Bridge Statistics for Riverton, Kansas (KS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 29Number of bridges
  • 705ft / 215mTotal length
  • $3,098,000Total costs
  • 36,349Total average daily traffic
  • 3,686Total average daily truck traffic
  • 48,006Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Riverton
  • No street view available for this location

New bridges in Riverton, KS - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 11920-1929
  • 21930-1939
  • 31940-1949
  • 11950-1959
  • 51960-1969
  • 11970-1979
  • 51980-1989
  • 11990-1999
  • 62000-2009
  • 22010-2019
Average Bridge Daily Traffic in Riverton, KS
Average Bridge Truck Traffic in Riverton, KS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 30.0%Good
  • 25.0%Satisfactory
  • 10.0%Fair
  • 10.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 35.0%Very good
  • 35.0%Good
  • 20.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 40.0%Very good
  • 25.0%Good
  • 15.0%Satisfactory
  • 15.0%Fair
  • 5.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 13.8%Very good
  • 34.5%Good
  • 44.8%Satisfactory
  • 6.9%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: 3046,  Location: 1.5W 0.3S OF MUSCOTAH (Lat: 39.546706,  Lng: -95.552811),  Route carried "on" structure: County highway 1592,  Year Built: 1917,  Status: Posted for load,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 62 (year 2007),  Average Future Daily Traffic: 63 (year 2040),  Features Intersected: STREAM
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 1.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.7m (15.4ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 24.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $305,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 4076,  Location: 9.3N 1.8W OF KIOWA (Lat: 37.156611,  Lng: -98.526500),  Route carried "on" structure: County highway 1717,  Year Built: 1965,  Status: Posted for load,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 78 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 100 (year 2041),  Design Load: H 15,  Features Intersected: TRIB. TO MEDICINE RIVER
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 26.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4077,  Location: 7.0N OF KIOWA (Lat: 37.123825,  Lng: -98.493833),  Route carried "on" structure: County highway 1717,  Year Built: 1968,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 78 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 85 (year 2041),  Features Intersected: TRIB. TO MEDICINE RIVER,  Facility Carried by Structure: Gerlane Road
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 4078,  Location: 2.0N 3.0W OF HAZELTON (Lat: 37.123111,  Lng: -98.457056),  Route carried "on" structure: County highway 1717,  Year Built: 1968,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 78 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 70 (year 2041),  Design Load: HS 20,  Features Intersected: LONE TREE CANYON,  Facility Carried by Structure: Gerlane Road
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4079,  Location: 2.oN 2.0W OF HAZELTON (Lat: 37.123167,  Lng: -98.438944),  Route carried "on" structure: County highway 1717,  Year Built: 1965,  Status: Posted for load,  Structure Length: 1.09m (3.58ft),  Average Daily Traffic: 78 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 70 (year 2041),  Design Load: H 20,  Features Intersected: TRIB. LONE TREE CANYON,  Facility Carried by Structure: Gerlane Road
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.5m (11.5ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4082,  Location: 3.4W 1.5S OF ISABEL (Lat: 37.447222,  Lng: -98.617278),  Route carried "on" structure: County highway 2131,  Year Built: 1981,  Status: Posted for load,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 60 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 50 (year 2041),  Design Load: HS 20,  Features Intersected: AMBER CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 1101,  Location: 0.8S 1.7E OF NEUTRAL (Lat: 37.090556,  Lng: -94.766667),  Route carried "on" structure: County highway 101,  Year Built: 1972,  Status: Posted for load,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 652 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 652 (year 2041),  Features Intersected: BRUSH CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 30.135,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 22.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.69m (12.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $212,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $317,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 110105,  Location: 0.8S 2.8E OF NEUTRAL (Lat: 37.090556,  Lng: -94.745000),  Route carried "on" structure: County highway 101,  Year Built: 2016,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 600 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,035 (year 2041),  Design Load: HS 20,  Features Intersected: TRIB. TO BRUSH CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 110185,  Location: 0.75 SOUTH OF RIVERTON (Lat: 37.061667,  Lng: -94.706111),  Route carried "on" structure: County highway 107,  Year Built: 1987,  Status: Posted for load,  Structure Length: 32.43m (106.40ft),  Average Daily Traffic: 1,268 (year 2004),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,268 (year 2041),  Design Load: HS 20,  Features Intersected: SPRING RIVER
