Bridge Statistics for Roanoke, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 37Number of bridges
  • 213ft / 65.2mTotal length
  • $23,709,000Total costs
  • 67,251Total average daily traffic
  • 4,083Total average daily truck traffic
  • 92,953Total future (year 2028) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Roanoke
  • No street view available for this location

New bridges in Roanoke, AL - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 51930-1939
  • 31940-1949
  • 51950-1959
  • 71960-1969
  • 11970-1979
  • 31980-1989
  • 31990-1999
  • 52000-2009
  • 22010-2019
Average Bridge Daily Traffic in Roanoke, AL
Average Bridge Truck Traffic in Roanoke, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 22.2%Good
  • 38.9%Satisfactory
  • 27.8%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 27.8%Good
  • 22.2%Satisfactory
  • 27.8%Fair
  • 5.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 11.1%Good
  • 33.3%Satisfactory
  • 27.8%Fair
  • 16.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.2%Excellent
  • 9.7%Very good
  • 25.8%Good
  • 45.2%Satisfactory
  • 16.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 5.3%Excellent
  • 15.8%Very good
  • 31.6%Good
  • 31.6%Satisfactory
  • 15.8%Fair
Find on map >>   Show street view

Structure Number: 326,  Location: 0.7 MI N ROANOKE (Lat: 33.175556,  Lng: -85.388944),  Route carried "on" structure: US 431,  Year Built: 1926,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 7,128 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,979 (year 2038),  Design Load: H 15,  Features Intersected: JONES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 294.906,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 54.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.01m (16.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,030,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,133,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 429,  Location: 0.6 MI N JCT SR 117* US72 (Lat: 34.861594,  Lng: -85.830892),  Route carried "on" structure: State highway 117,  Year Built: 1927,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 3,046 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,264 (year 2039),  Design Load: H 15,  Features Intersected: BENGES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.476,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.72m (12.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $587,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $646,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 956,  Location: 1.2MI SE WHITES CP CHURCH (Lat: 33.201100,  Lng: -85.389400),  Route carried "on" structure: County highway ,  Year Built: 1932,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 80 (year 1990),  Average Future Daily Traffic: 39 (year 2030),  Features Intersected: JONES CREEK,  Facility Carried by Structure: CO RD 83
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 6.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 3.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.45m (4.76ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: June 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $153,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1225,  Location: 6.3 MI E TALLAPOOSA RIVER (Lat: 33.136917,  Lng: -85.461806),  Route carried "on" structure: State highway 22,  Year Built: 1935,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 2,071 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,899 (year 2039),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 246.481,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 42.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $210,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $231,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1226,  Location: 8.5 MI E TALLAPOOSA RV. (Lat: 33.154800,  Lng: -85.427600),  Route carried "on" structure: State highway 22,  Year Built: 1935,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 2,019 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,624 (year 2039),  Design Load: H 15,  Features Intersected: LILES BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 250.261,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 81.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $477,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $525,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2028,  Location: 2.1 MI.SO.CULLMAN CO LN (Lat: 34.221667,  Lng: -86.493611),  Route carried "on" structure: US 231,  Year Built: 1939,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 3,880 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,044 (year 2041),  Features Intersected: ROSWELL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 450.116,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $443,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $487,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2327,  Location: 2 MI E JCT US 431 (Lat: 33.150528,  Lng: -85.327111),  Route carried "on" structure: State highway 22,  Year Built: 1940,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 3,597 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,036 (year 2038),  Design Load: H 15,  Features Intersected: HORNYHEAD BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 260.757,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 84.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $253,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3113,  Location: (BENEFIELD BR) (Lat: 33.222800,  Lng: -85.313300),  Route carried "on" structure: County highway ,  Year Built: 1947,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 505 (year 1990),  Truck Traffic: 30%,  Average Future Daily Traffic: 700 (year 2028),  Design Load: H 15,  Features Intersected: WEHADKEE CREEK,  Facility Carried by Structure: CO. RD. 87
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $912,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,003,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3616,  Location: .2MI SOUTH PEAVY (Lat: 33.135800,  Lng: -85.458200),  Route carried "on" structure: County highway 861,  Year Built: 1950,  Status: Posted for load,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 55 (year 1989),  Average Future Daily Traffic: 60 (year 2032),  Design Load: H 10,  Features Intersected: SEABOARD COAST LINERR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: Railroad,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 14.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: August 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $454,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $499,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 3617,  Location: .8MI EAST PEAVY (Lat: 33.140500,  Lng: -85.446700),  Route carried "on" structure: County highway 859,  Year Built: 1950,  Status: Posted for load,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 90 (year 1989),  Average Future Daily Traffic: 95 (year 2032),  Design Load: H 10,  Features Intersected: SEABOARD COAST LINERR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: Railroad,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 16.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $454,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $499,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 429,  Location: .04 MI SW US 431:ROANOKE (Lat: 33.173333,  Lng: -85.396667),  Route carried "on" structure: City street ,  Year Built: 1952,  Status: Posted for load,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 200 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 280 (year 2041),  Design Load: H 10,  Features Intersected: GASTON BRANCH,  Facility Carried by Structure: CO. RD. 26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.399,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 4.