Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Sappington, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 118ft / 35.8mTotal length
  • 497,828Total average daily traffic
  • 57,390Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sappington
  • No street view available for this location

New bridges in Sappington, MO - historical statistics
  • New bridges - historical statistics
  • 71960-1969
  • 41990-1999
Reconstructed bridges in Sappington, MO - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 11990-1999
Average Bridge Daily Traffic in Sappington, MO
Average Bridge Truck Traffic in Sappington, MO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 60.0%Satisfactory
  • 40.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Good
  • 20.0%Satisfactory
  • 60.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 60.0%Satisfactory
  • 40.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 80.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 15628,  Location: S 20 T 44 N R 6 E (Lat: 38.538889,  Lng: -90.366619),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Posted for load,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 913 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,233 (year 2040),  Features Intersected: SAPPINGTON CR,  Facility Carried by Structure: BRIARSTONE DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28135,  Location: S 29 T 44 N R 6 E (Lat: 38.515575,  Lng: -90.375636),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 808 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,091 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BR OF MATTESE CR,  Facility Carried by Structure: GREGORY CT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 82.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 4314,  Location: S 3112 T 55 N R 6 E (Lat: 38.515522,  Lng: -90.380247),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 8.44m (27.69ft),  Average Daily Traffic: 11,280 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 15,792 (year 2041),  Design Load: HS 20,  Features Intersected: IS 270,  Facility Carried by Structure: SAPPINGTON RD S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.272,  Lanes on structure: 3,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.3m (119.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.8m (61.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 71.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 438,  Location: S 26 T 44 N R 6 E (Lat: 38.523708,  Lng: -90.320844),  Route carried "on" structure: Interstate 55,  Year Built: 1962,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 8.26m (27.10ft),  Average Daily Traffic: 55,851 (year 2021),  Truck Traffic: 18%,  Average Future Daily Traffic: 69,814 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: GRAVOIS CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.724,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 439,  Location: S 26 T 44 N R 6 E (Lat: 38.523486,  Lng: -90.320758),  Route carried "on" structure: Interstate 55,  Year Built: 1962,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 7.99m (26.21ft),  Average Daily Traffic: 52,583 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 65,729 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: GRAVOIS CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 319.835,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 827,  Location: S 3117 T 44 N R 6 E (Lat: 38.525161,  Lng: -90.398667),  Route carried "on" structure: State highway 30,  Year Built: 1966,  Year Reconstructed: 1996,  Status: Posted for load,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 37,363 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 52,308 (year 2041),  Design Load: HS 20,  Features Intersected: IS 270
Minimum Vertical Clearance: 6.45m (21.16ft),  Kilometerpoint: 65.692,  Lanes on structure: 10,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 41.5m (136.2ft),  Skew: 23 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 44.5m (146.0ft),  Out-to-Out Width: 45.3m (148.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 956,  Location: S 1988 T 44 N R 6 E (Lat: 38.514364,  Lng: -90.369692),  Route carried "on" structure: State highway 21,  Year Built: 1967,  Status: Open,  Structure Length: 0.97m (3.18ft),  Average Daily Traffic: 24,914 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 34,880 (year 2041),  Design Load: HS 20,  Features Intersected: MATTESE CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.607,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 87.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 4314,  Location: S 3112 T 55 N R 6 E (Lat: 38.515522,  Lng: -90.380247),  Route carried "under" structure: Interstate 270,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 72,813 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 270,  Facility Carried by Structure: SAPPINGTON RD S
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 53.297,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.3m (119.1ft)

Find on map >>   Show street view

Structure Number: 4314,  Location: S 3112 T 55 N R 6 E (Lat: 38.515522,  Lng: -90.380247),  Route carried "under" structure: Interstate 270,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 84,245 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 270,  Facility Carried by Structure: SAPPINGTON RD S
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 4.318,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.3m (119.1ft)

Find on map >>   Show street view

Structure Number: 827,  Location: S 3117 T 44 N R 6 E (Lat: 38.525161,  Lng: -90.398667),  Route carried "under" structure: Interstate 270,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 84,245 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 270,  Facility Carried by Structure: MO 30 E
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 6.268,  Lanes on structure: 10,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 827,  Location: S 3117 T 44 N R 6 E (Lat: 38.525161,  Lng: -90.398667),  Route carried "under" structure: Interstate 270,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 72,813 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 270,  Facility Carried by Structure: MO 30 E
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 51.316,  Lanes on structure: 10,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Discuss Sappington, Missouri (MO) on our hugely popular Missouri forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.