2 MI E I84 INT 1 (Lat: 41.373494,  Lng: -74.619953),  Route carried "on" structure: Interstate 84,  Year Built: 1964,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 16,379 (year 2009),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,930 (year 2029),  Design Load: HS 20,  Features Intersected: RTE 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.096,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,316,000,  Roadway Improvement Cost: $1,356,000,  Total Project Cost: $3,672,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1003082,  Location: 3.2 MI E I84 INT 1 (Lat: 41.373186,  Lng: -74.619811),  Route carried "on" structure: Interstate 84,  Year Built: 1964,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 13,168 (year 2019),  Truck Traffic: 24%,  Average Future Daily Traffic: 23,085 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.112,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Serious,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.66m (15.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,329,000,  Roadway Improvement Cost: $1,364,000,  Total Project Cost: $3,692,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1032451,  Location: EXIT 2 OF I84 (Lat: 41.373900,  Lng: -74.613950),  Route carried "on" structure: Interstate 84,  Year Built: 1966,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 16,379 (year 2009),  Truck Traffic: 21%,  Design Load: HS 20,  Features Intersected: COUNTY ROAD 35U
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.562,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.78m (15.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,475,000,  Roadway Improvement Cost: $1,449,000,  Total Project Cost: $3,924,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1032452,  Location: EXIT 2 OF I84 (Lat: 41.373583,  Lng: -74.614056),  Route carried "on" structure: Interstate 84,  Year Built: 1966,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 13,168 (year 2019),  Truck Traffic: 25%,  Average Future Daily Traffic: 23,085 (year 2040),  Design Load: HS 20,  Features Intersected: COUNTY ROAD 35U
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.611,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,646,000,  Roadway Improvement Cost: $1,550,000,  Total Project Cost: $4,196,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1052401,  Location: IN PORT JERVIS (Lat: 41.357164,  Lng: -74.693478),  Route carried "on" structure: Interstate 84,  Year Built: 1967,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 38.19m (125.30ft),  Average Daily Traffic: 14,404 (year 2013),  Truck Traffic: 13%,  Design Load: HL 93,  Features Intersected: DELAWARE RIVER, NEVERSIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.851,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 42.4m (139.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 38.19m (125.30ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: May 2018,  Bridge Improvement Cost: $15,397,000,  Roadway Improvement Cost: $9,016,000,  Total Project Cost: $24,413,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 1052402,  Location: IN PORT JERVIS (Lat: 41.357258,  Lng: -74.694231),  Route carried "on" structure: Interstate 84,  Year Built: 1967,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 38.19m (125.30ft),  Average Daily Traffic: 13,159 (year 2019),  Truck Traffic: 22%,  Average Future Daily Traffic: 22,283 (year 2040),  Design Load: HS 20,  Features Intersected: DELAWARE RIVER, NEVERSIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 42.1m (138.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 38.19m (125.30ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: May 2018,  Bridge Improvement Cost: $15,355,000,  Roadway Improvement Cost: $8,992,000,  Total Project Cost: $24,347,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200305,  Location: JCT US6 & NEVERSINK RIVER (Lat: 41.361275,  Lng: -74.685428),  Route carried "on" structure: US 6,  Year Built: 2019,  Status: Open,  Structure Length: 4.56m (14.96ft),  Average Daily Traffic: 13,872 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,937 (year 2040),  Design Load: HL 93,  Features Intersected: NEVERSINK RIVER
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 3.121,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 44.2m (145.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.55m (14.93ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,340,000,  Roadway Improvement Cost: $1,956,000,  Total Project Cost: $5,297,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200306,  Location: JCT RTE 6 & CLOVE BROOK (Lat: 41.357531,  Lng: -74.682606),  Route carried "on" structure: US 6,  Year Built: 2019,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 13,872 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,937 (year 2040),  Design Load: HL 93,  Features Intersected: CLOVE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.588,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $873,000,  Roadway Improvement Cost: $511,000,  Total Project Cost: $1,384,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222368,  Location: .7 MILE W OF PORT JERVIS (Lat: 41.378719,  Lng: -74.698778),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 2,230 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,759 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MNRR PJ LINE,  Facility Carried by Structure: WEST MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 2,  Owner: Railroad,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.3m (79.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Very good,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.02m (16.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,451,000,  Roadway Improvement Cost: $850,000,  Total Project Cost: $2,300,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222369,  Location: AT PORT JERVIS (Lat: 41.377950,  Lng: -74.678153),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,451 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,031 (year 2038),  Features Intersected: COLD CREEK,  Facility Carried by Structure: HAMILTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $215,000,  Total Project Cost: $581,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22237,  Location: AT PORT JERVIS (Lat: 41.381331,  Lng: -74.680997),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 719 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 889 (year 2040),  Features Intersected: SPILLWAY BROOK,  Facility Carried by Structure: GLASS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $477,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 227062,  Location: Front St.Over Pike St. (Lat: 41.374589,  Lng: -74.693967),  Route carried "on" structure: Business City street ,  Year Built: 1930,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 6,947 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 8,439 (year 2040),  Features Intersected: Rt 209 WB, Rt 209 Pedest,  Facility Carried by Structure: FRONT STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 67.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,414,000,  Roadway Improvement Cost: $1,414,000,  Total Project Cost: $3,828,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 227127,  Location: JCT RTE 6 & CLOVE BROOK (Lat: 41.357219,  Lng: -74.682342),  Route carried "on" structure: US 6,  Year Built: 2020,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 13,872 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,937 (year 2040),  Design Load: HL 93,  Features Intersected: Clove Brook
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 3.636,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $801,000,  Roadway Improvement Cost: $469,000,  Total Project Cost: $1,270,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 334447,  Location: 0.6 MI S OF PORT JERVIS (Lat: 41.359378,  Lng: -74.685669),  Route carried "on" structure: Business County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,731 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,102 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MILL BROOK,  Facility Carried by Structure: SOUTH MAPLE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $782,000,  Roadway Improvement Cost: $458,000,  Total Project Cost: $1,240,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 522306,  Location: PORT JERVIS PIKE ST (Lat: 41.371739,  Lng: -74.697158),  Route carried "on" structure: US 6,  Year Built: 1939,  Status: Open,  Structure Length: 20.09m (65.91ft),  Average Daily Traffic: 15,440 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 18,301 (year 2032),  Design Load: HS 20,  Features Intersected: DELAWARE RIVER
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 49.103,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 99.1m (325.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.50m (67.26ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Underwater Inspection Date: December 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $221,000,  Roadway Improvement Cost: $651,000,  Total Project Cost: $2,982,000,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 1003081,  Location: 3.2 MI E I84 INT 1 (Lat: 41.373494,  Lng: -74.619953),  Route carried "under" structure: US 6,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 2,387 (year 1999),  Features Intersected: RTE 6,  Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 8.00m (26.25ft),  Kilometerpoint: 6.130,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.6m (57.7ft)

