Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Reform, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 276ft / 84.0mTotal length
  • $30,413,000Total costs
  • 45,089Total average daily traffic
  • 5,898Total average daily truck traffic
  • 45,909Total future (year 2012) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Reform
  • No street view available for this location

New bridges in Reform, AL - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 21930-1939
  • 21940-1949
  • 21950-1959
  • 21960-1969
  • 21970-1979
  • 101980-1989
  • 12000-2009
Reconstructed bridges in Reform, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Reform, AL
Average Bridge Truck Traffic in Reform, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 26.7%Very good
  • 46.7%Good
  • 13.3%Satisfactory
  • 13.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 26.7%Very good
  • 26.7%Good
  • 33.3%Satisfactory
  • 6.7%Fair
  • 6.7%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 26.7%Very good
  • 26.7%Good
  • 33.3%Satisfactory
  • 6.7%Fair
  • 6.7%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.3%Very good
  • 52.2%Good
  • 39.1%Satisfactory
  • 4.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 55.6%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 812,  Location: 0.1 MI NORTH CO RT #28 (Lat: 33.388333,  Lng: -88.058333),  Route carried "on" structure: County highway 68,  Year Built: 1930,  Status: Closed,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 50 (year 1998),  Average Future Daily Traffic: 50 (year 2012),  Features Intersected: SOUTHRAIL RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Railroad,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Critical,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: November 1992,  Other Special Inspection Date: November 1992,  Bridge Improvement Cost: $667,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $734,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1935,  Location: 4.3 MI S JCT US 82 (Lat: 33.325217,  Lng: -88.041367),  Route carried "on" structure: State highway 17,  Year Built: 1939,  Status: Open,  Structure Length: 1.39m (4.56ft),  Average Daily Traffic: 2,587 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,340 (year 2040),  Design Load: H 15,  Features Intersected: Jennings Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 330.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.06m (6.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $381,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $419,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2517,  Location: 1.5 MI N REFORM (Lat: 33.396017,  Lng: -88.007867),  Route carried "on" structure: State highway 17,  Year Built: 1929,  Year Reconstructed: 1941,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,274 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,515 (year 2040),  Design Load: H 15,  Features Intersected: Branch of Lubbub Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 339.815,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $422,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $464,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2518,  Location: 1.6 MI N OF REFORM (Lat: 33.396433,  Lng: -88.007517),  Route carried "on" structure: State highway 17,  Year Built: 1929,  Year Reconstructed: 1941,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,476 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,515 (year 2040),  Design Load: H 15,  Features Intersected: Trib. of Lubbub Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 339.873,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $342,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $376,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2519,  Location: 3.8 MI N OF REFORM (Lat: 33.428200,  Lng: -88.009050),  Route carried "on" structure: State highway 17,  Year Built: 1929,  Year Reconstructed: 1941,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,618 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,960 (year 2040),  Design Load: H 15,  Features Intersected: LineBarger Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 343.490,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $269,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $296,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2562,  Location: 4.6 MI N REFORM (Lat: 33.438150,  Lng: -88.005767),  Route carried "on" structure: State highway 17,  Year Built: 1941,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,618 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,535 (year 2040),  Design Load: H 15,  Features Intersected: Branch of Buttahatchee
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 344.664,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 34.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.05m (6.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $378,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $416,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2858,  Location: 1.0 MI SOUTH US 82 (Lat: 33.342672,  Lng: -87.960778),  Route carried "on" structure: County highway 95,  Year Built: 1945,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 10 (year 2014),  Average Future Daily Traffic: 10 (year 2034),  Design Load: H 10,  Features Intersected: BEAR CREEK BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 17.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $194,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 5204,  Location: 3.3 MI NORTH OF US #82 (Lat: 33.435769,  Lng: -88.057981),  Route carried "on" structure: County highway 27,  Year Built: 1955,  Status: Posted for load,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 200 (year 1998),  Truck Traffic: 5%,  Average Future Daily Traffic: 300 (year 2034),  Design Load: H 15,  Features Intersected: COALFIRE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $1,528,000,  Roadway Improvement Cost: $153,000,  Total Project Cost: $1,681,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 593,  Location: 0.9 MI EAST OF JCT US 82 (Lat: 33.384417,  Lng: -87.991897),  Route carried "on" structure: County highway 49,  Year Built: 1957,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 500 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 500 (year 2034),  Design Load: HS 20,  Features Intersected: GOOSE CREEK BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $445,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $490,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8665,  Location: 3.8 MI EAST OF JCT SR 17 (Lat: 33.442111,  Lng: -87.972442),  Route carried "on" structure: County highway 3,  Year Built: 1965,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 300 (year 1998),  Truck Traffic: 5%,  Average Future Daily Traffic: 350 (year 2028),  Design Load: HS 20,  Features Intersected: BEAVER CREEK