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 4.829,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 33.8m (110.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Good,  Operating Rating: 51.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Other Special Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11025,  Location: 2.5S 0.1W OF CRESTLINE (Lat: 37.133333,  Lng: -94.706111),  Route carried "on" structure: County highway 110,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,439 (year 2004),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,439 (year 2041),  Features Intersected: TRIB. TO SHAWNEE CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 11.123,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $88,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $131,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11052,  Location: 2.0N 1.1E OF RIVERTON (Lat: 37.103333,  Lng: -94.685000),  Route carried "on" structure: County highway 1367,  Year Built: 1957,  Status: Posted for load,  Structure Length: 7.83m (25.69ft),  Average Daily Traffic: 730 (year 2004),  Truck Traffic: 11%,  Average Future Daily Traffic: 730 (year 2041),  Design Load: H 15,  Features Intersected: SHAWNEE CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 1.819,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 28.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 9.14m (29.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $750,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11063,  Location: 3.5N OF BAXTER SPRINGS (Lat: 37.073333,  Lng: -94.740556),  Route carried "on" structure: County highway 2135,  Year Built: 1923,  Status: Posted for load,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 60 (year 2007),  Average Future Daily Traffic: 72 (year 2041),  Features Intersected: BRUSH CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 5.150,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Concrete,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 23.4 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 14.4 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.05m (13.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $350,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11065,  Location: 3.0N 0.5E OF RIVERTON (Lat: 37.120000,  Lng: -94.693550),  Route carried "on" structure: County highway 2160,  Year Built: 1942,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 100 (year 2004),  Truck Traffic: 11%,  Average Future Daily Traffic: 100 (year 2041),  Features Intersected: TRIB. TO SHAWNEE CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 11066,  Location: 3.0N 1.1E OF RIVERTON (Lat: 37.120000,  Lng: -94.685000),  Route carried "on" structure: County highway 2160,  Year Built: 1942,  Status: Open,  Structure Length: 8.50m (27.89ft),  Average Daily Traffic: 105 (year 2004),  Truck Traffic: 20%,  Average Future Daily Traffic: 105 (year 2041),  Features Intersected: SHAWNEE CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.24m (50.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $875,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $990,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 111101007003,  Location: 3.0W 0.7N OF RIVERTON (Lat: 37.083333,  Lng: -94.758333),  Route carried "on" structure: County highway 1109,  Year Built: 2012,  Status: Open,  Structure Length: 5.59m (18.34ft),  Average Daily Traffic: 25 (year 2007),  Design Load: HS 20+Mod,  Features Intersected: BRUSH CREEK,  Facility Carried by Structure: MINOR COL S-18.3
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11110180698,  Location: 4.5S 4.7E OF COLUMBUS (Lat: 37.104444,  Lng: -94.745000),  Route carried "on" structure: County highway ,  Year Built: 2006,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 50 (year 2007),  Average Future Daily Traffic: 60 (year 2041),  Design Load: HS 20,  Features Intersected: TRIB. TO BRUSH CREEK,  Facility Carried by Structure: LOCAL RD. 17-S.7
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 67.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 111103006966,  Location: 5.5N OF BAXTER SPRINGS (Lat: 37.113333,  Lng: -94.740000),  Route carried "on" structure: County highway ,  Year Built: 1982,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 40 (year 2007),  Average Future Daily Traffic: 40 (year 2041),  Features Intersected: TRIB. TO BRUSH CREEK,  Facility Carried by Structure: LOCAL RD. T-16.4
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 111103006986,  Location: 2.0W 1.5N OF RIVERTON (Lat: 37.095000,  Lng: -94.740556),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 30 (year 2007),  Average Future Daily Traffic: 35 (year 2041),  Design Load: HS 20,  Features Intersected: TRIB. TO BRUSH CREEK,  Facility Carried by Structure: LOCAL RD. T-17.5
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.0m (39.4ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 63.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11110310696,  Location: 3.5S 5.1E OF COLUMBUS (Lat: 37.118333,  Lng: -94.740000),  Route carried "on" structure: County highway ,  Year Built: 1935,  Status: Posted for load,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 50 (year 2007),  Average Future Daily Traffic: 50 (year 2041),  Features Intersected: TRIB. TO BRUSH CREEK,  Facility Carried by Structure: LOCAL RD. 16-T.1
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $37,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $55,000
Find on map >>   Show street view

Structure Number: 11110370698,  Location: 2.0N 1.6W OF RIVERTON (Lat: 37.104167,  Lng: -94.733611),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 50 (year 2007),  Average Future Daily Traffic: 50 (year 2041),  Design Load: HS 20,  Features Intersected: TRIB. TO BRUSH CREEK,  Facility Carried by Structure: LOCAL RD. 17-T.4
