Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Schuyler, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 32Number of bridges
  • 226ft / 68.8mTotal length
  • $34,295,000Total costs
  • 256,573Total average daily traffic
  • 43,296Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Schuyler
  • No street view available for this location

New bridges in Schuyler, NY - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 21920-1929
  • 31940-1949
  • 181950-1959
  • 11980-1989
  • 52000-2009
  • 22010-2019
Reconstructed bridges in Schuyler, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 51980-1989
  • 01990-1999
  • 32000-2009
Average Bridge Daily Traffic in Schuyler, NY
Average Bridge Truck Traffic in Schuyler, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.9%Excellent
  • 11.8%Very good
  • 23.5%Good
  • 11.8%Satisfactory
  • 23.5%Fair
  • 23.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 23.5%Excellent
  • 11.8%Very good
  • 23.5%Good
  • 11.8%Satisfactory
  • 29.4%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Excellent
  • 29.4%Very good
  • 17.6%Good
  • 11.8%Satisfactory
  • 17.6%Fair
  • 17.6%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.6%Very good
  • 5.6%Good
  • 16.7%Satisfactory
  • 38.9%Fair
  • 33.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 12.5%Good
  • 12.5%Satisfactory
  • 62.5%Fair
  • 12.5%Poor
Find on map >>   Show street view

Structure Number: 100236,  Location: IN SCHUYLER (Lat: 43.103436,  Lng: -75.161250),  Route carried "on" structure: State highway 5,  Year Built: 1941,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 7,829 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 7,865 (year 2040),  Design Load: HS 20,  Features Intersected: BUDLONG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $371,000,  Roadway Improvement Cost: $217,000,  Total Project Cost: $588,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100237,  Location: IN WEST SCHUYLER (Lat: 43.094108,  Lng: -75.140542),  Route carried "on" structure: State highway 5,  Year Built: 1941,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 5,187 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,211 (year 2040),  Design Load: HS 20,  Features Intersected: KNAPP BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.687,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $302,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $479,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100238,  Location: JCT I90 & SH 5 (Lat: 43.084828,  Lng: -75.122642),  Route carried "on" structure: State highway 5,  Year Built: 1954,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 10.03m (32.91ft),  Average Daily Traffic: 5,187 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,211 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 90IX EB, RTE I90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.441,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Toll Authority,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.02m (32.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,137,000,  Roadway Improvement Cost: $1,252,000,  Total Project Cost: $3,389,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100239,  Location: 5.6 MI W JCT RTS 5 & 51 (Lat: 43.076264,  Lng: -75.112292),  Route carried "on" structure: State highway 5,  Year Built: 1929,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 5,187 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,211 (year 2040),  Design Load: HS 20,  Features Intersected: STERLING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.792,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Bridge Improvement Cost: $867,000,  Roadway Improvement Cost: $508,000,  Total Project Cost: $1,374,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10024,  Location: 3.5 MI W JCT SH 5 & CR 5 (Lat: 43.057222,  Lng: -75.080156),  Route carried "on" structure: State highway 5,  Year Built: 1940,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 5,187 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,211 (year 2040),  Design Load: HS 20,  Features Intersected: BRIDENBECKER CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.139,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 74.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $213,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $338,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330812,  Location: 1.0 MI NE OF W SCHUYLER (Lat: 43.108758,  Lng: -75.139992),  Route carried "on" structure: County highway ,  Year Built: 1926,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 705 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 987 (year 2037),  Features Intersected: WOOD CREEK,  Facility Carried by Structure: CR243 COSBY MANOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $111,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $175,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330813,  Location: 3.4 MI E OF W SCHUYLER (Lat: 43.090956,  Lng: -75.086506),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 303 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 424 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: STERLING CREEK,  Facility Carried by Structure: CR53 SHORTLOTS ROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.553,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.0m (98.4ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Fair,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $598,000,  Roadway Improvement Cost: $350,000,  Total Project Cost: $948,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330814,  Location: 5 MILES N OF FRANKFORT (Lat: 43.097267,  Lng: -75.081856),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 71 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 99 (year 2037),  Design Load: HL 93,  Features Intersected: STERLING CREEK,  Facility Carried by Structure: CR180 BUSH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Fair,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $533,000,  Roadway Improvement Cost: $312,000,  Total Project Cost: $845,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 330815,  Location: 6 MI N OF FRANKFORT (Lat: 43.107778,  Lng: -75.072939),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 131 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 183 (year 2039),  Design Load: H 20,  Features Intersected: STERLING CREEK,  Facility Carried by Structure: CR197 MOWERS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.464,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $522,000,  Roadway Improvement Cost: $305,000,  Total Project Cost: $827,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330816,  Location: 3.7 MI NE OF W SCHUYLER (Lat: 43.122622,  Lng: -75.086267),  Route carried "on" structure: County highway ,  Year Built: 2013,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 99 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 139 (year 2037),  Design Load: HL 93,  Features Intersected: STERLING CREEK,  Facility Carried by Structure: HAWTHORNE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.510,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Fair,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.22m (7.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $380,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $603,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 442305,  Location: E SCHY OVER BARGE C (Lat: 43.051639,  Lng: -75.076103),  Route carried "on" structure: Other road ,  Year Built: 1910,  Year Reconstructed: 1955,  Status: Posted for load,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 12 (year 2016),  Average Future Daily Traffic: 17 (year 2036),  Design Load: H 15,  Features Intersected: ERIE BARGE CANAL,  Facility Carried by Structure: MOSS ROAD
Minimum Vertical Clearance: 4.21m (13.81ft),  Kilometerpoint: 0.274,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Navigation Control: Yes ( Vertical Clearance: 6.7m (22.0ft), Horizontal Clearance: 13.1m (43.0ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.1m (148.0ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 3.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 2.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $2,638,000,  Roadway Improvement Cost: $1,545,000,  Total Project Cost: $4,183,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 442306,  Location: 1.1MI.E-W.CL.HERKIMER CO. (Lat: 43.093883,  Lng: -75.155097),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 4,993 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,065 (year 2040),  Design Load: HS 20,  Features Intersected: N Y S BARGE CANAL,  Facility Carried by Structure: DYKE RD CO RD 37
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.255,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 31.6m (103.7ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.32m (30.58ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $1,931,000,  Roadway Improvement Cost: $1,131,000,  Total Project Cost: $3,062,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5516051,  Location: .3 MI E OF EAST SCHUYLER (Lat: 43.055564,  Lng: -75.067297),  Route carried "on" structure: Interstate 90,  Year Built: 2004,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 11,303 (year 2014),  Truck Traffic: 7%,  Design Load: HS 25 or greater,  Features Intersected: WATKINS RD CR 211
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 361.623,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $951,000,  Roadway Improvement Cost: $557,000,  Total Project Cost: $1,508,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 5516052,  Location: .3 MI E OF EAST SCHUYLER (Lat: 43.055342,  Lng: -75.067467),  Route carried "on" structure: Interstate 90,  Year Built: 2004,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 9,611 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 11,074 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WATKINS RD CR 211
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.040,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $951,000,  Roadway Improvement Cost: $557,000,  Total Project Cost: $1,508,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 551606,  Location: 7.4 MI E I-90 INT 31 (Lat: 43.061683,  Lng: -75.077939),  Route carried "on" structure: Interstate 90,  Year Built: 1954,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 19,222 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 22,147 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BRIDENBAKER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.930,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 33.8m (110.9ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $829,000,  Roadway Improvement Cost: $486,000,  Total Project Cost: $1,315,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 5516071,  Location: 7.4 MI E RTE I-90 INT 31 (Lat: 43.062389,  Lng: -75.078675),  Route carried "on" structure: Interstate 90,  Year Built: 1954,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 11,303 (year 2014),  Truck Traffic: 7%,  Design Load: HS 20+Mod,  Features Intersected: CR 53, Millers Grove Roa
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 362.813,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $829,000,  Roadway Improvement Cost: $485,000,  Total Project Cost: $1,314,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 5516072,  Location: 7.4 MI E RTE I-90 INT 31 (Lat: 43.062200,  Lng: -75.078883),  Route carried "on" structure: Interstate 90,  Year Built: 1954,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 9,611 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 11,074 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CR 53, Millers Grove Roa
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.833,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $813,000,  Roadway Improvement Cost: $476,000,  Total Project Cost: $1,290,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 551608,  Location: 1.8 MI NE OF E. SCHUYLER (Lat: 43.072417,  Lng: -75.097661),  Route carried "on" structure: County highway ,  Year Built: 1954,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 219 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 307 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: CR 11 CARDER LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.68m (28.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,299,000,  Roadway Improvement Cost: $761,000,  Total Project Cost: $2,060,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5516091,  Location: 2.5 MI NE OF E. SCHUYLER (Lat: 43.078883,  Lng: -75.109003),  Route carried "on" structure: Interstate 90,  Year Built: 1954,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 11,303 (year 2014),  Truck Traffic: 7%,  Design Load: HS 20+Mod,  Features Intersected: STERLING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 365.903,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,168,000,  Roadway Improvement Cost: $684,000,  Total Project Cost: $1,851,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 5516092,  Location: 2.5 MI NE OF E. SCHUYLER (Lat: 43.078719,  Lng: -75.109256),  Route carried "on" structure: Interstate 90,  Year Built: 1954,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 9,611 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 11,074 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: STERLING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.760,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,168,000,  Roadway Improvement Cost: $684,000,  Total Project Cost: $1,851,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 55161,  Location: 4.3 MI E RTE I-90 INT 31 (Lat: 43.087008,  Lng: -75.128639),  Route carried "on" structure: Interstate 90,  Year Built: 1954,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 19,222 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 22,147 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BURCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.926,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $425,000,  Roadway Improvement Cost: $249,000,  Total Project Cost: $674,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 551611,  Location: 0.6 MI SW OF W. SCHUYLER (Lat: 43.092681,  Lng: -75.141153),  Route carried "on" structure: Interstate 90,  Year Built: 1954,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 19,222 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 22,147 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: KNAPP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.735,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Poor,  Culverts: Poor,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $410,000,  Roadway Improvement Cost: $240,000,  Total Project Cost: $650,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 551612,  Location: 0.2 MI SE OF W. SCHUYLER (Lat: 43.095617,  Lng: -75.148503),  Route carried "on" structure: Interstate 90,  Year Built: 1954,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 19,222 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 22,147 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: WOODS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.043,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 76.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $486,000,  Roadway Improvement Cost: $285,000,  Total Project Cost: $771,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 551613,  Location: 2.9 MI E RTE I-90 INT 31 (Lat: 43.097111,  Lng: -75.152067),  Route carried "on" structure: County highway ,  Year Built: 1954,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 4,993 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,065 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: DYKE RD CR 37
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.706,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,050,000,  Roadway Improvement Cost: $615,000,  Total Project Cost: $1,665,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 551614,  Location: 0.7 MI NW OF W. SCHUYLER (Lat: 43.102517,  Lng: -75.163069),  Route carried "on" structure: Interstate 90,  Year Built: 1954,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 19,222 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 22,147 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BUDLONG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $648,000,  Roadway Improvement Cost: $379,000,  Total Project Cost: $1,027,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 100238,  Location: JCT I90 & SH 5 (Lat: 43.084828,  Lng: -75.122642),  Route carried "under" structure: Interstate 90,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 12,200 (year 1979),  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: RTE 5
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 367.174,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 5516051,  Location: .3 MI E OF EAST SCHUYLER (Lat: 43.055564,  Lng: -75.067297),  Route carried "under" structure: County highway ,  Year Built: 2004,  Structure Length: 0. m,  Features Intersected: WATKINS RD CR 211,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.6m (38.1ft)

