Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Riverdale, Virginia (VA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 495ft / 151mTotal length
  • $5,415,000Total costs
  • 32,969Total average daily traffic
  • 4,033Total average daily truck traffic
  • 43,515Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Riverdale
  • No street view available for this location

New bridges in Riverdale, VA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11930-1939
  • 31970-1979
  • 11990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Riverdale, VA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 57.1%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 28.6%Good
  • 57.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 57.1%Good
  • 42.9%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Good
  • 40.0%Satisfactory
  • 40.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: 9148,  Location: 0.84-Rt 742/1.06-Rt 658 (Lat: 36.676644,  Lng: -78.826803),  Route carried "on" structure: US 58,  Year Built: 1929,  Status: Open,  Structure Length: 2.97m (9.74ft),  Average Daily Traffic: 2,836 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,972 (year 2040),  Features Intersected: Grassy Creek,  Facility Carried by Structure: Bill Tuck Highway
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 531.713,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.9m (32.5ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,101,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,652,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9149,  Location: 0.75-Rt 360/0.25-Rt 742 (Lat: 36.689708,  Lng: -78.873817),  Route carried "on" structure: US 58,  Year Built: 1929,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 2,836 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,972 (year 2040),  Features Intersected: Perrin's Creek,  Facility Carried by Structure: Bill Tuck Hwy EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 527.300,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,276,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,914,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 915,  Location: 0.50-Rt. 704/0.90-Rt. 931 (Lat: 36.680078,  Lng: -78.914494),  Route carried "on" structure: US 58,  Year Built: 1933,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 3,883 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 5,438 (year 2040),  Features Intersected: Lawson Creek,  Facility Carried by Structure: Philpott Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 523.406,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,232,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $1,849,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9169,  Location: 1.80 TO 658 - 0.85 TO 742 (Lat: 36.676708,  Lng: -78.826431),  Route carried "on" structure: US 58,  Year Built: 1974,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 2,836 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,972 (year 2040),  Features Intersected: Grassy Creek,  Facility Carried by Structure: Bill Tuck Highway
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 531.731,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 917,  Location: 0.25 TO 742 - 0.74 TO 360 (Lat: 36.689906,  Lng: -78.873658),  Route carried "on" structure: US 58,  Year Built: 1974,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 2,836 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,972 (year 2040),  Features Intersected: Perrin's Creek,  Facility Carried by Structure: Bill Tuck Highway
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 527.327,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 9204,  Location: 0.02 TO 904 - 0.60 TO 830 (Lat: 36.662800,  Lng: -78.899342),  Route carried "on" structure: US 501,  Year Built: 1993,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 4,955 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 5,450 (year 2040),  Features Intersected: Stokes Creek,  Facility Carried by Structure: Huell Matthews Hy
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.783,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 9334,  Location: 1.80 to 602-2.30 to 658 (Lat: 36.627081,  Lng: -78.825442),  Route carried "on" structure: County highway 741,  Year Built: 1974,  Status: Open,  Structure Length: 4.84m (15.88ft),  Average Daily Traffic: 188 (year 2020),  Average Future Daily Traffic: 207 (year 2040),  Features Intersected: Hyco River,  Facility Carried by Structure: Lowery Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.365,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.1m (49.5ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 26081,  Location: 0.00-RT221; 0.45-RT888 (Lat: 37.200750,  Lng: -80.033694),  Route carried "on" structure: County highway 688,  Year Built: 2013,  Status: Open,  Structure Length: 2.72m (8.92ft),  Average Daily Traffic: 2,973 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,056 (year 2040),  Design Load: HL 93,  Features Intersected: BACK CREEK,  Facility Carried by Structure: COTTON HILL ROAD
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.6m (44.6ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 69.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 26678,  Location: 0000SCL SOBO/0000 HAL CL (Lat: 36.691139,  Lng: -78.887269),  Route carried "on" structure: US 360,  Year Built: 2005,  Status: Open,  Structure Length: 65.33m (214.34ft),  Average Daily Traffic: 4,813 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 6,738 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: NS Railway & Dan River,  Facility Carried by Structure: John Randolph BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.300,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 58.0m (190.3ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: March 2017,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 26679,  Location: 0.00-So Bost/0.00-Halifax (Lat: 36.691119,  Lng: -78.887447),  Route carried "on" structure: US 360,  Year Built: 2006,  Status: Open,  Structure Length: 65.33m (214.34ft),  Average Daily Traffic: 4,813 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 6,738 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: NS Rwy & Dan River,  Facility Carried by Structure: John Randolph Blvd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 58.0m (190.3ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: March 2017,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Discuss Riverdale, Virginia (VA) on our hugely popular Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.