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 111105507025,  Location: 0.5S 0.5W OF RIVERTON (Lat: 37.067778,  Lng: -94.711667),  Route carried "on" structure: County highway ,  Year Built: 1936,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 75 (year 2004),  Average Future Daily Traffic: 75 (year 2041),  Features Intersected: TRIB. TO SPRING RIVER,  Facility Carried by Structure: LOCAL RD. 19.5-U.5
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 111109107,  Location: 1.0N 1.1E OF RIVERTON (Lat: 37.088333,  Lng: -94.682050),  Route carried "on" structure: County highway ,  Year Built: 1916,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 20 (year 2004),  Average Future Daily Traffic: 25 (year 2039),  Features Intersected: SPRING RIVER-OVERFLOW,  Facility Carried by Structure: LOCAL RD. 18-W.1
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Material/Design: Concrete,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 25.2 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 15.3 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Bridge Improvement Cost: $135,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $200,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 999906600110051,  Location: 0.50 MI E US 69 ALT (Lat: 37.074722,  Lng: -94.695278),  Route carried "on" structure: State highway 66,  Year Built: 1964,  Status: Open,  Structure Length: 28.27m (92.75ft),  Average Daily Traffic: 4,546 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,547 (year 2041),  Design Load: H 20,  Features Intersected: SPRING RIVER
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 1.843,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 52.4m (171.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 92.75m (304.30ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Underwater Inspection Date: September 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 999906600110721,  Location: 0.50 MI E U69 ALT (Lat: 37.074722,  Lng: -94.695556),  Route carried "on" structure: State highway 66,  Year Built: 1987,  Status: Open,  Structure Length: 28.37m (93.08ft),  Average Daily Traffic: 4,546 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,547 (year 2041),  Design Load: HS 20,  Features Intersected: SPRING RIVER
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 1.843,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 52.4m (171.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 93.08m (305.38ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Underwater Inspection Date: September 2019,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999940000110961,  Location: 3.4 MI S OF 69/400 JCT (Lat: 37.128611,  Lng: -94.704167),  Route carried "on" structure: Alternate US 69,  Year Built: 1998,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 6,586 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 9,786 (year 2041),  Design Load: HS 20,  Features Intersected: SHAWNEE CREEK DRAINAGE
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 15.591,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.0m (39.4ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.09m (33.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999940000111021,  Location: 0.60 MI N US400/US69A JCT (Lat: 37.062500,  Lng: -94.729722),  Route carried "on" structure: Alternate US 69,  Year Built: 2000,  Status: Open,  Structure Length: 6.67m (21.88ft),  Average Daily Traffic: 7,326 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,094 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: BRUSH CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 7.390,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 87.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 21.87m (71.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999940000111031,  Location: 2.62 MI N OF 400/69A JCT (Lat: 37.084444,  Lng: -94.705556),  Route carried "on" structure: Alternate US 69,  Year Built: 2000,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 4,085 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 6,070 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: SPRING RIVER TRIBUTARY
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 10.675,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 10.31m (33.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999940000111041,  Location: 2.61 MI NW 166/400 JCT (Lat: 37.053333,  Lng: -94.728056),  Route carried "on" structure: US 400,  Year Built: 2000,  Status: Open,  Structure Length: 52.89m (173.52ft),  Average Daily Traffic: 1,868 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,061 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: SPRING RIVER
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 65.962,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 53.3m (174.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 64.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 173.53m (569.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999940000111051,  Location: 2.24 MI NW 166/400 JCT (Lat: 37.051389,  Lng: -94.720556),  Route carried "on" structure: US 400,  Year Built: 2000,  Status: Open,  Structure Length: 8.31m (27.26ft),  Average Daily Traffic: 1,664 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,727 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: SPRING RIVER OVERFLOW
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 66.558,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 27.25m (89.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing