  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 669ft / 204mTotal length
  • $67,598,000Total costs
  • 53,460Total average daily traffic
  • 1,211Total average daily truck traffic
  • 74,368Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Robertsdale
  • No street view available for this location

New bridges in Robertsdale, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11980-1989
  • 21990-1999
  • 22000-2009
  • 102010-2019
Average Bridge Daily Traffic in Robertsdale, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 46.2%Very good
  • 53.8%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 76.9%Very good
  • 23.1%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 61.5%Very good
  • 30.8%Good
  • 7.7%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 68.8%Very good
  • 12.5%Good
  • 12.5%Satisfactory
  • 6.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 618,  Location: 0.6 MI E OF S JCT SR 59 (Lat: 30.563806,  Lng: -87.707339),  Route carried "on" structure: US 90,  Year Built: 1929,  Year Reconstructed: 1931,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 7,330 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,995 (year 2039),  Design Load: H 15,  Features Intersected: ROCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.148,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $326,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $359,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12989,  Location: 2.7 MI E OF JCT SR 59 (Lat: 30.565322,  Lng: -87.672747),  Route carried "on" structure: US 90,  Year Built: 1983,  Status: Open,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 7,330 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,995 (year 2039),  Design Load: HS 20,  Features Intersected: BLACKWATER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 100.499,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 13.4m (44.0ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.28m (33.73ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Underwater Inspection Date: January 2022,  Bridge Improvement Cost: $3,244,000,  Roadway Improvement Cost: $324,000,  Total Project Cost: $3,568,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15822,  Location: 0.8 MI. E. OF CO. RD. 55 (Lat: 30.552842,  Lng: -87.737417),  Route carried "on" structure: County highway 52,  Year Built: 1993,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 933 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,260 (year 2039),  Design Load: HS 20,  Features Intersected: SILVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.39m (4.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $289,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $318,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16354,  Location: 1.2 MI. E. OF CO. RD. 65 (Lat: 30.596447,  Lng: -87.696797),  Route carried "on" structure: County highway 71,  Year Built: 1996,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 921 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,244 (year 2038),  Design Load: HS 20,  Features Intersected: BLACKWATER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 86.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.75m (15.58ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Underwater Inspection Date: December 2018,  Bridge Improvement Cost: $1,041,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,145,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1952,  Location: 0.7 MI. W. OF CO. RD. 83 (Lat: 30.603983,  Lng: -87.677867),  Route carried "on" structure: County highway 62,  Year Built: 2009,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 485 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 655 (year 2038),  Design Load: HS 20,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.31m (10.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $680,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $748,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2001,  Location: 4.2 M. N. OF CR 32 (Lat: 30.534500,  Lng: -87.665800),  Route carried "on" structure: County highway 83,  Year Built: 2013,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 3,732 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,038 (year 2038),  Design Load: HS 20,  Features Intersected: WATERHOLE BRANCH TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Toll: Toll bridge is a segment,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,544,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $1,698,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20011,  Location: 2.6 M. N. OF CR 32 (Lat: 30.523650,  Lng: -87.666061),  Route carried "on" structure: County highway 83,  Year Built: 2014,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 3,732 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,038 (year 2038),  Design Load: HS 20,  Features Intersected: WATERHOLE BRANCH,  Facility Carried by Structure: BEACH EXPRESS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.36m (20.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,832,000,  Roadway Improvement Cost: $183,000,  Total Project Cost: $2,015,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20012,  Location: 0.4 M. N. OF US 90 (Lat: 30.572592,  Lng: -87.666050),  Route carried "on" structure: County highway 83,  Year Built: 2012,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 3,732 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,038 (year 2038),  Design Load: HS 20,  Features Intersected: DAVIS BRANCH,  Facility Carried by Structure: BEACH EXPRESS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 51.