Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Pulaski, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 43Number of bridges
  • 587ft / 179mTotal length
  • $40,735,000Total costs
  • 1,081,730Total average daily traffic
  • 37,858Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pulaski
  • No street view available for this location

New bridges in Pulaski, GA - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 11950-1959
  • 101960-1969
  • 201970-1979
  • 31980-1989
  • 11990-1999
Reconstructed bridges in Pulaski, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31980-1989
  • 21990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Pulaski, GA
Average Bridge Truck Traffic in Pulaski, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 96.0%Good
  • 4.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 96.0%Good
  • 4.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 92.0%Good
  • 8.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 52.2%Very good
  • 34.8%Good
  • 4.3%Satisfactory
  • 8.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 81.8%Good
  • 9.1%Satisfactory
  • 9.1%Fair
Find on map >>   Show street view

Structure Number: 15009,  Location: 2.3 MI S OF HOLMESVILLE (Lat: 31.672489,  Lng: -82.319100),  Route carried "on" structure: County highway 153,  Year Built: 1980,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 70 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 105 (year 2031),  Design Load: H 15,  Features Intersected: SWEETWATER CREEK,  Facility Carried by Structure: MILES-BECKWORTH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $391,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $586,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15017,  Location: 5.7 MI S OF SURRENCY (Lat: 31.645719,  Lng: -82.223419),  Route carried "on" structure: County highway 208,  Year Built: 1965,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 160 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 240 (year 2031),  Design Load: H 15,  Features Intersected: DRY BRANCH,  Facility Carried by Structure: HOLMESVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 15024,  Location: 4.3 MI N OF BAXLEY (Lat: 31.830978,  Lng: -82.327489),  Route carried "on" structure: County highway 591,  Year Built: 1977,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 690 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,035 (year 2031),  Design Load: H 15,  Features Intersected: TEN MILE CREEK,  Facility Carried by Structure: BEN CARTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15028,  Location: 7 MI SW OF BAXLEY (Lat: 31.694519,  Lng: -82.445969),  Route carried "on" structure: County highway 535,  Year Built: 1975,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 190 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 285 (year 2031),  Design Load: H 15,  Features Intersected: BISHOP CREEK,  Facility Carried by Structure: DYAL SCHOOL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $703,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,055,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 150024,  Location: 2.6 MI SW OF KINGSTON (Lat: 34.208847,  Lng: -84.978569),  Route carried "on" structure: US 411,  Year Built: 1959,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 10.88m (35.70ft),  Average Daily Traffic: 15,890 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 23,835 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: ETOWAH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: May 2019,  Bridge Improvement Cost: $1,395,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $2,092,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 150047,  Location: 2.3 MI E OF CARTERSVILLE (Lat: 34.174647,  Lng: -84.759158),  Route carried "on" structure: State highway 113,  Year Built: 1977,  Status: Open,  Structure Length: 8.99m (29.49ft),  Average Daily Traffic: 14,920 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 22,380 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-75
