Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Rolling Prairie, Indiana (IN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 121ft / 36.5mTotal length
  • 118,466Total average daily traffic
  • 19,387Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Rolling Prairie
  • No street view available for this location

New bridges in Rolling Prairie, IN - historical statistics
  • New bridges - historical statistics
  • 81950-1959
  • 11960-1969
  • 12000-2009
  • 22020-2022
Reconstructed bridges in Rolling Prairie, IN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41980-1989
  • 11990-1999
Average Bridge Daily Traffic in Rolling Prairie, IN
Average Bridge Truck Traffic in Rolling Prairie, IN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Very good
  • 16.7%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Excellent
  • 33.3%Good
  • 50.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 5305,  Location: 03.60 E SR 39 (Lat: 41.677631,  Lng: -86.668411),  Route carried "on" structure: US 20,  Year Built: 1956,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 13,623 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 18,868 (year 2029),  Design Load: HS 20,  Features Intersected: I-90 EB/WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.110,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Toll Authority,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 26.0m (85.3ft),  Out-to-Out Width: 26.9m (88.3ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 531,  Location: 01.44 W SR 2 (Lat: 41.670619,  Lng: -86.616097),  Route carried "on" structure: US 20,  Year Built: 2004,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 13,623 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 18,868 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: N&S RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.455,  Lanes on structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.8m (107.6ft),  Curb-To-Curb Width: 22.0m (72.2ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 84.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 62.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4742,  Location: 07.41 E SR 39 (Lat: 41.710311,  Lng: -86.617539),  Route carried "on" structure: County highway ,  Year Built: 1956,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 9.69m (31.79ft),  Average Daily Traffic: 608 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 998 (year 2031),  Design Load: HS 20,  Features Intersected: I-90 EB/WB,  Facility Carried by Structure: CR 425 E/TEETER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 4743,  Location: 08.01 E SR 39 (Lat: 41.716819,  Lng: -86.609772),  Route carried "on" structure: Interstate 90,  Year Built: 1956,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 12,966 (year 2011),  Truck Traffic: 24%,  Average Future Daily Traffic: 26,252 (year 2031),  Design Load: HS 20,  Features Intersected: CSS & SB RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.588,  Lanes on structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 81.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 4744,  Location: 08.01 E SR 39 (Lat: 41.716819,  Lng: -86.610147),  Route carried "on" structure: Interstate 90,  Year Built: 1956,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 12,966 (year 2011),  Truck Traffic: 24%,  Average Future Daily Traffic: 26,252 (year 2031),  Design Load: HS 20,  Features Intersected: CSS & SB RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.588,  Lanes on structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 81.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 4600123,  Location: 00.80 N CR 700 N (Lat: 41.717319,  Lng: -86.668769),  Route carried "on" structure: County highway ,  Year Built: 1960,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,500 (year 2040),  Design Load: HS 20,  Features Intersected: NICTD RR,  Facility Carried by Structure: FAIL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5305,  Location: 03.60 E SR-39 (Lat: 41.677631,  Lng: -86.668419),  Route carried "under" structure: Interstate 90,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 13,360 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-90 WBL,  Facility Carried by Structure: US 20
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 84.989,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 5305,  Location: 03.60 E SR-39 (Lat: 41.677631,  Lng: -86.668419),  Route carried "under" structure: Interstate 90,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 13,360 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-90 EBL,  Facility Carried by Structure: US 20
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 84.989,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 5315,  Location: 07.82 E SR 39 (Lat: 41.672889,  Lng: -86.588989),  Route carried "under" structure: US 20,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 4,650 (year 2016),  Truck Traffic: 12%,  Features Intersected: SR 2 WBL to US 20 WBL
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 84.989,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.0m (72.2ft)

Find on map >>   Show street view

Structure Number: 5315,  Location: 07.82 E SR 39 (Lat: 41.672889,  Lng: -86.588989),  Route carried "under" structure: US 20,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 4,650 (year 2016),  Truck Traffic: 12%,  Features Intersected: US 20 EBL to SR 2 EBL
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 84.989,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.0m (72.2ft)

Find on map >>   Show street view

Structure Number: 4742,  Location: 07.41 E SR 39 (Lat: 41.710311,  Lng: -86.617539),  Route carried "under" structure: Interstate 90,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 13,580 (year 2011),  Truck Traffic: 24%,  Features Intersected: I-90 EB,  Facility Carried by Structure: CR 425E/TEETER RD
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 90.622,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 4742,  Location: 07.41 E SR 39 (Lat: 41.710311,  Lng: -86.617539),  Route carried "under" structure: Interstate 90,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 13,580 (year 2011),  Truck Traffic: 24%,  Features Intersected: I-90 WB,  Facility Carried by Structure: CR 425E/TEETER RD
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 90.622,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Discuss Rolling Prairie, Indiana (IN) on our hugely popular Indiana forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.