Bridge Statistics for Sand Lake, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 49ft / 14.7mTotal length
  • $6,701,000Total costs
  • 41,058Total average daily traffic
  • 3,094Total average daily truck traffic
  • 50,391Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sand Lake
  • No street view available for this location

New bridges in Sand Lake, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 31950-1959
  • 31990-1999
  • 32000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Sand Lake, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 20.0%Very good
  • 30.0%Good
  • 20.0%Satisfactory
  • 10.0%Fair
  • 10.0%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Excellent
  • 15.4%Very good
  • 30.8%Good
  • 15.4%Satisfactory
  • 7.7%Fair
  • 23.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.4%Excellent
  • 23.1%Good
  • 23.1%Satisfactory
  • 23.1%Fair
  • 15.4%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.4%Good
  • 46.2%Satisfactory
  • 30.8%Fair
  • 7.7%Poor
Find on map >>   Show street view

Structure Number: 102534,  Location: 0.2 MI E JCT RTS 43 & 150 (Lat: 42.645328,  Lng: -73.604956),  Route carried "on" structure: State highway 43,  Year Built: 1998,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 10,129 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 12,304 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WYNANTSKILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.008,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $566,000,  Roadway Improvement Cost: $332,000,  Total Project Cost: $898,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 102535,  Location: 0.3 MI E JCT RTS 43 & 150 (Lat: 42.645736,  Lng: -73.603425),  Route carried "on" structure: State highway 43,  Year Built: 1998,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 10,129 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 12,304 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WYNANTSKILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.137,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $554,000,  Roadway Improvement Cost: $324,000,  Total Project Cost: $878,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 102536,  Location: 0.6 MI E JCT RTS 43 & 150 (Lat: 42.646494,  Lng: -73.598317),  Route carried "on" structure: State highway 43,  Year Built: 1998,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 10,129 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 12,304 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WYNANTSKILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.603,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $531,000,  Roadway Improvement Cost: $311,000,  Total Project Cost: $842,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 102537,  Location: RTE 66 AT SAND LAKE (Lat: 42.636942,  Lng: -73.539833),  Route carried "on" structure: State highway 43,  Year Built: 2004,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,567 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,677 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Horse Heaven Brk
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.977,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.6m (31.5ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $343,000,  Roadway Improvement Cost: $201,000,  Total Project Cost: $543,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220182,  Location: IN AVERILL PARK (Lat: 42.633106,  Lng: -73.552950),  Route carried "on" structure: Other road ,  Year Built: 1920,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 144 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 202 (year 2040),  Features Intersected: WYNANTS KILL,  Facility Carried by Structure: JOHNNY CAKE LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 50.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 14.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $71,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $112,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220196,  Location: 1 MI.N.OF WEST SAND LAKE (Lat: 42.657681,  Lng: -73.612139),  Route carried "on" structure: Other road ,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 341 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 477 (year 2036),  Features Intersected: WYNANTS KILL,  Facility Carried by Structure: STOP 13 ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Serious,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 69.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $231,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $367,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220198,  Location: 1.1 MI.E.OF WEST SAND LK. (Lat: 42.637547,  Lng: -73.578850),  Route carried "on" structure: Other road ,  Year Built: 1938,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 840 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,176 (year 2037),  Features Intersected: WYNANTS KILL,  Facility Carried by Structure: THAIS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 27.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $345,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220199,  Location: 1.9 MI.SW.OF SAND LAKE (Lat: 42.623519,  Lng: -73.571181),  Route carried "on" structure: Other road ,  Year Built: 1950,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 677 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 948 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: WYNANTS KILL,  Facility Carried by Structure: GARNER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.577,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $258,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $408,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2202,  Location: 2.2 MILES SW OF SAND LAKE (Lat: 42.614547,  Lng: -73.567394),  Route carried "on" structure: Other road ,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 837 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,217 (year 2040),  Features Intersected: BURDEN LAKE,  Facility Carried by Structure: FIRST DYKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 16.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $322,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330374,  Location: .1 MI NE OF SAND LAKE (Lat: 42.638064,  Lng: -73.539100),  Route carried "on" structure: County highway ,  Year Built: 2021,  Status: Temporarily open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,656 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,318 (year 2036),  Design Load: HS 20,  Features Intersected: HORSE HEAVEN BRK,  Facility Carried by Structure: TABORTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Satisfactory,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $158,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $251,000 ( Estimate for 2021),  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330389,  Location: IN AVERILL PARK (Lat: 42.633208,  Lng: -73.552639),  Route carried "on" structure: County highway ,  Year Built: 2012,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 1,515 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,874 (year 2040),  Design Load: HL 93,  Features Intersected: WYNANTS KILL,  Facility Carried by Structure: EASTERN UNION TUR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.363,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $214,000,  Total Project Cost: $581,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33039,  Location: 1.2 MI SW OF SAND LAKE (Lat: 42.628128,  Lng: -73.559344),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,047 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,295 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WYNANTS KILL,  Facility Carried by Structure: BURDEN LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.245,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.0m (29.5ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $336,000,  Roadway Improvement Cost: $197,000,  Total Project Cost: $532,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 330404,  Location: 1.4 MI SW OF SAND LAKE (Lat: 42.627492,  Lng: -73.561231),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,047 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,295 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WYNANTS KILL,  Facility Carried by Structure: BURDEN LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.068,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $392,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $622,000 ( Estimate for 2021)