Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Shady Grove, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 62ft / 19.2mTotal length
  • $6,792,000Total costs
  • 19,670Total average daily traffic
  • 6,726Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Shady Grove
  • No street view available for this location

New bridges in Shady Grove, OK - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 11960-1969
  • 41970-1979
  • 41980-1989
  • 21990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Shady Grove, OK
Average Bridge Truck Traffic in Shady Grove, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Good
  • 42.9%Satisfactory
  • 42.9%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 28.6%Good
  • 28.6%Satisfactory
  • 42.9%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Good
  • 14.3%Satisfactory
  • 42.9%Fair
  • 28.6%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 46.2%Good
  • 30.8%Satisfactory
  • 15.4%Fair
  • 7.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 14.3%Very good
  • 57.1%Good
  • 14.3%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 6644,  Location: 1.4 E 1.6 S OF HULBERT (Lat: 35.910447,  Lng: -95.118133),  Route carried "on" structure: County highway N4430,  Year Built: 1939,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 60 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 96 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 21.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $246,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6887,  Location: 2.6 S 1.5 E OF HULBERT (Lat: 35.894428,  Lng: -95.115606),  Route carried "on" structure: County highway E0773,  Year Built: 1939,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 29.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.79m (9.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $143,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 14884,  Location: 2.9 N OF SH51 (Lat: 35.956836,  Lng: -95.082811),  Route carried "on" structure: County highway 1115,  Year Built: 1960,  Year Reconstructed: 1989,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 450 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 720 (year 2040),  Design Load: HS 20,  Features Intersected: DOUBLE SPRING CREEK,  Facility Carried by Structure: SHADY GROVE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.653,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 30.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 4.22m (13.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 17993,  Location: 3.6 W MUSKOGEE C/L (Lat: 35.457403,  Lng: -95.406883),  Route carried "on" structure: Interstate 40,  Year Built: 1971,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 5,800 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 9,280 (year 2040),  Design Load: HS 20,  Features Intersected: OLIVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.250,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.4m (112.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 17994,  Location: 3.6 W MUSKOGEE C/L (Lat: 35.456150,  Lng: -95.407011),  Route carried "on" structure: Interstate 40,  Year Built: 1971,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 6,150 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 9,840 (year 2040),  Design Load: HS 20,  Features Intersected: OLIVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.250,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.4m (112.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 18039,  Location: 2.1 W MUSKOGEE C/L (Lat: 35.457486,  Lng: -95.380522),  Route carried "on" structure: Interstate 40,  Year Built: 1971,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 6,150 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 9,840 (year 2040),  Design Load: HS 20,  Features Intersected: N4290 RD UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.664,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.4m (40.7ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.66m (18.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $851,000,  Roadway Improvement Cost: $1,405,000,  Total Project Cost: $2,384,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20722,  Location: 3.2 N 4.5 W TAHLEQUAH (Lat: 35.961569,  Lng: -95.047031),  Route carried "on" structure: County highway 1126C,  Year Built: 1984,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 70 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 112 (year 2040),  Design Load: HS 20,  Features Intersected: DOUBLE SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.505,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 38.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $369,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 21448,  Location: 2.0 N 5.8 W TAHLEQUAH (Lat: 35.959031,  Lng: -95.069553),  Route carried "on" structure: County highway N4458,  Year Built: 1987,  Status: Posted for load,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: DOUBLE SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 16.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.58m (11.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $183,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $290,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 22263,  Location: 0.7 MI S OF THOMPSON COR (Lat: 35.905372,  Lng: -95.082717),  Route carried "on" structure: County highway N4450,  Year Built: 1989,  Status: Posted for load,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: PECAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.79m (15.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $245,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $390,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22719,  Location: 1.S & .9E OF THOMPSON COR (Lat: 35.900706,  Lng: -95.068472),  Route carried "on" structure: County highway 1138C,  Year Built: 1991,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 170 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 272 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.79m (9.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 2272,  Location: 1.S &1.1E OF THOMPSON COR (Lat: 35.900686,  Lng: -95.064719),  Route carried "on" structure: County highway 1138C,  Year Built: 1991,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 170 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 272 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 24814,  Location: 3.5 N & 3.5 W OF TAHLEQUA (Lat: 35.979694,  Lng: -95.029169),  Route carried "on" structure: County highway 1126C,  Year Built: 1989,  Status: Posted for load,  Structure Length: 1.96m (6.43ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: N4480
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.1m (13.5ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 16.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.92m (16.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $400,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27979,  Location: 5.2E TAHLEQ & .6S SH51 (Lat: 35.906908,  Lng: -95.064872),  Route carried "on" structure: County highway N4460,  Year Built: 2006,  Status: Posted for load,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: PECAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.4m (14.4ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.58m (8.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $300,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 30474,  Location: 3.3E;1.8N-SH 51/SH 80 (Lat: 35.958611,  Lng: -95.083889),  Route carried "on" structure: County highway E0730,  Year Built: 2012,  Status: Posted for load,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 240 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.5m (4.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Total Project Cost: $225,000
Find on map >>   Show street view

Structure Number: 18039,  Location: 2.1 W MUSKOGEE C/L (Lat: 35.457486,  Lng: -95.380522),  Route carried "under" structure: County highway 4616C,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Features Intersected: N4290 RD UNDER,  Facility Carried by Structure: I-40 EB
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 45.664,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 12.2m (40.0ft)