Find on map >>   Show street view

Structure Number: 1003082,  Location: 3.2 MI E I84 INT 1 (Lat: 41.373186,  Lng: -74.619811),  Route carried "under" structure: US 6,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 2,387 (year 1999),  Features Intersected: RTE 6,  Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 8.38m (27.49ft),  Kilometerpoint: 6.130,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.4m (53.8ft)

Find on map >>   Show street view

Structure Number: 1032451,  Location: EXIT 2 OF I84 (Lat: 41.373900,  Lng: -74.613950),  Route carried "under" structure: County highway ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2019),  Truck Traffic: 7%,  Features Intersected: COUNTY ROAD 35U,  Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.6m (57.7ft)

Find on map >>   Show street view

Structure Number: 1032452,  Location: EXIT 2 OF I84 (Lat: 41.373583,  Lng: -74.614056),  Route carried "under" structure: County highway ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2019),  Truck Traffic: 7%,  Features Intersected: COUNTY ROAD 35U,  Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 227062,  Location: Front St.Over Pike St. (Lat: 41.374589,  Lng: -74.693967),  Route carried "under" structure: Business City street ,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 10,458 (year 2014),  Features Intersected: Rt 209 WB, Rt 209 Pedest,  Facility Carried by Structure: FRONT STREET
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 7.9m (25.9ft)

Find on map >>   Show street view

Structure Number: 700303,  Location: IN PORT JERVIS (Lat: 41.374417,  Lng: -74.694186),  Route carried "under" structure: US 6,  Year Built: 1936,  Structure Length: 0. m,  Average Daily Traffic: 12,400 (year 1979),  Features Intersected: RTE 6,  Facility Carried by Structure: MNRR PJ LINE
Minimum Vertical Clearance: 4.16m (13.65ft),  Kilometerpoint: 1.384,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 7.9m (25.9ft)

Find on map >>   Show street view

Structure Number: 700304,  Location: SOUTH SIDE OF PORT JERVIS (Lat: 41.363406,  Lng: -74.684800),  Route carried "under" structure: US 6,  Year Built: 1936,  Structure Length: 0. m,  Average Daily Traffic: 900 (year 1982),  Features Intersected: RTE 6,  Facility Carried by Structure: MNRR PJ LINE
Minimum Vertical Clearance: 4.03m (13.22ft),  Kilometerpoint: 2.880,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 771289,  Location: IN TRISTATES (Lat: 41.361694,  Lng: -74.682308),  Route carried "under" structure: City street ,  Year Built: 1905,  Structure Length: 0. m,  Average Daily Traffic: 2,677 (year 2018),  Truck Traffic: 6%,  Features Intersected: NORTH MAPLE AVE,  Facility Carried by Structure: MNRR PJ LINE
Minimum Vertical Clearance: 3.81m (12.50ft),  Kilometerpoint: 0.000,  Lanes under structure: 1,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Length of Maximum Span: 6.7m (22.0ft)