Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Puryear, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 56ft / 16.9mTotal length
  • $1,502,000Total costs
  • 12,229Total average daily traffic
  • 1,156Total average daily truck traffic
  • 20,576Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Puryear
  • No street view available for this location

New bridges in Puryear, TN - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 11940-1949
  • 11950-1959
  • 31960-1969
  • 11980-1989
  • 11990-1999
  • 22000-2009
  • 22010-2019
Average Bridge Daily Traffic in Puryear, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.6%Good
  • 57.1%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Good
  • 57.1%Satisfactory
  • 28.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Good
  • 42.9%Satisfactory
  • 28.6%Fair
  • 14.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.4%Good
  • 84.6%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Very good
  • 33.3%Satisfactory
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 390A3550001,  Location: 2 MI E OF CHESTER CO. (Lat: 36.467789,  Lng: -88.344297),  Route carried "on" structure: County highway 355,  Year Built: 2016,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 130 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 208 (year 2040),  Design Load: HL 93,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.2m (20.3ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 400A0650001,  Location: 9 MI. W. OF SR54 (Lat: 36.397033,  Lng: -88.369167),  Route carried "on" structure: County highway 65,  Year Built: 2004,  Status: Open,  Structure Length: 1.85m (6.07ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2039),  Design Load: HS 20,  Features Intersected: NORTH FORK OBION RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.350,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 400A0670001,  Location: 3 MI. W. OF SR54 (Lat: 36.384639,  Lng: -88.352472),  Route carried "on" structure: County highway 67,  Year Built: 1965,  Status: Posted for load,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 260 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 416 (year 2041),  Design Load: H 15,  Features Intersected: NORTH FORK OBION RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.864,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $78,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $118,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 400A0670003,  Location: 5 MI W. OF SR54 (Lat: 36.394556,  Lng: -88.358361),  Route carried "on" structure: County highway 67,  Year Built: 1962,  Status: Posted for load,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 260 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 416 (year 2041),  Design Load: H 15,  Features Intersected: PHILLIPS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.193,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $78,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $118,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 400A0720001,  Location: 6 MI. W. OF SR54 (Lat: 36.424639,  Lng: -88.381833),  Route carried "on" structure: County highway 72,  Year Built: 1950,  Status: Posted for load,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 50 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 80 (year 2042),  Features Intersected: CLEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.626,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 34.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $268,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $403,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 400A1340001,  Location: 2 MI. E. OF SR54 (Lat: 36.460500,  Lng: -88.316333),  Route carried "on" structure: County highway 134,  Year Built: 2013,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 50 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 80 (year 2039),  Design Load: HL 93,  Features Intersected: EAST FORK CLARKS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 400A1370001,  Location: 2 MI. E. OF SR54 (Lat: 36.449333,  Lng: -88.316556),  Route carried "on" structure: County highway 137,  Year Built: 1995,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 120 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 192 (year 2039),  Design Load: HS 20,  Features Intersected: EAST FORK CLARKS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 400A1400001,  Location: 2 MI. E. OF SR54 (Lat: 36.394472,  Lng: -88.325278),  Route carried "on" structure: County highway 140,  Year Built: 1981,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 70 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 112 (year 2040),  Design Load: H 15,  Features Intersected: ROWE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.023,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 20.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $305,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 400A3930001,  Location: WIMBERLY ROAD (Lat: 36.424639,  Lng: -88.381833),  Route carried "on" structure: County highway 393,  Year Built: 2004,  Status: Open,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 70 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 112 (year 2040),  Features Intersected: TURKEY PEN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.555,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.99m (3.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $146,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $220,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 40S81720005,  Location: 1.7 M W OF SR54 (Lat: 36.444056,  Lng: -88.362417),  Route carried "on" structure: State highway 140,  Year Built: 1960,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 584 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,120 (year 2039),  Design Load: H 15,  Features Intersected: CLEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.712,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 40SR0540025,  Location: 4.5 MILES NORTH OF PARIS (Lat: 36.387639,  Lng: -88.333611),  Route carried "on" structure: US 641,  Year Built: 1937,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 4,912 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 7,600 (year 2039),  Design Load: HS 20,  Features Intersected: ROWE CREEK,  Facility Carried by Structure: FAP 54
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.568,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 71.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 40SR0540027,  Location: 1.1 MILE N.OF PURYEAR (Lat: 36.464528,  Lng: -88.331778),  Route carried "on" structure: US 641,  Year Built: 1937,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 4,666 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 8,432 (year 2039),  Design Load: HS 20,  Features Intersected: MORMON BRANCH,  Facility Carried by Structure: FAP 54
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.066,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $226,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 40SR1400001,  Location: 1.2 MILE EAST OF PURYEAR (Lat: 36.441500,  Lng: -88.311083),  Route carried "on" structure: State highway 140,  Year Built: 1948,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,037 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,776 (year 2039),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.379,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $74,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $112,000 ( Estimate for 2019)
Discuss Puryear, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.