Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Rush, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 26Number of bridges
  • 312ft / 95.1mTotal length
  • $64,663,000Total costs
  • 239,253Total average daily traffic
  • 12,460Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Rush
  • No street view available for this location

New bridges in Rush, NY - historical statistics
  • New bridges - historical statistics
  • 81970-1979
  • 131980-1989
  • 31990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Rush, NY
Average Bridge Truck Traffic in Rush, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.1%Excellent
  • 21.4%Very good
  • 42.9%Good
  • 21.4%Satisfactory
  • 7.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 13.3%Very good
  • 73.3%Good
  • 13.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Very good
  • 20.0%Good
  • 60.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Very good
  • 85.7%Good
Find on map >>   Show street view

Structure Number: 101151,  Location: 1.2MI S JCT RTS 15 & 251 (Lat: 42.986775,  Lng: -77.672325),  Route carried "on" structure: US 15,  Year Built: 1983,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 3,466 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,487 (year 2040),  Design Load: HS 20,  Features Intersected: HONEOYE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.696,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,392,000,  Roadway Improvement Cost: $815,000,  Total Project Cost: $2,208,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 101152,  Location: 0.6MI S JCT RTS 15 & 251 (Lat: 42.993422,  Lng: -77.669175),  Route carried "on" structure: State highway 15,  Year Built: 2007,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 3,466 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,487 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: LEHIGH VALLEY TRA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Superstructure: Good,  Substructure: Very good,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $658,000,  Roadway Improvement Cost: $386,000,  Total Project Cost: $1,044,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 101161,  Location: 0.2 MI S JCT RTS 15A &251 (Lat: 42.993047,  Lng: -77.645414),  Route carried "on" structure: State highway 15A,  Year Built: 1992,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 7,874 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,922 (year 2040),  Design Load: HS 20,  Features Intersected: HONEOYE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.935,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,391,000,  Roadway Improvement Cost: $815,000,  Total Project Cost: $2,206,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 106904,  Location: 0.2MI.W.JCT.RTS. 251 & 15 (Lat: 43.003039,  Lng: -77.669294),  Route carried "on" structure: State highway 251,  Year Built: 1976,  Status: Open,  Structure Length: 8.96m (29.40ft),  Average Daily Traffic: 3,571 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,593 (year 2040),  Design Load: HS 20,  Features Intersected: 390I390I43031047, RTE I3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.836,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 22 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 44.1m (144.7ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.96m (29.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $5,089,000,  Roadway Improvement Cost: $2,980,000,  Total Project Cost: $8,069,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 106905,  Location: JCT SH 15 & I390 (Lat: 43.006417,  Lng: -77.666644),  Route carried "on" structure: State highway 15,  Year Built: 1977,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 11.80m (38.71ft),  Average Daily Traffic: 9,926 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,058 (year 2040),  Design Load: HS 20,  Features Intersected: 390I390I43031050 NB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.868,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 25 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 57.9m (190.0ft),  Curb-To-Curb Width: 21.8m (71.5ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Excellent,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.79m (38.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $8,205,000,  Roadway Improvement Cost: $4,805,000,  Total Project Cost: $13,009,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1069061,  Location: 2 MILES South OF THRUWAY (Lat: 43.017789,  Lng: -77.659711),  Route carried "on" structure: Interstate 390,  Year Built: 1977,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 19,703 (year 2006),  Truck Traffic: 11%,  Design Load: HS 20,  Features Intersected: RUSH-HEN.TN LN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.461,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,447,000,  Roadway Improvement Cost: $847,000,  Total Project Cost: $2,294,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1069062,  Location: 2 MILES South OF THRUWAY (Lat: 43.017792,  Lng: -77.659247),  Route carried "on" structure: Interstate 390,  Year Built: 1977,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 12,365 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 17,195 (year 2040),  Design Load: HS 20,  Features Intersected: RUSH-HEN.TN LN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.429,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,392,000,  Roadway Improvement Cost: $815,000,  Total Project Cost: $2,208,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107028,  Location: 0.3 MI S JCT RT 15 & I390 (Lat: 42.947761,  Lng: -77.696533),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 1,690 (year 2020),  Truck Traffic: 33%,  Average Future Daily Traffic: 1,763 (year 2040),  Design Load: HS 20,  Features Intersected: 390I390I43031006 NB, RTE,  Facility Carried by Structure: HONEOYE FALLS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.285,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.3m (138.