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.86m (38.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $3,417,000,  Roadway Improvement Cost: $342,000,  Total Project Cost: $3,759,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20013,  Location: 0.4 MI. N. OF US 90 (Lat: 30.572594,  Lng: -87.665803),  Route carried "on" structure: County highway 83,  Year Built: 2011,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 1,585 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,139 (year 2039),  Design Load: HS 20,  Features Intersected: DAVIS BRANCH,  Facility Carried by Structure: BALDWIN BEACH EXPR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 59.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.86m (38.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $3,417,000,  Roadway Improvement Cost: $342,000,  Total Project Cost: $3,759,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20019,  Location: 4.9 M. N. OF CR 32 (Lat: 30.557944,  Lng: -87.666058),  Route carried "on" structure: County highway 83,  Year Built: 2014,  Status: Open,  Structure Length: 45.72m (150.00ft),  Average Daily Traffic: 3,732 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,038 (year 2038),  Design Load: HS 20,  Features Intersected: BLACKWATER RIVER,  Facility Carried by Structure: BEACH EXPRESS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 79.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 45.72m (150.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $13,167,000,  Roadway Improvement Cost: $1,317,000,  Total Project Cost: $14,484,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2002,  Location: 4.9 M. N. OF CR 32 (Lat: 30.557814,  Lng: -87.665811),  Route carried "on" structure: County highway 83,  Year Built: 2014,  Status: Open,  Structure Length: 45.72m (150.00ft),  Average Daily Traffic: 3,732 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,038 (year 2038),  Design Load: HS 20,  Features Intersected: BLACKWATER RIVER,  Facility Carried by Structure: BEACH EXPRESS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 79.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 45.72m (150.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $13,167,000,  Roadway Improvement Cost: $1,317,000,  Total Project Cost: $14,484,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20021,  Location: 4.3 M. N. OF CR 32 (Lat: 30.548536,  Lng: -87.666078),  Route carried "on" structure: County highway 83,  Year Built: 2014,  Status: Open,  Structure Length: 28.04m (91.99ft),  Average Daily Traffic: 3,732 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,038 (year 2038),  Design Load: HS 20,  Features Intersected: ROCK CREEK,  Facility Carried by Structure: BEACH EXPRESS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 23,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 49.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 28.04m (91.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $8,076,000,  Roadway Improvement Cost: $808,000,  Total Project Cost: $8,884,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20022,  Location: 4.3 M. N. OF CR 32 (Lat: 30.548533,  Lng: -87.665836),  Route carried "on" structure: County highway 83,  Year Built: 2014,  Status: Open,  Structure Length: 28.04m (91.99ft),  Average Daily Traffic: 3,732 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,038 (year 2038),  Design Load: HS 20,  Features Intersected: ROCK CREEK,  Facility Carried by Structure: BEACH EXPRESS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 23,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 49.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 28.04m (91.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $8,076,000,  Roadway Improvement Cost: $808,000,  Total Project Cost: $8,884,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20086,  Location: 2.6 M. N. OF CR 32 (Lat: 30.523800,  Lng: -87.665800),  Route carried "on" structure: County highway 83,  Year Built: 2012,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 3,732 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,038 (year 2038),  Design Load: HS 20,  Features Intersected: WATERHOLE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.36m (20.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,832,000,  Roadway Improvement Cost: $183,000,  Total Project Cost: $2,015,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20756,  Location: 0.3 MI. S. OF US 90 (Lat: 30.558986,  Lng: -87.699950),  Route carried "on" structure: City street 71,  Year Built: 2014,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 4,968 (year 2018),  Average Future Daily Traffic: 6,706 (year 2038),  Design Load: HS 20,  Features Intersected: ROCK CREEK,  Facility Carried by Structure: COLLEGE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.429,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20806,  Location: 1.6 M. E. OF COLLEGE AVE. (Lat: 30.553081,  Lng: -87.668611),  Route carried "on" structure: City street 52,  Year Built: 2006,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 52 (year 2021),  Average Future Daily Traffic: 70 (year 2041),  Design Load: HS 20,  Features Intersected: ROCK CREEK,  Facility Carried by Structure: WILTERS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: May 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $760,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $836,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels