Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Rowland, North Carolina (NC)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 108ft / 32.8mTotal length
  • 181,200Total average daily traffic
  • 39,022Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Rowland
  • No street view available for this location

New bridges in Rowland, NC - historical statistics
  • New bridges - historical statistics
  • 81960-1969
  • 81970-1979
  • 11980-1989
  • 12010-2019
Average Bridge Daily Traffic in Rowland, NC
Average Bridge Truck Traffic in Rowland, NC
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Very good
  • 50.0%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 50.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 57.1%Good
  • 28.6%Fair
  • 14.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Satisfactory
  • 66.7%Fair
Find on map >>   Show street view

Structure Number: 1550001,  Location: 0.1 MI. S. OF US501 (Lat: 34.503069,  Lng: -79.308242),  Route carried "on" structure: Ramp Interstate 95,  Year Built: 1970,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 16,000 (year 2018),  Truck Traffic: 23%,  Average Future Daily Traffic: 32,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: MITCHELL SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.030,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 95),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 1550002,  Location: 0.7 MI. S. OF SR2517 (Lat: 34.502350,  Lng: -79.307411),  Route carried "on" structure: US 301,  Year Built: 1960,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 4,200 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,400 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CONTRARY SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 17.6m (57.7ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 1550004,  Location: 0.3 MI.W JCT SR2494 (Lat: 34.523022,  Lng: -79.276714),  Route carried "on" structure: State highway 130,  Year Built: 1973,  Status: Open,  Structure Length: 7.55m (24.77ft),  Average Daily Traffic: 2,400 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,800 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: I95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.701,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.7m (54.8ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 20.6m (67.6ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 1550005,  Location: 400'N. OF JCT.US301/US501 (Lat: 34.501806,  Lng: -79.306800),  Route carried "on" structure: Ramp Interstate 95,  Year Built: 1960,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 9,750 (year 2019),  Truck Traffic: 23%,  Average Future Daily Traffic: 19,500 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CONTRARY SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.960,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 1550012,  Location: 2.2 MI. S. JCT. NC130 (Lat: 34.502489,  Lng: -79.307408),  Route carried "on" structure: Interstate 95,  Year Built: 1967,  Status: Open,  Structure Length: 7.19m (23.59ft),  Average Daily Traffic: 19,500 (year 2019),  Truck Traffic: 23%,  Average Future Daily Traffic: 39,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: US301/501
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.030,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 95),  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 73.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1550086,  Location: 1.0 MI E JCT SR 2519 (Lat: 34.534664,  Lng: -79.250881),  Route carried "on" structure: State highway 2459,  Year Built: 1973,  Status: Open,  Structure Length: 7.95m (26.08ft),  Average Daily Traffic: 430 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 860 (year 2040),  Design Load: HS 15,  Features Intersected: I95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.5m (96.8ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1550089,  Location: 0.4 MI.N.JCT.SR2459 (Lat: 34.536583,  Lng: -79.243989),  Route carried "on" structure: Interstate 95,  Year Built: 1973,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 41,500 (year 2018),  Truck Traffic: 23%,  Average Future Daily Traffic: 83,000 (year 2040),  Features Intersected: ASHPOLE SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.371,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 95),  Owner: State Highway Agency,  Approaching Roadway Width: 23.1m (75.8ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: Febuary 2021
Find on map >>   Show street view

Structure Number: 1550142,  Location: 0.7 MI. W. JCT. SR2458 (Lat: 34.545019,  Lng: -79.246864),  Route carried "on" structure: State highway 2519,  Year Built: 2014,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 1,100 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,200 (year 2040),  Design Load: HL 93,  Features Intersected: ASHPOLE SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1550316,  Location: 0.2 MI. E. OF JCT. SR1140 (Lat: 34.519486,  Lng: -79.311439),  Route carried "on" structure: State highway 1139,  Year Built: 1988,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 200 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: MITCHELL SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 78.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: Febuary 2021
Find on map >>   Show street view

Structure Number: 1550462,  Location: 0.8 MI.S. OF JCT.SR2493 (Lat: 34.501231,  Lng: -79.305867),  Route carried "on" structure: State highway 2494,  Year Built: 1960,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 220 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 440 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CONTRARY SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 1550004,  Location: 0.3 MI.W JCT SR2494 (Lat: 34.523022,  Lng: -79.276714),  Route carried "under" structure: Interstate 95,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 19,500 (year 2019),  Truck Traffic: 23%,  Features Intersected: NC130
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.701,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 1550004,  Location: 0.3 MI.W JCT SR2494 (Lat: 34.523022,  Lng: -79.276714),  Route carried "under" structure: Interstate 95,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 19,500 (year 2019),  Truck Traffic: 23%,  Features Intersected: NC130
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 0.701,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 155001,  Location: 2.2 MI. S. NC130 (Lat: 34.502186,  Lng: -79.307403),  Route carried "under" structure: US 301,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 2,100 (year 2018),  Truck Traffic: 7%,  Features Intersected: I95N.
Minimum Vertical Clearance: 4.77m (15.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 155001,  Location: 2.2 MI. S. NC130 (Lat: 34.502186,  Lng: -79.307403),  Route carried "under" structure: US 301,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 2,100 (year 2018),  Truck Traffic: 7%,  Features Intersected: I95N.
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 1550012,  Location: 2.2 MI. S. JCT. NC130 (Lat: 34.502489,  Lng: -79.307408),  Route carried "under" structure: US 301,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 1,850 (year 2015),  Truck Traffic: 7%,  Features Intersected: I-95S.
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 1550012,  Location: 2.2 MI. S. JCT. NC130 (Lat: 34.502489,  Lng: -79.307408),  Route carried "under" structure: US 301,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 1,850 (year 2015),  Truck Traffic: 7%,  Features Intersected: I-95S.
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 1550086,  Location: 1.0 MI E JCT SR 2519 (Lat: 34.534664,  Lng: -79.250881),  Route carried "under" structure: Interstate 95,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 19,500 (year 2017),  Truck Traffic: 23%,  Features Intersected: SR2459
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 1.219,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.5m (96.8ft)

Find on map >>   Show street view

Structure Number: 1550086,  Location: 1.0 MI E JCT SR 2519 (Lat: 34.534664,  Lng: -79.250881),  Route carried "under" structure: Interstate 95,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 19,500 (year 2017),  Truck Traffic: 23%,  Features Intersected: SR2459
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 1.219,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.5m (96.8ft)

Discuss Rowland, North Carolina (NC) on our hugely popular North Carolina forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.