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.62m (28.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,981,000,  Roadway Improvement Cost: $1,746,000,  Total Project Cost: $4,727,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107029,  Location: JCT OF RTS 15 & I-390 (Lat: 42.949728,  Lng: -77.697339),  Route carried "on" structure: State highway 15,  Year Built: 1980,  Status: Open,  Structure Length: 10.58m (34.71ft),  Average Daily Traffic: 3,466 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,487 (year 2040),  Design Load: HS 20,  Features Intersected: 390I390I43031007 SB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.046,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 51.8m (169.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.57m (34.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $4,171,000,  Roadway Improvement Cost: $2,443,000,  Total Project Cost: $6,614,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1070301,  Location: 2 MI N JCT SH 15 & I390 (Lat: 42.978667,  Lng: -77.683403),  Route carried "on" structure: Interstate 390,  Year Built: 1980,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 10,391 (year 2008),  Truck Traffic: 18%,  Design Load: HS 20,  Features Intersected: CR65-RUSH W RH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.650,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,766,000,  Roadway Improvement Cost: $1,034,000,  Total Project Cost: $2,800,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1070302,  Location: 2 MI N JCT SH 15 & I390 (Lat: 42.978789,  Lng: -77.682819),  Route carried "on" structure: Interstate 390,  Year Built: 1980,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 9,291 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 11,395 (year 2040),  Design Load: HS 20,  Features Intersected: CR65-RUSH W RH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.634,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,766,000,  Roadway Improvement Cost: $1,034,000,  Total Project Cost: $2,800,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1070311,  Location: 1 MI S JCT RTS 251 & I390 (Lat: 42.990725,  Lng: -77.679775),  Route carried "on" structure: Interstate 390,  Year Built: 1980,  Status: Open,  Structure Length: 13.38m (43.90ft),  Average Daily Traffic: 10,391 (year 2008),  Truck Traffic: 18%,  Design Load: HS 20,  Features Intersected: FISHELL ROAD, HONEOYE CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.921,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 49.3m (161.7ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.38m (43.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $4,328,000,  Roadway Improvement Cost: $2,535,000,  Total Project Cost: $6,863,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1070312,  Location: 1 MI S JCT RTS 251 & I390 (Lat: 42.990644,  Lng: -77.679214),  Route carried "on" structure: Interstate 390,  Year Built: 1980,  Status: Open,  Structure Length: 12.92m (42.39ft),  Average Daily Traffic: 9,291 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 11,395 (year 2040),  Design Load: HS 20,  Features Intersected: FISHELL ROAD, HONEOYE CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.873,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 49.3m (161.7ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.92m (42.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $4,218,000,  Roadway Improvement Cost: $2,470,000,  Total Project Cost: $6,688,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 331731,  Location: 1 MI SW OF RUSH (Lat: 42.985792,  Lng: -77.664967),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 799 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,119 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: TRIB HONEOYE CRK,  Facility Carried by Structure: RUSH - WEST RUSH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.170,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 80.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $455,000,  Roadway Improvement Cost: $267,000,  Total Project Cost: $722,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331789,  Location: 3 MI SW OF RUSH (Lat: 42.977806,  Lng: -77.698967),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 1,250 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,304 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: HONEOYE CREEK,  Facility Carried by Structure: EAST RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.181,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.8m (120.7ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,377,000,  Roadway Improvement Cost: $806,000,  Total Project Cost: $2,183,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 337079,  Location: 1.8 m E. of I-390 (Lat: 42.947208,  Lng: -77.661656),  Route carried "on" structure: County highway ,  Year Built: 2011,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,426 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,530 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: HONEOYE CREEK TRI,  Facility Carried by Structure: Honeoye Falls Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.270,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $228,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106904,  Location: 0.2MI.W.JCT.RTS. 251 & 15 (Lat: 43.003039,  Lng: -77.669294),  Route carried "under" structure: Interstate 390,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 28,103 (year 2002),  Features Intersected: 390I390I43031047, RTE I3,  Facility Carried by Structure: RTE 251
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 7.675,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.1m (144.7ft)