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 48.8m (160.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,153,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,729,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 150052,  Location: 0.6 MI E OF FOLSOM (Lat: 34.380369,  Lng: -84.818928),  Route carried "on" structure: State highway 140,  Year Built: 1973,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 4,350 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,525 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BALLARD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 150072,  Location: 4.1 MI SE OF EMERSON (Lat: 34.088478,  Lng: -84.700608),  Route carried "on" structure: County highway 369,  Year Built: 1977,  Status: Open,  Structure Length: 10.70m (35.10ft),  Average Daily Traffic: 620 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 930 (year 2031),  Design Load: HS 15,  Features Intersected: I-75,  Facility Carried by Structure: ALLTOONA SHORES RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 35.4m (116.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,371,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $2,057,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 150075,  Location: 5.5 MI SE OF EMERSON (Lat: 34.080669,  Lng: -84.676469),  Route carried "on" structure: Interstate 75,  Year Built: 1977,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 88,590 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 132,885 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: M-9464 GLADE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 449.007,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $970,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,455,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 150088,  Location: 2.4 MI E OF CARTERSVILLE (Lat: 34.162997,  Lng: -84.756539),  Route carried "on" structure: Interstate 75,  Year Built: 1977,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 84,630 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 126,945 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 360 OLD RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 461.882,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,253,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,880,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 150089,  Location: 2.4 MI NE OF CARTERSVILLE (Lat: 34.190308,  Lng: -84.766689),  Route carried "on" structure: Interstate 75,  Year Built: 1977,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 77,870 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 116,805 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: M-920 CENTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 465.101,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 19 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 22.7m (74.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,250,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,875,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 150091,  Location: 3.3 MI NE OF CARTERSVILLE (Lat: 34.206658,  Lng: -84.761389),  Route carried "on" structure: Interstate 75,  Year Built: 1977,  Status: Open,  Structure Length: 11.37m (37.30ft),  Average Daily Traffic: 77,870 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 116,805 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 466.710,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.9m (121.1ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,855,000,  Roadway Improvement Cost: $185,000,  Total Project Cost: $2,782,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 150092,  Location: 3.3 MI NE OF CARTERSVILLE (Lat: 34.206389,  Lng: -84.761728),  Route carried "on" structure: Interstate 75,  Year Built: 1977,  Status: Open,  Structure Length: 11.46m (37.60ft),  Average Daily Traffic: 65,710 (year 2011),  Truck Traffic: 26%,  Average Future Daily Traffic: 98,565 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 466.710,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,870,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $2,805,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 150097,  Location: 2.9 MI S OF WHITE (Lat: 34.248458,  Lng: -84.780828),  Route carried "on" structure: Interstate 75,  Year Built: 1969,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 64,580 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 96,870 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: PETTIT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 473.147,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.3m (106.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $425,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $637,000
Find on map >>   Show street view