Minimum Vertical Clearance: 99.00m (324.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.19m (10.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $572,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $629,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 979,  Location: 0.5 MI EAST OF CO RT #27 (Lat: 33.448908,  Lng: -88.052817),  Route carried "on" structure: County highway 146,  Year Built: 1968,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 200 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 200 (year 2028),  Design Load: HS 20,  Features Intersected: BOARD TREE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 79.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $382,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $420,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11694,  Location: 0.2 MI EAST OF JCT SR #17 (Lat: 33.435278,  Lng: -88.005278),  Route carried "on" structure: County highway 133,  Year Built: 1976,  Year Reconstructed: 2000,  Status: Posted for load,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 75 (year 1998),  Average Future Daily Traffic: 100 (year 2034),  Design Load: H 15,  Features Intersected: LITTLE LUBBUB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 17.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.12m (10.24ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $470,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $517,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11843,  Location: 0.6 MI E OF JCT SR 17 (Lat: 33.328131,  Lng: -88.024039),  Route carried "on" structure: County highway 77,  Year Built: 1977,  Status: Open,  Structure Length: 12.05m (39.53ft),  Average Daily Traffic: 300 (year 1998),  Truck Traffic: 4%,  Average Future Daily Traffic: 350 (year 2028),  Design Load: H 15,  Features Intersected: LUBBUB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 20,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.90m (42.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $2,388,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $2,627,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12348,  Location: 1.0 MI E OF SR RT 17 (Lat: 33.408594,  Lng: -87.996178),  Route carried "on" structure: County highway 3,  Year Built: 1980,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 300 (year 1998),  Truck Traffic: 5%,  Average Future Daily Traffic: 325 (year 2028),  Design Load: H 20,  Features Intersected: KYLES BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $653,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $718,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12358,  Location: Coal Fire (Lat: 33.404700,  Lng: -88.095014),  Route carried "on" structure: US 82,  Year Built: 1980,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 5,981 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 3,962 (year 2041),  Design Load: HS 20,  Features Intersected: Coal Fire Creek Relief,  Facility Carried by Structure: AL-6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.709,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.29m (23.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,149,000,  Roadway Improvement Cost: $215,000,  Total Project Cost: $2,364,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12359,  Location: Coal Fire (Lat: 33.404767,  Lng: -88.093000),  Route carried "on" structure: US 82,  Year Built: 1980,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 5,981 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 3,962 (year 2041),  Design Load: HS 20,  Features Intersected: Coal Fire Creek Relief,  Facility Carried by Structure: AL-6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.709,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 67.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.29m (23.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,149,000,  Roadway Improvement Cost: $215,000,  Total Project Cost: $2,364,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1236,  Location: 1.1 MI W of Reform (Lat: 33.387500,  Lng: -88.033278),  Route carried "on" structure: US 82,  Year Built: 1980,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 7,158 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 8,688 (year 2033),  Design Load: HS 20,  Features Intersected: Branch,  Facility Carried by Structure: AL-6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.720,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,310,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $1,441,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12556,  Location: Reform (Lat: 33.376267,  Lng: -88.018683),  Route carried "on" structure: State highway 17,  Year Built: 1981,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 3,160 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,075 (year 2040),  Design Load: HS 20,  Features Intersected: Town Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 337.161,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 65.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,914,000,  Roadway Improvement Cost: $191,000,  Total Project Cost: $2,105,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12818,  Location: 1.8 MI NORTH OF SR 86 (Lat: 33.299378,  Lng: -88.008600),  Route carried "on" structure: County highway 80,  Year Built: 1982,  Status: Posted for load,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 50 (year 1998),  Average Future Daily Traffic: 100 (year 2034),  Design Load: HS 15,  Features Intersected: LITTLE LUBBUB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 16.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $344,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14272,  Location: 0.7 MI EAST OF CO RT #3 (Lat: 33.400000,  Lng: -87.976342),  Route carried "on" structure: County highway 134,  Year Built: 1987,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 50 (year 1998),  Average Future Daily Traffic: 75 (year 2028),  Design Load: HS 20,  Features Intersected: LUBBUB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 56.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $912,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,003,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 14273,  Location: 0.9 MI EAST OF CO RT #3 (Lat: 33.411867,  Lng: -87.974444),  Route carried "on" structure: County highway 134,  Year Built: 1987,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 50 (year 1998),  Average Future Daily Traffic: 75 (year 2028),  Design Load: HS 20,  Features Intersected: LUBBUB SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $912,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,003,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 14509,  Location: 1.0 MI E of Reform (Lat: 33.374092,  Lng: -88.003867),  Route carried "on" structure: US 82,  Year Built: 1988,  Status: Open,  Structure Length: 13.78m (45.21ft),  Average Daily Traffic: 10,041 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 10,772 (year 2041),  Design Load: HS 20,  Features Intersected: Lubbub Creek,  Facility Carried by Structure: AL-6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.760,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 23.3m (76.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.58m (47.83ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $7,598,000,  Roadway Improvement Cost: $760,000,  Total Project Cost: $8,358,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14637,  Location: 0.8 MI E OF CO RT #3 (Lat: 33.412778,  Lng: -87.974981),  Route carried "on" structure: County highway 134,  Year Built: 1988,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 50 (year 1998),  Average Future Daily Traffic: 75 (year 2028),  Design Load: HS 20,  Features Intersected: RELIEF OF LUBBUB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $706,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $777,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19528,  Location: 0.2 MILES EAST OF CR#49 (Lat: 33.383425,  Lng: -87.990144),  Route carried "on" structure: County highway 260,  Year Built: 2005,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 60 (year 2005),  Average Future Daily Traffic: 75 (year 2029),  Design Load: HS 20,  Features Intersected: GOOSE CREEK,  Facility Carried by Structure: LANGDON WOODS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.31m (10.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $612,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $673,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Discuss Reform, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.