Find on map >>   Show street view

Structure Number: 106905,  Location: JCT SH 15 & I390 (Lat: 43.006417,  Lng: -77.666644),  Route carried "under" structure: Interstate 390,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 27,881 (year 2015),  Features Intersected: 390I390I43031050 NB, RTE,  Facility Carried by Structure: RTE 15
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 7.723,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.9m (190.0ft)

Find on map >>   Show street view

Structure Number: 1069061,  Location: 2 MILES South OF THRUWAY (Lat: 43.017789,  Lng: -77.659711),  Route carried "under" structure: Other road ,  Year Built: 1977,  Structure Length: 0. m,  Features Intersected: RUSH-HEN.TN LN RD,  Facility Carried by Structure: RTE I390
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 1069062,  Location: 2 MILES South OF THRUWAY (Lat: 43.017792,  Lng: -77.659247),  Route carried "under" structure: Other road ,  Year Built: 1977,  Structure Length: 0. m,  Features Intersected: RUSH-HEN.TN LN RD,  Facility Carried by Structure: RTE I390
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 3.990,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 107028,  Location: 0.3 MI S JCT RT 15 & I390 (Lat: 42.947761,  Lng: -77.696533),  Route carried "under" structure: Interstate 390,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 15,000 (year 1981),  Features Intersected: 390I390I43031006 NB, RTE,  Facility Carried by Structure: HONEOYE FALLS RD
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.3m (138.8ft)

Find on map >>   Show street view

Structure Number: 107029,  Location: JCT OF RTS 15 & I-390 (Lat: 42.949728,  Lng: -77.697339),  Route carried "under" structure: Interstate 390,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 28,103 (year 2002),  Features Intersected: 390I390I43031007 SB, RTE,  Facility Carried by Structure: RTE 15
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.113,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: 1070301,  Location: 2 MI N JCT SH 15 & I390 (Lat: 42.978667,  Lng: -77.683403),  Route carried "under" structure: County highway ,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 400 (year 2016),  Truck Traffic: 8%,  Features Intersected: CR65-RUSH W RH RD,  Facility Carried by Structure: RTE I390
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 1070302,  Location: 2 MI N JCT SH 15 & I390 (Lat: 42.978789,  Lng: -77.682819),  Route carried "under" structure: County highway ,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 400 (year 2016),  Truck Traffic: 8%,  Features Intersected: CR65-RUSH W RH RD,  Facility Carried by Structure: RTE I390
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 1.335,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 1070311,  Location: 1 MI S JCT RTS 251 & I390 (Lat: 42.990725,  Lng: -77.679775),  Route carried "under" structure: Other road ,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 15,000 (year 1981),  Features Intersected: FISHELL ROAD, HONEOYE CR,  Facility Carried by Structure: RTE I390
Minimum Vertical Clearance: 6.63m (21.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.3m (161.7ft)

Find on map >>   Show street view

Structure Number: 1070312,  Location: 1 MI S JCT RTS 251 & I390 (Lat: 42.990644,  Lng: -77.679214),  Route carried "under" structure: Other road ,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 15,000 (year 1981),  Features Intersected: FISHELL ROAD, HONEOYE CR,  Facility Carried by Structure: RTE I390
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.3m (161.7ft)

Discuss Rush, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.