Structure Number: 150098,  Location: 3 MI SW OF WHITE (Lat: 34.255519,  Lng: -84.791519),  Route carried "on" structure: Interstate 75,  Year Built: 1969,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 64,580 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 96,870 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: PETTIT CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 474.757,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.1m (111.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $343,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $515,000
Find on map >>   Show street view

Structure Number: 150099,  Location: 3.1 MI SW OF WHITE (Lat: 34.257719,  Lng: -84.795850),  Route carried "on" structure: Interstate 75,  Year Built: 1969,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 64,580 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 96,870 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: PETTIT CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 474.757,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.1m (111.9ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $539,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $809,000
Find on map >>   Show street view

Structure Number: 1501,  Location: 4 MI W OF WHITE (Lat: 34.286339,  Lng: -84.820497),  Route carried "on" structure: Interstate 75,  Year Built: 1969,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 58,570 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 87,855 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TWO RUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 479.585,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.1m (111.9ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $408,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $613,000
Find on map >>   Show street view

Structure Number: 150101,  Location: 5.2 MI NW OF WHITE (Lat: 34.308950,  Lng: -84.836406),  Route carried "on" structure: Interstate 75,  Year Built: 1970,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 5.82m (19.09ft),  Average Daily Traffic: 58,570 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 87,855 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 179 CEDAR CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 482.803,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.1m (111.9ft),  Skew: 34 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 39.5m (129.6ft),  Out-to-Out Width: 41.1m (134.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 24.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,560,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $2,341,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 150103,  Location: 2.7 MI E OF ADAIRSVILLE (Lat: 34.358478,  Lng: -84.889758),  Route carried "on" structure: Interstate 75,  Year Built: 1970,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 58,100 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 87,150 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 452 ADAIRSVL-PLEASANT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 489.241,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.5m (60.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $821,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,231,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 150108,  Location: 3.7 MI S OF CARTERSVILLE (Lat: 34.115200,  Lng: -84.790308),  Route carried "on" structure: County highway 2946,  Year Built: 1979,  Status: Open,  Structure Length: 15.54m (50.98ft),  Average Daily Traffic: 7,080 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,620 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: PUMPKINVINE CREEK,  Facility Carried by Structure: OLD ALABAMA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 11,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,993,000,  Roadway Improvement Cost: $199,000,  Total Project Cost: $2,989,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 150121,  Location: 3.7 MI N OF CARTERSVILLE (Lat: 34.221269,  Lng: -84.802508),  Route carried "on" structure: City street 919,  Year Built: 1978,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 4,610 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,915 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: PETTIT CREEK,  Facility Carried by Structure: PEEPLES VALLEY RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $496,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $744,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 150124,  Location: 1.5 MI NE OF EMERSON (Lat: 34.142589,  Lng: -84.738939),  Route carried "on" structure: County highway 1665,  Year Built: 1977,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 4,100 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,150 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-75,  Facility Carried by Structure: RED TOP MTN. ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.4m (139.1ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 28.8m (94.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,679,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $2,518,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 315003,  Location: 8.3 MI W OF STATESBORO (Lat: 32.413897,  Lng: -81.915719),  Route carried "on" structure: County highway 142,  Year Built: 1965,  Status: Posted for load,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 3,210 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,815 (year 2031),  Design Load: H 15,  Features Intersected: LOTTS CREEK OVERFLOW,  Facility Carried by Structure: PULASKI ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 9.17m (30.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $527,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 315004,  Location: 8.2 MI W OF STATESBORO (Lat: 32.415078,  Lng: -81.913908),  Route carried "on" structure: County highway 142,  Year Built: 1965,  Status: Posted for load,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 3,210 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,815 (year 2031),  Design Load: H 15,  Features Intersected: LOTTS CREEK,  Facility Carried by Structure: PULASKI ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 11.92m (39.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $703,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,055,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 315005,  Location: 7 MI W OF STATESBORO (Lat: 32.415700,  Lng: -81.912969),  Route carried "on" structure: County highway 142,  Year Built: 1965,  Status: Posted for load,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 3,210 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,815 (year 2031),  Design Load: H 15,  Features Intersected: CROSSWAY BRANCH,  Facility Carried by Structure: PULASKI ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 9.17m (30.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $527,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 430011,  Location: 0.6 MI SE OF PULASKI (Lat: 32.383339,  Lng: -81.951019),  Route carried "on" structure: State highway 46,  Year Built: 1948,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 3,010 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,515 (year 2031),  Design Load: H 15,  Features Intersected: TEN MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.38m (24.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 430026,  Location: 6.3 MI SE OF METTER (Lat: 32.346458,  Lng: -81.970269),  Route carried "on" structure: Interstate 16,  Year Built: 1977,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 18,360 (year 2011),  Truck Traffic: 25%,  Average Future Daily Traffic: 27,540 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TEN MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 177.028,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $193,000
Find on map >>   Show street view

Structure Number: 430027,  Location: 6.3 MI SE OF METTER (Lat: 32.347289,  Lng: -81.970428),  Route carried "on" structure: Interstate 16,  Year Built: 1977,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 18,360 (year 2011),  Truck Traffic: 25%,  Average Future Daily Traffic: 27,540 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TEN MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 177.028,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $193,000
Find on map >>   Show street view