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 3.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.48m (8.14ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $323,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $355,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5095,  Location: ROANOKE (Lat: 33.166547,  Lng: -85.416081),  Route carried "on" structure: City street ,  Year Built: 1925,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 3,110 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,887 (year 2041),  Design Load: H 15,  Features Intersected: RAILROAD,  Facility Carried by Structure: LAFAYETTE HWY.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.800,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.5m (31.2ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.68m (15.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $738,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $812,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5867,  Location: 1.6MI W BACON LEVEL (Lat: 33.128400,  Lng: -85.318800),  Route carried "on" structure: County highway 18,  Year Built: 1957,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 100 (year 1997),  Average Future Daily Traffic: 150 (year 2028),  Design Load: HS 20,  Features Intersected: HORNEYHEAD BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.920,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $410,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $451,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 6573,  Location: (BUD CUMM CULVERT) (Lat: 33.127300,  Lng: -85.321500),  Route carried "on" structure: County highway 14,  Year Built: 1959,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 260 (year 1990),  Truck Traffic: 20%,  Average Future Daily Traffic: 250 (year 2030),  Design Load: HS 20,  Features Intersected: GLADEY MILL BRANCH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 2.910,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $490,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $539,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 7164,  Location: 1 MI. W. WELCH (Lat: 33.091150,  Lng: -85.356692),  Route carried "on" structure: County highway 241,  Year Built: 1960,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 382 (year 2009),  Truck Traffic: 6%,  Average Future Daily Traffic: 567 (year 2035),  Features Intersected: BELCHER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $270,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $297,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8653,  Location: ROANOKE (Lat: 33.166667,  Lng: -85.416667),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Temporarily open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 600 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 750 (year 2041),  Design Load: H 15,  Features Intersected: GRAVES CREEK,  Facility Carried by Structure: FRANKLIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.999,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $368,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $405,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 9584,  Location: TOWN OF ROANOKE (Lat: 33.132606,  Lng: -85.356344),  Route carried "on" structure: US 431,  Year Built: 1968,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 6,577 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,208 (year 2040),  Design Load: HS 20,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 288.769,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.44m (17.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,231,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $1,354,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9585,  Location: TOWN OF ROANOKE (Lat: 33.164650,  Lng: -85.367858),  Route carried "on" structure: US 431,  Year Built: 1968,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 13,711 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 19,195 (year 2039),  Design Load: HS 20,  Features Intersected: GRAVES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 292.577,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,528,000,  Roadway Improvement Cost: $153,000,  Total Project Cost: $1,681,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9586,  Location: 0.2 MI N ROANOKE (Lat: 33.172111,  Lng: -85.380056),  Route carried "on" structure: US 431,  Year Built: 1968,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 7,239 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,135 (year 2039),  Design Load: HS 20,  Features Intersected: HIGH PINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 293.952,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,466,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $1,613,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9589,  Location: .5 MI N WHITE CHIT RDS (Lat: 33.202200,  Lng: -85.343000),  Route carried "on" structure: County highway 16,  Year Built: 1968,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 350 (year 1997),  Truck Traffic: 25%,  Average Future Daily Traffic: 350 (year 2033),  Design Load: HS 20,  Features Intersected: HIGH PINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.089,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $593,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $652,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 10242,  Location: .6MI W ROANOKE (Lat: 33.161100,  Lng: -85.403600),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 75 (year 1997),  Average Future Daily Traffic: 150 (year 2030),  Design Load: HS 20,  Features Intersected: HIGHPINE CREEK,  Facility Carried by Structure: CO RD 855
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 76.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $429,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $472,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 12624,  Location: 0.5 MI. E. DOUBLEHEAD (Lat: 33.099008,  Lng: -85.381056),  Route carried "on" structure: County highway 241,  Year Built: 1981,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 575 (year 2009),  Truck Traffic: 4%,  Average Future Daily Traffic: 854 (year 2037),  Design Load: HS 20,  Features Intersected: CHIKASANOXEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $615,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $677,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13988,  Location: 1MI. NORTH HAPPYLAND (Lat: 33.102408,  Lng: -85.455550),  Route carried "on" structure: County highway 1100,  Year Built: 1986,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 110 (year 1992),  Truck Traffic: 8%,  Average Future Daily Traffic: 150 (year 2036),  Design Load: HS 20,  Features Intersected: CATY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $377,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $415,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14062,  Location: 7 MI E TALLAPOOSA RIVER (Lat: 33.142250,  Lng: -85.449833),  Route carried "on" structure: State highway 22,  Year Built: 1935,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 1,985 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,779 (year 2040),  Design Load: H 15,  Features Intersected: JACK BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 247.800,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $395,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $435,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14505,  Location: ROANOKE (Lat: 33.116667,  Lng: -85.673333),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,000 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,500 (year 2041),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: LOUINA STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 74.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $317,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $349,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15404,  Location: 1.5 MI NE DICKERT (Lat: 33.144000,  Lng: -85.450100),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 60 (year 1990),  Average Future Daily Traffic: 84 (year 2030),  Design Load: HS 20,  Features Intersected: MCCAY BRANCH,  Facility Carried by Structure: CO.RD. 861
