Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ritzville, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 28Number of bridges
  • 276ft / 83.9mTotal length
  • $44,813,000Total costs
  • 139,380Total average daily traffic
  • 35,175Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ritzville
  • No street view available for this location

New bridges in Ritzville, WA - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11930-1939
  • 121950-1959
  • 21980-1989
  • 111990-1999
  • 12000-2009
Average Bridge Daily Traffic in Ritzville, WA
Average Bridge Truck Traffic in Ritzville, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 56.3%Good
  • 37.5%Satisfactory
  • 6.3%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 43.8%Good
  • 25.0%Satisfactory
  • 12.5%Fair
  • 6.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 50.0%Good
  • 31.3%Satisfactory
  • 6.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 16.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 5761A,  Location: 1.5 E JCT US 395 (Lat: 47.116417,  Lng: -118.365944),  Route carried "on" structure: Interstate 90,  Year Built: 1958,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 7,350 (year 2019),  Truck Traffic: 25%,  Average Future Daily Traffic: 8,849 (year 2039),  Design Load: HS 20,  Features Intersected: SR 261
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 357.194,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.15m (16.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,420,000,  Roadway Improvement Cost: $284,000,  Total Project Cost: $2,839,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 5761B,  Location: 1.5 E JCT US 395 (Lat: 47.116750,  Lng: -118.365944),  Route carried "on" structure: Interstate 90,  Year Built: 1952,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 7,350 (year 2019),  Truck Traffic: 25%,  Average Future Daily Traffic: 8,849 (year 2039),  Design Load: HS 15,  Features Intersected: SR 261
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 357.194,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.15m (16.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,420,000,  Roadway Improvement Cost: $284,000,  Total Project Cost: $2,839,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 5761C,  Location: 0.9 E JCT SR 261 (Lat: 47.125556,  Lng: -118.352194),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Open,  Structure Length: 10.39m (34.09ft),  Average Daily Traffic: 272 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 364 (year 2036),  Design Load: HS 20,  Features Intersected: I-90,  Facility Carried by Structure: WELLSANDT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.593,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.39m (34.09ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $2,250,000,  Roadway Improvement Cost: $450,000,  Total Project Cost: $4,501,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 5783A,  Location: 4.4 E JCT SR 261 (Lat: 47.162414,  Lng: -118.300675),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Open,  Structure Length: 10.39m (34.09ft),  Average Daily Traffic: 169 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 203 (year 2039),  Design Load: HS 20,  Features Intersected: I-90,  Facility Carried by Structure: SCHOESSLER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.39m (34.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,046,000,  Roadway Improvement Cost: $409,000,  Total Project Cost: $4,092,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 5789A,  Location: 13.6 N JCT SR 21 (Lat: 47.110944,  Lng: -118.395472),  Route carried "on" structure: Ramp US 395,  Year Built: 1958,  Status: Open,  Structure Length: 9.39m (30.81ft),  Average Daily Traffic: 1,360 (year 2016),  Truck Traffic: 32%,  Average Future Daily Traffic: 1,700 (year 2038),  Design Load: HS 20,  Features Intersected: I-90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Serious,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.39m (30.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,587,000,  Roadway Improvement Cost: $517,000,  Total Project Cost: $5,174,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 12782A,  Location: 12.9 E JCT SR 21 (Lat: 47.110667,  Lng: -118.400722),  Route carried "on" structure: Ramp Interstate 90,  Year Built: 1985,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 314 (year 2019),  Truck Traffic: 23%,  Average Future Daily Traffic: 378 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: BURLINGTON-NORTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $1,008,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $2,016,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14489C,  Location: 10.9 N JCT SR 21 (Lat: 47.074861,  Lng: -118.410667),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 7.86m (25.79ft),  Average Daily Traffic: 18 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 21 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: US 395,  Facility Carried by Structure: URQUHART RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.7m (127.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.86m (25.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $1,548,000,  Roadway Improvement Cost: $310,000,  Total Project Cost: $3,096,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14601A,  Location: 13.0 N JCT SR 21 (Lat: 47.107000,  Lng: -118.400333),  Route carried "on" structure: US 395,  Year Built: 1996,  Status: Open,  Structure Length: 7.83m (25.69ft),  Average Daily Traffic: 4,082 (year 2019),  Truck Traffic: 27%,  Average Future Daily Traffic: 4,914 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: N-N RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 153.660,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.83m (25.69ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $2,159,000,  Roadway Improvement Cost: $432,000,  Total Project Cost: $4,318,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14601B,  Location: 13.0 N JCT SR 21 (Lat: 47.107472,  Lng: -118.399861),  Route carried "on" structure: US 395,  Year Built: 1996,  Status: Open,  Structure Length: 7.83m (25.69ft),  Average Daily Traffic: 4,082 (year 2019),  Truck Traffic: 27%,  Average Future Daily Traffic: 4,914 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: N-N RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 153.708,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.83m (25.69ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $2,056,000,  Roadway Improvement Cost: $411,000,  Total Project Cost: $4,112,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14601D,  Location: 13.6 E JCT SR 21 (Lat: 47.111500,  Lng: -118.388889),  Route carried "on" structure: Interstate 90,  Year Built: 1996,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 5,552 (year 2019),  Truck Traffic: 22%,  Average Future Daily Traffic: 6,684 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: US 395 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 355.311,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.8m (133.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.24m (13.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,112,000,  Roadway Improvement Cost: $222,000,  Total Project Cost: $2,224,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14601E,  Location: 13.6 E JCT SR 21 (Lat: 47.111167,  Lng: -118.389417),  Route carried "on" structure: Interstate 90,  Year Built: 1995,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 5,552 (year 2019),  Truck Traffic: 22%,  Average Future Daily Traffic: 6,684 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: US 395 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 355.295,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.5m (132.9ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.24m (13.