Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Powell, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 344ft / 105mTotal length
  • $115,000Total costs
  • 35,206Total average daily traffic
  • 4,009Total average daily truck traffic
  • 53,630Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Powell
  • No street view available for this location

New bridges in Powell, TX - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 11950-1959
  • 21960-1969
  • 21970-1979
  • 31980-1989
  • 22010-2019
Average Bridge Daily Traffic in Powell, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 44.4%Good
  • 44.4%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Good
  • 66.7%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Good
  • 77.8%Satisfactory
  • 11.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 27.3%Good
  • 72.7%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 181750016301031,  Location: 4.60 MI E OF IH45 (Lat: 32.109794,  Lng: -96.366006),  Route carried "on" structure: State highway 31,  Year Built: 1964,  Status: Open,  Structure Length: 18.29m (60.01ft),  Average Daily Traffic: 4,784 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 10,120 (year 2033),  Design Load: H 20,  Features Intersected: CHAMBERS CRK REL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.102,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.29m (60.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $34,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $43,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 181750016301032,  Location: 4.90 MI E OF IH45 (Lat: 32.111244,  Lng: -96.360781),  Route carried "on" structure: State highway 31,  Year Built: 1964,  Status: Open,  Structure Length: 25.60m (83.99ft),  Average Daily Traffic: 4,784 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 10,120 (year 2033),  Design Load: H 20,  Features Intersected: CHAMBERS CRK REL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.621,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 21,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.60m (83.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $47,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $59,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 181750016301049,  Location: 4.60 MI E OF IH45 (Lat: 32.109961,  Lng: -96.366067),  Route carried "on" structure: State highway 31,  Year Built: 1984,  Status: Open,  Structure Length: 18.29m (60.01ft),  Average Daily Traffic: 7,826 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 10,120 (year 2033),  Design Load: HS 20,  Features Intersected: CHAMBERS CRK REL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.102,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18175001630105,  Location: 4.90 MI E OF IH45 (Lat: 32.111428,  Lng: -96.360842),  Route carried "on" structure: State highway 31,  Year Built: 1984,  Status: Open,  Structure Length: 25.60m (83.99ft),  Average Daily Traffic: 7,826 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 10,120 (year 2033),  Design Load: HS 20,  Features Intersected: CHAMBERS CRK REL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.621,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 21,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 181750016302041,  Location: 9.6 MI E OF IH45 (Lat: 32.124475,  Lng: -96.279789),  Route carried "on" structure: State highway 31,  Year Built: 1972,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 4,260 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 5,970 (year 2033),  Design Load: HS 20,  Features Intersected: LITTLE RUSH CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.482,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 181750016302042,  Location: 9.6 MI E OF IH45 (Lat: 32.124300,  Lng: -96.279742),  Route carried "on" structure: State highway 31,  Year Built: 1972,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 4,260 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 5,970 (year 2033),  Design Load: HS 20,  Features Intersected: LITTLE RUSH CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.503,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 181750071901001,  Location: 1.20 MI S OF SH 31 (Lat: 32.102331,  Lng: -96.317239),  Route carried "on" structure: State highway 633,  Year Built: 1947,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 298 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 410 (year 2033),  Design Load: H 15,  Features Intersected: DE ARMAN BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.981,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $1,000,  Total Project Cost: $1,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 181750071902002,  Location: 1.00 MI S OF FM 3041 (Lat: 32.159456,  Lng: -96.374794),  Route carried "on" structure: State highway 1129,  Year Built: 1950,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 710 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 600 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH LITTLE RUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.177,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 181750AA0340002,  Location: 1.4 MI SE OF CR NE 2030 (Lat: 32.137022,  Lng: -96.341089),  Route carried "on" structure: County highway 2010,  Year Built: 1985,  Status: Posted for load,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 100 (year 2019),  Average Future Daily Traffic: 50 (year 2031),  Features Intersected: LITTLE RUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Total Project Cost: $11,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 181750AA0340003,  Location: .4 MI EAST O POWELL CITY (Lat: 32.125603,  Lng: -96.318186),  Route carried "on" structure: County highway 2110,  Year Built: 2014,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 100 (year 2014),  Average Future Daily Traffic: 50 (year 2031),  Features Intersected: LITTLE RUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.633,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 181750AA0341001,  Location: 0.45 MI N OF SH 31 (Lat: 32.127617,  Lng: -96.299325),  Route carried "on" structure: County highway 2120,  Year Built: 2013,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 258 (year 2019),  Average Future Daily Traffic: 100 (year 2031),  Features Intersected: LITTLE RUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,000,  Total Project Cost: $1,000,  Deck Structure Type: Corrugated Steel
Discuss Powell, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.