Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Rogersville, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 518ft / 158mTotal length
  • $45,909,000Total costs
  • 55,445Total average daily traffic
  • 5,003Total average daily truck traffic
  • 69,914Total future (year 2028) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Rogersville
  • No street view available for this location

New bridges in Rogersville, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 51930-1939
  • 21950-1959
  • 11970-1979
  • 11980-1989
  • 51990-1999
  • 32000-2009
  • 22010-2019
Reconstructed bridges in Rogersville, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31960-1969
  • 11970-1979
Average Bridge Daily Traffic in Rogersville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Good
  • 50.0%Satisfactory
  • 40.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Very good
  • 20.0%Good
  • 40.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 40.0%Good
  • 30.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 25.0%Good
  • 50.0%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 10.0%Excellent
  • 70.0%Very good
  • 10.0%Satisfactory
  • 10.0%Fair
Find on map >>   Show street view

Structure Number: 989,  Location: 0.1 MI N INT US 72 (Lat: 34.836481,  Lng: -87.338183),  Route carried "on" structure: County highway 51,  Year Built: 1993,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 330 (year 1993),  Truck Traffic: 10%,  Average Future Daily Traffic: 650 (year 2028),  Features Intersected: SIMPSON BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.5m (11.5ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 16.4m (53.8ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $669,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $736,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 105,  Location: 0.8 MI SR 207 (Lat: 34.824064,  Lng: -87.286300),  Route carried "on" structure: County highway 66,  Year Built: 1933,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 325 (year 1989),  Truck Traffic: 10%,  Average Future Daily Traffic: 650 (year 2028),  Features Intersected: NEELEY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $274,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $301,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1387,  Location: 3.7 M E JCT SR 2 & SR207 (Lat: 34.803081,  Lng: -87.230100),  Route carried "on" structure: US 72,  Year Built: 1936,  Status: Open,  Structure Length: 48.22m (158.20ft),  Average Daily Traffic: 5,150 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,259 (year 2033),  Design Load: H 20,  Features Intersected: ELK RIVER,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 96.181,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.3m (43.6ft),  Skew: 10 degrees,  Navigation Control: Yes ( Vertical Clearance: 8.5m (27.9ft), Horizontal Clearance: 57.9m (190.0ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 20,  Length of Maximum Span: 61.0m (200.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 40.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 48.22m (158.20ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Critical Feature Inspection Date: March 2022,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $8,597,000,  Roadway Improvement Cost: $860,000,  Total Project Cost: $9,457,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1614,  Location: 0.9 MI S CO 26 (Lat: 34.839064,  Lng: -87.228097),  Route carried "on" structure: County highway 70,  Year Built: 1937,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 188 (year 1989),  Truck Traffic: 10%,  Average Future Daily Traffic: 376 (year 2031),  Features Intersected: LEGG BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.48m (4.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $256,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4859,  Location: 4 MI E INT SR 207 (Lat: 34.851211,  Lng: -87.235881),  Route carried "on" structure: County highway 26,  Year Built: 1954,  Status: Posted for load,  Structure Length: 10.00m (32.81ft),  Average Daily Traffic: 275 (year 1989),  Truck Traffic: 10%,  Average Future Daily Traffic: 550 (year 2031),  Design Load: H 15,  Features Intersected: ANDERSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 8,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 10.93m (35.86ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $1,799,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $1,979,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8952,  Location: 0.3 M W JCT SR 2 & SR207 (Lat: 34.827742,  Lng: -87.307892),  Route carried "on" structure: US 72,  Year Built: 1938,  Year Reconstructed: 1966,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 12,850 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 15,617 (year 2033),  Design Load: H 15,  Features Intersected: WEAVER BRANCH,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 89.406,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 74.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $788,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $867,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8953,  Location: 0.6 M E JCT SR 2 & SR207 (Lat: 34.821208,  Lng: -87.282825),  Route carried "on" structure: US 72,  Year Built: 1938,  Year Reconstructed: 1966,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 11,570 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,062 (year 2033),  Design Load: H 15,  Features Intersected: NEELY BRANCH,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.081,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.0m (62.3ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 85.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,151,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,266,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10735,  Location: 3.9 M E JCT SR 2 & SR101 (Lat: 34.832950,  Lng: -87.323061),  Route carried "on" structure: US 72,  Year Built: 1972,  Status: Open,  Structure Length: 8.20m (26.90ft),  Average Daily Traffic: 6,425 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,808 (year 2033),  Design Load: HS 20,  Features Intersected: FIRST CREEK,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.218,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.8m (35.4ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 61.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.20m (30.