Find on map >>   Show street view

Structure Number: 5516052,  Location: .3 MI E OF EAST SCHUYLER (Lat: 43.055342,  Lng: -75.067467),  Route carried "under" structure: County highway ,  Year Built: 2004,  Structure Length: 0. m,  Features Intersected: WATKINS RD CR 211,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.6m (38.1ft)

Find on map >>   Show street view

Structure Number: 5516071,  Location: 7.4 MI E RTE I-90 INT 31 (Lat: 43.062389,  Lng: -75.078675),  Route carried "under" structure: County highway ,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 160 (year 2018),  Truck Traffic: 10%,  Features Intersected: CR 53, Millers Grove Roa,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 9.670,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 9.8m (32.2ft)

Find on map >>   Show street view

Structure Number: 5516072,  Location: 7.4 MI E RTE I-90 INT 31 (Lat: 43.062200,  Lng: -75.078883),  Route carried "under" structure: County highway ,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 160 (year 2018),  Truck Traffic: 10%,  Features Intersected: CR 53, Millers Grove Roa,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 9.702,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 9.8m (32.2ft)

Find on map >>   Show street view

Structure Number: 551608,  Location: 1.8 MI NE OF E. SCHUYLER (Lat: 43.072417,  Lng: -75.097661),  Route carried "under" structure: Interstate 90,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 22,549 (year 2015),  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: CR 11 CARDER LANE
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 364.728,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 551613,  Location: 2.9 MI E RTE I-90 INT 31 (Lat: 43.097111,  Lng: -75.152067),  Route carried "under" structure: Interstate 90,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 22,549 (year 2015),  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: DYKE RD CR 37
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 369.941,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Discuss Schuyler, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.