Bridge Statistics for Rainbow City, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 217ft / 66.5mTotal length
  • $32,739,000Total costs
  • 173,832Total average daily traffic
  • 25,298Total average daily truck traffic
  • 226,449Total future (year 2029) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Rainbow City
  • No street view available for this location

New bridges in Rainbow City, AL - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21950-1959
  • 81960-1969
  • 11990-1999
  • 32000-2009
  • 62010-2019
Average Bridge Daily Traffic in Rainbow City, AL
Average Bridge Truck Traffic in Rainbow City, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Excellent
  • 50.0%Very good
  • 16.7%Good
  • 16.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Excellent
  • 16.7%Very good
  • 16.7%Good
  • 16.7%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Excellent
  • 50.0%Very good
  • 16.7%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.5%Excellent
  • 28.6%Very good
  • 19.0%Good
  • 33.3%Satisfactory
  • 9.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 6.7%Excellent
  • 6.7%Very good
  • 46.7%Good
  • 33.3%Satisfactory
  • 6.7%Fair
Find on map >>   Show street view

Structure Number: 2038,  Location: CITY OF TALLADEGA (Lat: 33.438361,  Lng: -86.103072),  Route carried "on" structure: State highway 77,  Year Built: 1939,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 8,843 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,380 (year 2039),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 103.608,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $443,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $487,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5633,  Location: 200' N. OF STEELE STATION (Lat: 33.967956,  Lng: -86.039158),  Route carried "on" structure: County highway 129,  Year Built: 1956,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 10,500 (year 2005),  Truck Traffic: 8%,  Average Future Daily Traffic: 15,015 (year 2034),  Design Load: H 15,  Features Intersected: UT TO BIG WILLS CREEK,  Facility Carried by Structure: SUTTON BRIDGE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $348,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $383,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5634,  Location: @ BROWN DRIVE (Lat: 33.988247,  Lng: -86.046050),  Route carried "on" structure: County highway 129,  Year Built: 1956,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 10,500 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,500 (year 2034),  Design Load: H 20,  Features Intersected: BIG WILLS CREEK RELIEF,  Facility Carried by Structure: SUTTON BRIDGE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 40.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $409,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $450,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7135,  Location: 0.25MINWOFHWY411 (Lat: 33.917814,  Lng: -86.107322),  Route carried "on" structure: County highway 119,  Year Built: 1960,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 868 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 868 (year 2033),  Design Load: H 20,  Features Intersected: DRY CREEK,  Facility Carried by Structure: PLEASENT VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 45.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $504,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $554,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7538,  Location: 1 . 5 MI N ST CLAIRCO LN (Lat: 33.955278,  Lng: -86.142222),  Route carried "on" structure: Interstate 59,  Year Built: 1962,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 12,646 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 17,704 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 284.759,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $854,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $939,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7539,  Location: 1 . 5 MI N ST CLAIR CO LN (Lat: 33.955375,  Lng: -86.140550),  Route carried "on" structure: Interstate 59,  Year Built: 1962,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 12,646 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 17,704 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 284.759,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $756,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $832,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 754,  Location: 1.9 MI NO ST CLAIR CO LN (Lat: 33.958453,  Lng: -86.136911),  Route carried "on" structure: Interstate 59,  Year Built: 1962,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 11,357 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 15,900 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 285.322,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $990,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $1,089,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7541,  Location: 1.9 MI NO ST CLAIR CO LN (Lat: 33.957919,  Lng: -86.135778),  Route carried "on" structure: Interstate 59,  Year Built: 1962,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 11,357 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 15,900 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 285.322,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,043,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,147,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7542,  Location: 2.5 MI NO ST CLAIR CO LN (Lat: 33.962858,  Lng: -86.129775),  Route carried "on" structure: Interstate 59,  Year Built: 1962,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 11,358 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 15,901 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 286.386,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $764,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $840,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7543,  Location: 2 . 5 MI N ST CLAIR CO LN (Lat: 33.962253,  Lng: -86.129444),  Route carried "on" structure: Interstate 59,  Year Built: 1962,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 11,358 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 15,901 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 286.386,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $917,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,009,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9125,  Location: 0 3 MI SE MCKNTYRE CHURCH (Lat: 33.858533,  Lng: -86.095353),  Route carried "on" structure: ServiceCounty highway 64,  Year Built: 1966,  Status: Posted for load,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 500 (year 1999),  Truck Traffic: 15%,  Average Future Daily Traffic: 937 (year 2029),  Design Load: H 15,  Features Intersected: PERMETER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Underwater Inspection Date: Febuary 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $1,021,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,123,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16875,  Location: 1.4 MI SW OF PLEASANT VLY (Lat: 33.967161,  Lng: -86.130158),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 25 (year 2003),  Average Future Daily Traffic: 47 (year 2035),  Design Load: H 15,  Features Intersected: ROOK CREEK,  Facility Carried by Structure: WESSON LAKE RD.
