Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Shelton, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 32Number of bridges
  • 276ft / 83.7mTotal length
  • $48,635,000Total costs
  • 280,779Total average daily traffic
  • 23,159Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Shelton
  • No street view available for this location

New bridges in Shelton, WA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 21940-1949
  • 31950-1959
  • 121970-1979
  • 31980-1989
  • 41990-1999
  • 32000-2009
  • 12010-2019
  • 22020-2022
Average Bridge Daily Traffic in Shelton, WA
Average Bridge Truck Traffic in Shelton, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 21.1%Very good
  • 36.8%Good
  • 36.8%Satisfactory
  • 5.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.3%Very good
  • 52.6%Good
  • 36.8%Satisfactory
  • 5.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.5%Very good
  • 63.2%Good
  • 21.1%Satisfactory
  • 5.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 52.9%Very good
  • 11.8%Good
  • 17.6%Satisfactory
  • 11.8%Fair
  • 5.9%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Very good
  • 33.3%Good
Find on map >>   Show street view

Structure Number: 451A,  Location: 0.9 N JCT US 101 (Lat: 47.192967,  Lng: -123.098903),  Route carried "on" structure: State highway 3,  Year Built: 1921,  Year Reconstructed: 1966,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 14,627 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 19,717 (year 2039),  Design Load: H 15,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.481,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $877,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $1,754,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 729A,  Location: 2.4 N JCT US 101 (Lat: 47.209222,  Lng: -123.100806),  Route carried "on" structure: State highway 3,  Year Built: 1923,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 16,515 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 22,262 (year 2039),  Features Intersected: GOLDSBOROUGH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.943,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 25.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $524,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,049,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3458A,  Location: 6.6 N JCT US 101 (Lat: 47.248083,  Lng: -123.045417),  Route carried "on" structure: State highway 3,  Year Built: 1948,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 14,799 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,949 (year 2039),  Design Load: HS 20,  Features Intersected: JOHNS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.606,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $525,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,050,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9121A,  Location: 4.5 S JCT SR 102 (Lat: 47.191578,  Lng: -123.115800),  Route carried "on" structure: County highway ,  Year Built: 1972,  Status: Open,  Structure Length: 7.65m (25.10ft),  Average Daily Traffic: 1,207 (year 2002),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,699 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: US 101,  Facility Carried by Structure: W CLOQUALLUM RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.020,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.65m (25.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,506,000,  Roadway Improvement Cost: $301,000,  Total Project Cost: $3,012,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9121B,  Location: 5.7 S JCT SR 102 (Lat: 47.180889,  Lng: -123.099167),  Route carried "on" structure: US 101,  Year Built: 1972,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 17,103 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 23,054 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 561.919,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,126,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $2,251,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9361A,  Location: 2.8 S JCT SR 102 (Lat: 47.215917,  Lng: -123.129139),  Route carried "on" structure: County highway ,  Year Built: 1973,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 1,270 (year 2002),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,350 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: US 101,  Facility Carried by Structure: C ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.950,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.7m (117.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.07m (23.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,485,000,  Roadway Improvement Cost: $297,000,  Total Project Cost: $2,970,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9361B,  Location: 3.1 S JCT SR 102 (Lat: 47.211111,  Lng: -123.128611),  Route carried "on" structure: US 101,  Year Built: 1973,  Status: Open,  Structure Length: 10.30m (33.79ft),  Average Daily Traffic: 17,671 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 23,820 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: CREEK/RR/STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 557.670,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 17.8m (58.4ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,650,000,  Roadway Improvement Cost: $730,000,  Total Project Cost: $7,301,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9361C,  Location: 3.4 S JCT SR 102 (Lat: 47.207028,  Lng: -123.127917),  Route carried "on" structure: US 101,  Year Built: 1973,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 17,671 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 23,820 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: MATLOCK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 558.120,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.31m (20.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,739,000,  Roadway Improvement Cost: $348,000,  Total Project Cost: $3,478,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9361D,  Location: 4.9 S JCT SR 102 (Lat: 47.187703,  Lng: -123.109806),  Route carried "on" structure: US 101,  Year Built: 1973,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 19,468 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 26,242 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 560.760,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.66m (15.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,285,000,  Roadway Improvement Cost: $257,000,  Total Project Cost: $2,570,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 12707A,  Location: 3.5 S JCT SR 3 (Lat: 47.130361,  Lng: -123.099167),  Route carried "on" structure: US 101,  Year Built: 1986,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 22,165 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 29,878 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 108
