Bridge Statistics for Prescott, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 72ft / 22.4mTotal length
  • $20,978,000Total costs
  • 3,264Total average daily traffic
  • 595Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Prescott
  • No street view available for this location

New bridges in Prescott, WA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 11940-1949
  • 11960-1969
  • 11970-1979
  • 21990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Truck Traffic in Prescott, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Very good
  • 16.7%Good
  • 33.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 37.5%Very good
  • 12.5%Good
  • 37.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 37.5%Very good
  • 12.5%Good
  • 37.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 55.6%Very good
  • 22.2%Good
  • 11.1%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: FZ,  Location: 17.3 N JCT US 12 (Lat: 46.294556,  Lng: -118.340167),  Route carried "on" structure: State highway 125,  Year Built: 1916,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 413 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 462 (year 2039),  Features Intersected: TOUCHET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.626,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.57m (11.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2018,  Bridge Improvement Cost: $655,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $1,310,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 14637A,  Location: 0.5 E JCT SR 125 (Lat: 46.298333,  Lng: -118.328333),  Route carried "on" structure: State highway 124,  Year Built: 1995,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 1,620 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,814 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: WHETSTONE CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.051,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2018,  Bridge Improvement Cost: $517,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,034,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 80073,  Location: 08.39N LW WAITSBURG (Lat: 46.293256,  Lng: -118.293753),  Route carried "on" structure: County highway 96650,  Year Built: 1965,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 190 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 230 (year 2040),  Design Load: HS 20,  Features Intersected: TOUCHET RIVER,  Facility Carried by Structure: HART RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.7m (140.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.94m (16.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,462,000,  Roadway Improvement Cost: $492,000,  Total Project Cost: $4,925,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 83134,  Location: 03.38 N SR 124 (Lat: 46.335650,  Lng: -118.268428),  Route carried "on" structure: County highway 94250,  Year Built: 1922,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 24%,  Average Future Daily Traffic: 120 (year 2040),  Design Load: H 15,  Features Intersected: COLVILLE GULCH,  Facility Carried by Structure: SMITH SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $471,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $942,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 83648,  Location: 01.61 N SR 124 (Lat: 46.313919,  Lng: -118.285997),  Route carried "on" structure: County highway 94250,  Year Built: 1973,  Status: Posted for load,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 98 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 120 (year 2040),  Design Load: HS 20,  Features Intersected: WHETSTONE CREEK,  Facility Carried by Structure: SMITH SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $912,000,  Roadway Improvement Cost: $182,000,  Total Project Cost: $1,824,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85935,  Location: 00.54N SR 124 (Lat: 46.307556,  Lng: -118.314639),  Route carried "on" structure: County highway 46110,  Year Built: 1992,  Status: Posted for load,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 40 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 45 (year 2040),  Design Load: HS 20,  Features Intersected: WHETSTONE CREEK,  Facility Carried by Structure: SKYROCKET RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 17.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.29m (7.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,140,000,  Roadway Improvement Cost: $228,000,  Total Project Cost: $2,280,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8653,  Location: 0.49 SOUTH OF SR 124 (Lat: 46.292800,  Lng: -118.314528),  Route carried "on" structure: County highway 65990,  Year Built: 2000,  Status: Open,  Structure Length: 5.82m (19.09ft),  Average Daily Traffic: 80 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 100 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TOUCHET RIVER,  Facility Carried by Structure: BROWN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.3m (151.9ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.13m (20.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,055,000,  Roadway Improvement Cost: $611,000,  Total Project Cost: $6,110,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 8718,  Location: 3.08 N SR 124 (Lat: 46.331969,  Lng: -118.271375),  Route carried "on" structure: County highway 94250,  Year Built: 2004,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 120 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: COLVILLE GULCH,  Facility Carried by Structure: SMITH SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,155,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 88683,  Location: 0.18 N LWR WAITSBURG RD (Lat: 46.178400,  Lng: -118.304575),  Route carried "on" structure: County highway 96650,  Year Built: 2014,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 210 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 260 (year 2040),  Design Load: HL 93,  Features Intersected: SPRING VALLEY,  Facility Carried by Structure: HART RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 36.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $699,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $1,398,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 2651A,  Location: 16.7 N JCT US 12 (Lat: 46.285083,  Lng: -118.341222),  Route carried "under" structure: State highway 125,  Year Built: 1941,  Structure Length: 0. m,  Average Daily Traffic: 413 (year 2019),  Truck Traffic: 11%,  Features Intersected: STATE ROUTE 125,  Facility Carried by Structure: RAILROAD
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 36.532,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Discuss Prescott, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.