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,557,000,  Roadway Improvement Cost: $311,000,  Total Project Cost: $3,114,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200062,  Location: 13.1 E JCT SR 21 (Lat: 47.111028,  Lng: -118.409056),  Route carried "on" structure: Interstate 90,  Year Built: 1959,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 11,657 (year 2019),  Truck Traffic: 22%,  Average Future Daily Traffic: 14,035 (year 2039),  Features Intersected: PAHA COULEE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 353.798,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $581,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 8168,  Location: 00.24 MI N DANEKAS RD (Lat: 47.140325,  Lng: -118.365722),  Route carried "on" structure: ServiceCounty highway 85782,  Year Built: 1900,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 80 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 100 (year 2039),  Features Intersected: INTERMITTENT STREAM,  Facility Carried by Structure: BAUMAN RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 21.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $502,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,003,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83748,  Location: 00.20 MI W SR 395 (Lat: 47.103356,  Lng: -118.412194),  Route carried "on" structure: County highway 74512,  Year Built: 1995,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 71 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 81 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: DRY WASH,  Facility Carried by Structure: HEINEMAN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $532,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,064,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 854,  Location: 0.01 SE ELM AVE (Lat: 47.130625,  Lng: -118.385428),  Route carried "on" structure: City street 86821,  Year Built: 1930,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 846 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,053 (year 2039),  Features Intersected: PAHA DRAINAGE DITCH,  Facility Carried by Structure: DIVISION STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $370,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $739,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 85772,  Location: 0.02 SE CHERRY AVE (Lat: 47.131825,  Lng: -118.383322),  Route carried "on" structure: City street 1090,  Year Built: 1987,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 95 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 120 (year 2039),  Design Load: HS 20,  Features Intersected: PAHA DRAINAGE DITCH,  Facility Carried by Structure: CHELAN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $790,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $1,581,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 86548,  Location: 02.27 MI N ROSENOFF (Lat: 47.165717,  Lng: -118.451878),  Route carried "on" structure: County highway 75564,  Year Built: 2000,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 15 (year 2018),  Average Future Daily Traffic: 19 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: DRY WASH,  Facility Carried by Structure: BAUER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $760,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $1,520,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5761A,  Location: 26.9 N JCT SR 26 (Lat: 47.116417,  Lng: -118.365944),  Route carried "under" structure: State highway 261,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 5,942 (year 2019),  Truck Traffic: 37%,  Features Intersected: SR 261,  Facility Carried by Structure: I-90
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 101.067,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 5761B,  Location: 26.9 N JCT SR 26 (Lat: 47.116750,  Lng: -118.365944),  Route carried "under" structure: State highway 261,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 5,942 (year 2019),  Truck Traffic: 37%,  Features Intersected: SR 261,  Facility Carried by Structure: I-90
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 101.115,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 5761C,  Location: 0.9 E JCT SR 261 (Lat: 47.125556,  Lng: -118.352194),  Route carried "under" structure: Interstate 90,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 19,492 (year 2019),  Truck Traffic: 25%,  Features Intersected: I-90,  Facility Carried by Structure: WELLSANDT RD
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 358.642,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 5783A,  Location: 4.4 E JCT SR 261 (Lat: 47.162414,  Lng: -118.300675),  Route carried "under" structure: Interstate 90,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 19,238 (year 2019),  Truck Traffic: 25%,  Features Intersected: I-90,  Facility Carried by Structure: SCHOESSLER RD
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 364.388,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 5789A,  Location: 13.4 E JCT SR 21 (Lat: 47.110944,  Lng: -118.395472),  Route carried "under" structure: Interstate 90,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 11,103 (year 2019),  Truck Traffic: 22%,  Features Intersected: I-90,  Facility Carried by Structure: US 395 RAMP
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 354.844,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 6031A,  Location: 13.4 E JCT SR 21 (Lat: 47.111278,  Lng: -118.399417),  Route carried "under" structure: Interstate 90,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 11,103 (year 2019),  Truck Traffic: 22%,  Features Intersected: I-90,  Facility Carried by Structure: NP RY
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 354.506,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 14489C,  Location: 10.9 N JCT SR 21 (Lat: 47.074861,  Lng: -118.410667),  Route carried "under" structure: US 395,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 8,725 (year 2019),  Truck Traffic: 27%,  Features Intersected: US 395,  Facility Carried by Structure: URQUHART RD
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 149.766,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 14601A,  Location: 13.0 N JCT SR 21 (Lat: 47.107000,  Lng: -118.400333),  Route carried "under" structure: Ramp US 395,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 403 (year 2019),  Truck Traffic: 25%,  Features Intersected: N-N RAMP
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 0.982,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 14601B,  Location: 13.0 N JCT SR 21 (Lat: 47.107472,  Lng: -118.399861),  Route carried "under" structure: Ramp US 395,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 403 (year 2019),  Truck Traffic: 25%,  Features Intersected: N-N RAMP
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 1.046,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 14601D,  Location: 13.4 E JCT SR 21 (Lat: 47.111500,  Lng: -118.388889),  Route carried "under" structure: Ramp Interstate 90,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 4,082 (year 2019),  Truck Traffic: 27%,  Features Intersected: US 395 SB
Minimum Vertical Clearance: 6.12m (20.08ft),  Kilometerpoint: 154.706,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.8m (133.9ft)

Find on map >>   Show street view

Structure Number: 14601E,  Location: 13.4 E JCT SR 21 (Lat: 47.111167,  Lng: -118.389417),  Route carried "under" structure: Ramp US 90,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 4,082 (year 2019),  Truck Traffic: 27%,  Features Intersected: US 395 SB
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 154.658,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Discuss Ritzville, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.