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.7m (18.7ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $268,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $295,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17494,  Location: AL 77 OVER HORTON CREEK (Lat: 33.980000,  Lng: -86.066667),  Route carried "on" structure: State highway 77,  Year Built: 2013,  Status: Open,  Structure Length: 2.06m (6.76ft),  Average Daily Traffic: 17,512 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,517 (year 2040),  Design Load: HS 20,  Features Intersected: HORTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 169.800,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.8m (84.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.0m (16.4ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 85.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.82m (9.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,418,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $1,560,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18143,  Location: BLACK CREEK PARKWAY (Lat: 33.989250,  Lng: -86.039444),  Route carried "on" structure: City street ,  Year Built: 2011,  Status: Open,  Structure Length: 12.01m (39.40ft),  Average Daily Traffic: 10,000 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,500 (year 2041),  Design Load: HS 20,  Features Intersected: BIG WILLS CREEK,  Facility Carried by Structure: BLACK CREEK PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.0m (98.4ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 79.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.86m (42.19ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: May 2021,  Underwater Inspection Date: December 2021,  Bridge Improvement Cost: $4,498,000,  Roadway Improvement Cost: $450,000,  Total Project Cost: $4,948,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18212,  Location: .1 MI JCT 411 (Lat: 33.903986,  Lng: -86.110814),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 7.44m (24.41ft),  Average Daily Traffic: 600 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,000 (year 2040),  Design Load: HS 20,  Features Intersected: DRY CREEK,  Facility Carried by Structure: CANOE CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 8.46m (27.76ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: December 2020,  Underwater Inspection Date: December 2021,  Bridge Improvement Cost: $2,437,000,  Roadway Improvement Cost: $244,000,  Total Project Cost: $2,681,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18213,  Location: ST. CLAIR/ETOWAH CO.LN. (Lat: 33.902986,  Lng: -86.110564),  Route carried "on" structure: US 411,  Year Built: 2007,  Status: Open,  Structure Length: 10.80m (35.43ft),  Average Daily Traffic: 3,400 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,508 (year 2041),  Design Load: HS 20,  Features Intersected: BIG CANOE CREEK
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 333.572,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.0m (88.6ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 68.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.70m (38.39ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $3,689,000,  Roadway Improvement Cost: $369,000,  Total Project Cost: $4,058,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18554,  Location: BLACK CREEK PARKWAY (Lat: 33.989258,  Lng: -86.040000),  Route carried "on" structure: City street ,  Year Built: 2011,  Status: Open,  Structure Length: 12.01m (39.40ft),  Average Daily Traffic: 10,500 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,500 (year 2041),  Design Load: HS 20,  Features Intersected: BIG WILLS CREEK,  Facility Carried by Structure: BLACK CREEK PKY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.0m (98.4ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 79.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.86m (42.19ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: May 2021,  Underwater Inspection Date: December 2021,  Bridge Improvement Cost: $3,881,000,  Roadway Improvement Cost: $388,000,  Total Project Cost: $4,269,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18555,  Location: BLACK CREEK PARKWAY (Lat: 33.985742,  Lng: -86.042903),  Route carried "on" structure: City street ,  Year Built: 2011,  Status: Open,  Structure Length: 2.12m (6.96ft),  Average Daily Traffic: 10,500 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,500 (year 2041),  Design Load: HS 20,  Features Intersected: BIG WILLS CREEK,  Facility Carried by Structure: BLACK CREEK PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,301,000,  Roadway Improvement Cost: $330,000,  Total Project Cost: $3,631,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19315,  Location: AL 77 AND DRY CREEK (Lat: 33.964536,  Lng: -86.046036),  Route carried "on" structure: State highway 77,  Year Built: 2004,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 17,512 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,517 (year 2039),  Design Load: HS 20,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 167.109,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.94m (6.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,099,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,209,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2038,  Location: PEERMAN LAKE RD> (Lat: 33.952139,  Lng: -86.100472),  Route carried "on" structure: City street ,  Year Built: 2010,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 350 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 400 (year 2042),  Design Load: HS 20,  Features Intersected: CITY STREET * WATERWAY,  Facility Carried by Structure: CITY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $389,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $428,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20645,  Location: 0.7 MI.W\PLEASANT VALLEY (Lat: 33.939089,  Lng: -86.131331),  Route carried "on" structure: County highway 124,  Year Built: 2014,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,500 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,250 (year 2034),  Design Load: HS 20,  Features Intersected: ROOK CREEK,  Facility Carried by Structure: STEELE STATION
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Operating Rating: 77.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $734,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $807,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Rainbow City, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.