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,712,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $2,983,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11031,  Location: 1.5 MI NE INT US 72 (Lat: 34.823311,  Lng: -87.242353),  Route carried "on" structure: County highway 70,  Year Built: 1927,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 12.25m (40.19ft),  Average Daily Traffic: 170 (year 1989),  Truck Traffic: 10%,  Average Future Daily Traffic: 340 (year 2030),  Design Load: H 15,  Features Intersected: ANDERSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 13.10m (42.98ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Underwater Inspection Date: April 2018,  Bridge Improvement Cost: $2,155,000,  Roadway Improvement Cost: $216,000,  Total Project Cost: $2,371,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 11738,  Location: 0.2 MI S US 72 (Lat: 34.821483,  Lng: -87.294442),  Route carried "on" structure: County highway 91,  Year Built: 1956,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 2,186 (year 2001),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,248 (year 2031),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 50.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $250,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12622,  Location: 40 FT WEST OF COUNTY 70 (Lat: 34.797847,  Lng: -87.259192),  Route carried "on" structure: County highway 70,  Year Built: 1981,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 205 (year 1989),  Truck Traffic: 10%,  Average Future Daily Traffic: 410 (year 2030),  Design Load: HS 20,  Features Intersected: POPLAR SPRINGS BRANCH,  Facility Carried by Structure: POPLAR SPRINGS DRI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $290,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1587,  Location: 3.7 M E JCT SR 2 & SR207 (Lat: 34.803144,  Lng: -87.229900),  Route carried "on" structure: US 72,  Year Built: 1994,  Status: Open,  Structure Length: 49.44m (162.20ft),  Average Daily Traffic: 5,150 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,259 (year 2033),  Design Load: HS 20,  Features Intersected: ELK RIVER,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 96.181,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 10 degrees,  Navigation Control: Yes ( Vertical Clearance: 8.2m (26.9ft), Horizontal Clearance: 53.3m (174.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 14,  Length of Maximum Span: 61.0m (200.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 49.44m (162.20ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $14,577,000,  Roadway Improvement Cost: $1,458,000,  Total Project Cost: $16,035,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16535,  Location: 0.81 MI S US 72 (Lat: 34.814706,  Lng: -87.294661),  Route carried "on" structure: County highway 91,  Year Built: 1996,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,402 (year 2001),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,887 (year 2028),  Design Load: HS 20,  Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 74.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $545,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $600,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16544,  Location: INT CO 55 * CO 53 (Lat: 34.862425,  Lng: -87.311308),  Route carried "on" structure: County highway 92,  Year Built: 1992,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 210 (year 1983),  Truck Traffic: 10%,  Average Future Daily Traffic: 295 (year 2028),  Design Load: HS 20,  Features Intersected: NUGENT BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $333,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $366,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17258,  Location: 1.28 KM S. OF US 72 (Lat: 34.814800,  Lng: -87.294678),  Route carried "on" structure: County highway 91,  Year Built: 1996,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,402 (year 2001),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,887 (year 2028),  Design Load: HS 20,  Features Intersected: NEELY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.1m (46.3ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 86.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $554,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $609,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17785,  Location: 3.9 M E JCT SR 2 & SR101 (Lat: 34.833361,  Lng: -87.324694),  Route carried "on" structure: US 72,  Year Built: 2007,  Status: Open,  Structure Length: 12.80m (41.99ft),  Average Daily Traffic: 6,425 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,808 (year 2033),  Design Load: HS 20,  Features Intersected: FIRST CREEK,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.106,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 73.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.63m (44.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $4,019,000,  Roadway Improvement Cost: $402,000,  Total Project Cost: $4,421,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18139,  Location: 0.1 MI N INT. CO.26 (Lat: 34.852769,  Lng: -87.235417),  Route carried "on" structure: County highway 95,  Year Built: 2001,  Status: Open,  Structure Length: 2.08m (6.82ft),  Average Daily Traffic: 100 (year 1989),  Average Future Daily Traffic: 200 (year 2028),  Features Intersected: DEMENT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.1m (16.7ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 56.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.85m (9.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $659,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $725,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19767,  Location: 0.4 MI WEST AL 207 (Lat: 34.833161,  Lng: -87.301306),  Route carried "on" structure: County highway ,  Year Built: 2006,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 460 (year 2006),  Average Future Daily Traffic: 684 (year 2030),  Design Load: HS 20,  Features Intersected: WEAVER BRANCH,  Facility Carried by Structure: ROSE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.8m (12.5ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.47m (4.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $262,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20538,  Location: 0.8 MILES W OF AL 207 (Lat: 34.854436,  Lng: -87.311136),  Route carried "on" structure: County highway 55,  Year Built: 2011,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 464 (year 2001),  Truck Traffic: 10%,  Average Future Daily Traffic: 689 (year 2032),  Design Load: HS 20,  Features Intersected: FIRST CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $778,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $856,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21159,  Location: 0.6 mi east of co 55 (Lat: 34.863444,  Lng: -87.303672),  Route carried "on" structure: County highway 92,  Year Built: 2018,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 158 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 235 (year 2037),  Design Load: HS 20,  Features Intersected: First Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,163,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,279,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Rogersville, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.