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 53.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $349,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $384,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16022,  Location: CITY OF ROANOKE (Lat: 33.232056,  Lng: -85.356836),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 1,500 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,500 (year 2041),  Design Load: HS 20,  Features Intersected: HIGH PINE CREEK,  Facility Carried by Structure: OLD US 431(CO 59)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.698,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.56m (18.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,374,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $1,511,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16142,  Location: 1.8 MI SE DOUBLEHEAD (Lat: 33.068808,  Lng: -85.383983),  Route carried "on" structure: County highway 155,  Year Built: 1994,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 45 (year 1994),  Average Future Daily Traffic: 65 (year 2035),  Design Load: HS 20,  Features Intersected: CHIKASANOXEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 75.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $438,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $482,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 17389,  Location: 8 MI SE OF WEDOWEE (Lat: 33.211700,  Lng: -85.385900),  Route carried "on" structure: County highway 700,  Year Built: 1964,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 22 (year 1998),  Average Future Daily Traffic: 55 (year 2030),  Features Intersected: GRISWALD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $141,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $155,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 17561,  Location: 10 MI. E TALLAPOOSA RIVER (Lat: 33.159861,  Lng: -85.399194),  Route carried "on" structure: State highway 22,  Year Built: 2002,  Status: Open,  Structure Length: 2.09m (6.86ft),  Average Daily Traffic: 2,824 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,954 (year 2038),  Design Load: HS 20,  Features Intersected: HIGH PINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 253.557,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.1m (16.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 57.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.87m (9.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,606,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $1,767,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17562,  Location: 10 MI. E TALLAPOOSA RIVER (Lat: 33.162694,  Lng: -85.404833),  Route carried "on" structure: State highway 22,  Year Built: 2002,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 2,559 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,583 (year 2038),  Design Load: HS 20,  Features Intersected: JONES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 252.912,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.8m (12.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 69.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.42m (4.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $658,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $724,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18326,  Location: 2 MI. S.W. WELCH (Lat: 33.078611,  Lng: -85.361944),  Route carried "on" structure: County highway 155,  Year Built: 2002,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 47 (year 2010),  Average Future Daily Traffic: 69 (year 2034),  Design Load: HS 20,  Features Intersected: BELCHER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 67.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $374,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18376,  Location: 1 MI. N.W. CUMBEE MILL (Lat: 33.078928,  Lng: -85.322525),  Route carried "on" structure: County highway 251,  Year Built: 2001,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 45 (year 2010),  Average Future Daily Traffic: 66 (year 2035),  Design Load: HS 20,  Features Intersected: STROUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 69.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $189,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20279,  Location: ROANOKE (Lat: 33.115000,  Lng: -85.676667),  Route carried "on" structure: City street ,  Year Built: 2009,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 750 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 800 (year 2041),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: LOUINA ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.999,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $269,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $296,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2028,  Location: 1.9 MI US 431 (Lat: 32.696667,  Lng: -85.330833),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Closed,  Structure Length: 2.70m (8.86ft),  Average Daily Traffic: 200 (year 2018),  Average Future Daily Traffic: 250 (year 2038),  Features Intersected: SCL RAILROAD,  Facility Carried by Structure: JOHNSON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.058,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.5m (14.8ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.2m (20.3ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.62m (11.88ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2017,  Other Special Inspection Date: July 2018,  Bridge Improvement Cost: $397,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $437,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 20873,  Location: off state 22 west roanke (Lat: 33.152200,  Lng: -85.427000),  Route carried "on" structure: County highway 887,  Year Built: 2017,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 54 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 82 (year 2037),  Design Load: HS 20,  Features Intersected: High Pine Creek
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 11.1m (36.4ft)

Condition: Channel: Good,  Culverts: Excellent,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $512,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $563,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20975,  Location: 0.3 MI SW OF AL 22 (Lat: 33.143333,  Lng: -85.383333),  Route carried "on" structure: City street ,  Year Built: 2014,  Status: Posted for load,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 400 (year 2021),  Average Future Daily Traffic: 500 (year 2041),  Features Intersected: SCL RR,  Facility Carried by Structure: LOUINA ST.
Minimum Vertical Clearance: 6.86m (22.51ft),  Kilometerpoint: 0.299,  Lanes on structure: 2,  Owner: Railroad,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 6.6m (21.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 24.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.38m (14.37ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $810,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $891,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber