Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Satsuma, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 89ft / 27.2mTotal length
  • $12,151,000Total costs
  • 88,865Total average daily traffic
  • 8,776Total average daily truck traffic
  • 132,700Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Satsuma
  • No street view available for this location

New bridges in Satsuma, AL - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 31960-1969
  • 41980-1989
  • 22000-2009
  • 22010-2019
  • 12020-2022
Average Bridge Daily Traffic in Satsuma, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Very good
  • 33.3%Good
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 50.0%Good
  • 16.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Very good
  • 16.7%Good
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 50.0%Good
  • 16.7%Satisfactory
  • 8.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 42.9%Good
  • 42.9%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 5853,  Location: 0.9 MI N SR 213 (Lat: 30.835731,  Lng: -88.066511),  Route carried "on" structure: US 43,  Year Built: 1957,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 14,144 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 21,216 (year 2039),  Design Load: H 20,  Features Intersected: BURLINGTON NORTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.877,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 26 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.70m (28.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,638,000,  Roadway Improvement Cost: $364,000,  Total Project Cost: $4,002,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7055,  Location: 0.5 MI E OLD HWY 43 (Lat: 30.860000,  Lng: -88.046667),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 914 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,234 (year 2039),  Design Load: H 15,  Features Intersected: SWEET GUM CREEK,  Facility Carried by Structure: JUNIPER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 53.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $195,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $215,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9274,  Location: 1.6 MI S US 43 (Lat: 30.863433,  Lng: -88.067625),  Route carried "on" structure: Interstate 65,  Year Built: 1967,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 22,126 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 33,189 (year 2038),  Design Load: HS 20,  Features Intersected: STEELE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.727,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $631,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $694,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9275,  Location: 1.6 MI S US 43 (Lat: 30.863114,  Lng: -88.067253),  Route carried "on" structure: Interstate 65,  Year Built: 1967,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 22,126 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 33,189 (year 2038),  Design Load: HS 20,  Features Intersected: STEELE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.727,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $669,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $736,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13746,  Location: 0.15 MI S JUNIPER AVENUE (Lat: 30.860000,  Lng: -88.055000),  Route carried "on" structure: City street 19,  Year Built: 1986,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 323 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 436 (year 2039),  Design Load: HS 20,  Features Intersected: STEEL CREEK,  Facility Carried by Structure: OLD HWY 43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.699,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $706,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $777,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14002,  Location: .3 MI N. of CARL AVE. (Lat: 30.840000,  Lng: -88.048333),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 377 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 497 (year 2039),  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: CEDAR STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.219,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $362,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $398,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14003,  Location: 450 FT N CARL AVE (Lat: 30.840000,  Lng: -88.046667),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 324 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 426 (year 2039),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: DANIEL DRIVE
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.089,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $325,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $358,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14004,  Location: 430FT. N of CARL AVE (Lat: 30.840000,  Lng: -88.043333),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 324 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 426 (year 2039),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: CATHERINE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.079,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $436,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19929,  Location: 0.9 MI. E. OF OLD HWY 43 (Lat: 30.851667,  Lng: -88.046667),  Route carried "on" structure: City street ,  Year Built: 2007,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 396 (year 2019),  Average Future Daily Traffic: 534 (year 2039),  Design Load: HS 20,  Features Intersected: SPAT CREEK,  Facility Carried by Structure: EAST ORANGE AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.199,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 69.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $281,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20299,  Location: 1.3 MILES N. OF BAKER RD (Lat: 30.864300,  Lng: -88.073100),  Route carried "on" structure: City street ,  Year Built: 2008,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 52 (year 2019),  Average Future Daily Traffic: 69 (year 2039),  Design Load: HS 20,  Features Intersected: DRAINAGE,  Facility Carried by Structure: SOUTH SERVICE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 0.9m (3.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $458,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $504,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21063,  Location: _1.2 m. w od US 43 (Lat: 30.848333,  Lng: -88.080000),  Route carried "on" structure: City street ,  Year Built: 2016,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 843 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,110 (year 2040),  Design Load: HS 20,  Features Intersected: _Hartley Branch,  Facility Carried by Structure: _Baker Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.599,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 21274,  Location: 1 MI S JCT I-65 (Lat: 30.859500,  Lng: -88.053400),  Route carried "on" structure: US 43,  Year Built: 2021,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 13,458 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 20,187 (year 2039),  Design Load: HS 20,  Features Intersected: STEELE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.819,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 81.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 62.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.58m (15.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,507,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $1,658,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21275,  Location: 1 MI S JCT I-65 (Lat: 30.859600,  Lng: -88.053600),  Route carried "on" structure: US 43,  Year Built: 2019,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 13,458 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 20,187 (year 2039),  Design Load: HS 20,  Features Intersected: STEELE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.819,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 58.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.58m (15.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,318,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,450,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Satsuma, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.