Structure Number: 430028,  Location: 7.5 MI SE OF METTER (Lat: 32.337819,  Lng: -81.952819),  Route carried "on" structure: Interstate 16,  Year Built: 1976,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 18,530 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 27,795 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 49
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 178.637,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $629,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $944,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 430029,  Location: 7.5 MI SE OF METTER (Lat: 32.338589,  Lng: -81.952519),  Route carried "on" structure: Interstate 16,  Year Built: 1976,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 18,530 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 27,795 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 49
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 178.637,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $629,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $944,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 430043,  Location: 5.4 MI SE OF METTER (Lat: 32.353708,  Lng: -81.984478),  Route carried "on" structure: County highway 2242,  Year Built: 1977,  Status: Open,  Structure Length: 9.51m (31.20ft),  Average Daily Traffic: 190 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 285 (year 2031),  Design Load: HS 15,  Features Intersected: I-16 (SR 404),  Facility Carried by Structure: CLAUDE TURNER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 20.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,219,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,829,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 430045,  Location: 7.4 MI NE OF METTER (Lat: 32.423947,  Lng: -81.938289),  Route carried "on" structure: County highway 2766,  Year Built: 1981,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 370 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 555 (year 2031),  Design Load: HS 20,  Features Intersected: LOTTS CREEK,  Facility Carried by Structure: SALEM CHURCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $391,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $586,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 435008,  Location: 4 MI N OF PULASKI (Lat: 32.449608,  Lng: -81.955989),  Route carried "on" structure: County highway 59,  Year Built: 1983,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 130 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 195 (year 2031),  Design Load: HS 15,  Features Intersected: LOTTS CREEK,  Facility Carried by Structure: ST MATTHEWS CH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $742,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $1,114,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 157501,  Location: 3 MI SW OF NICHOLSON (Lat: 34.092050,  Lng: -83.479550),  Route carried "on" structure: County highway 81,  Year Built: 1962,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: LITTLE CURRY CREEK,  Facility Carried by Structure: BROCKTON LOOP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 159002,  Location: 1.5 MI N OF MONTICELLO (Lat: 33.325528,  Lng: -83.691678),  Route carried "on" structure: County highway 773,  Year Built: 1967,  Status: Posted for load,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 650 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 975 (year 2031),  Design Load: H 15,  Features Intersected: PEARSON CREEK,  Facility Carried by Structure: POST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $563,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 159003,  Location: 1.5 MI NW OF MONTICELLO (Lat: 33.321528,  Lng: -83.698569),  Route carried "on" structure: State highway 11,  Year Built: 1991,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,950 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,925 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: PEARSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $109,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $164,000
Find on map >>   Show street view

Structure Number: 150128,  Location: 4.1 MI SE OF EMERSON (Lat: 34.088469,  Lng: -84.699789),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 83,640 (year 2011),  Truck Traffic: 1%,  Features Intersected: I-75,  Facility Carried by Structure: CSX RAILROAD
Minimum Vertical Clearance: 5.96m (19.55ft),  Kilometerpoint: 450.616,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 150129,  Location: 1 MI SE OF EMERSON (Lat: 34.121497,  Lng: -84.740358),  Route carried "under" structure: Ramp Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 70,800 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-75 RAMP NB,  Facility Carried by Structure: CSX RAILROAD
Minimum Vertical Clearance: 7.82m (25.66ft),  Kilometerpoint: 457.054,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 15013,  Location: 0.7 MI NE OF PINELOG (Lat: 34.349139,  Lng: -84.724450),  Route carried "under" structure: County highway 200,  Structure Length: 0. m,  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Features Intersected: CR 200,  Facility Carried by Structure: CSX RR (340710A)
Minimum Vertical Clearance: 2.89m (9.48ft),  Kilometerpoint: 12.875,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 150131,  Location: 1.2 MI SE OF CARTERSVILLE (Lat: 34.153239,  Lng: -84.785258),  Route carried "under" structure: State highway 293,  Structure Length: 0. m,  Average Daily Traffic: 2,950 (year 2011),  Truck Traffic: 7%,  Features Intersected: SR 293,  Facility Carried by Structure: CSX RR (340434A)
Minimum Vertical Clearance: 4.31m (14.14ft),  Kilometerpoint: 4.828,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 430028,  Location: 7.5 MI SE OF METTER (Lat: 32.337819,  Lng: -81.952819),  Route carried "under" structure: County highway 49,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-16 EBL (SR 404),  Facility Carried by Structure: I-16 EBL
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 430029,  Location: 7.5 MI SE OF METTER (Lat: 32.338589,  Lng: -81.952519),  Route carried "under" structure: County highway 49,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-16 WBL (SR 404),  Facility Carried by Structure: I-16 WBL
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 430043,  Location: 5.4 MI SE OF METTER (Lat: 32.353708,  Lng: -81.984478),  Route carried "under" structure: Interstate 16,  Structure Length: 0. m,  Average Daily Traffic: 16,100 (year 1999),  Truck Traffic: 1%,  Features Intersected: FAS 2242 (CR 228),  Facility Carried by Structure: CLAUDE TURNER RD
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 175.419,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Discuss Pulaski, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.