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 568.935,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 33 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 28.3m (92.8ft),  Out-to-Out Width: 28.5m (93.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $2,049,000,  Roadway Improvement Cost: $410,000,  Total Project Cost: $4,098,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14145A,  Location: 1.7 S JCT SR 102 (Lat: 47.231222,  Lng: -123.128472),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 6,636 (year 2012),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,095 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: US 101,  Facility Carried by Structure: W. KNEELAND BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $840,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $1,680,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17504A,  Location: 5.7 S JCT SR 102 (Lat: 47.181833,  Lng: -123.099000),  Route carried "on" structure: Ramp US 101,  Year Built: 2008,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 1,290 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,738 (year 2039),  Design Load: HL 93,  Features Intersected: WETLAND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $928,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $1,856,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18849A,  Location: 7.6 E GRAYS HBR CO (Lat: 47.130639,  Lng: -123.100056),  Route carried "on" structure: State highway 108,  Year Built: 2016,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 11,498 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 15,499 (year 2039),  Design Load: HL 93,  Features Intersected: LITTLE SKOOKUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.135,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2018,  Bridge Improvement Cost: $486,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $973,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 19018A,  Location: 3.6 S JCT SR 102 (Lat: 47.205997,  Lng: -123.129089),  Route carried "on" structure: County highway 101,  Year Built: 2020,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,000 (year 2040),  Design Load: HL 93,  Features Intersected: COFFEE CREEK,  Facility Carried by Structure: SHELTON-MATLOCK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $266,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $532,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 81698,  Location: 0.48 N JCT 20900 (Lat: 47.221667,  Lng: -123.028333),  Route carried "on" structure: County highway 23500,  Year Built: 1950,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 257 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 500 (year 2041),  Design Load: HS 15,  Features Intersected: CAMPBELL CREEK,  Facility Carried by Structure: Agate Loop Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,566,000,  Roadway Improvement Cost: $313,000,  Total Project Cost: $3,131,000 ( Estimate for 2025),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 81924,  Location: 4.85 W JCT SR 3 (Lat: 47.215000,  Lng: -123.180000),  Route carried "on" structure: County highway 90100,  Year Built: 1956,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 1,777 (year 2017),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,300 (year 2040),  Design Load: HS 20,  Features Intersected: GOLDSBOROUGH CREEK,  Facility Carried by Structure: Shelton Matlock Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 25.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,006,000,  Roadway Improvement Cost: $401,000,  Total Project Cost: $4,013,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 82323,  Location: 0.33 S JCT SHELTONMATLOC (Lat: 47.222306,  Lng: -123.226139),  Route carried "on" structure: County highway 4670,  Year Built: 1958,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 191 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 314 (year 2040),  Design Load: HS 15,  Features Intersected: NO. FK. GOLDSBOROUGH CK.,  Facility Carried by Structure: Little Egypt Rd.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $760,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $1,520,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83219,  Location: 1.38 W JCT SR 3 (Lat: 47.210000,  Lng: -123.123333),  Route carried "on" structure: County highway 90100,  Year Built: 1977,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 8,200 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,000 (year 2040),  Design Load: HS 20,  Features Intersected: GOLDSBOROUGH CREEK,  Facility Carried by Structure: Shelton Matlock Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Serious,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8379,  Location: 1.45 E JCT SR 3 (Lat: 47.196667,  Lng: -123.061667),  Route carried "on" structure: County highway 91100,  Year Built: 1978,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 4,134 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 7,466 (year 2041),  Design Load: HS 20,  Features Intersected: BUR. NOR. RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 8.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000 ( Estimate for 2075),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 84933,  Location: 00.1 S RAILROAD AVE (Lat: 47.211667,  Lng: -123.107806),  Route carried "on" structure: City street 1165,  Year Built: 1976,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 6,000 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,000 (year 2037),  Design Load: HS 20,  Features Intersected: GOLDSBROUGH CREEK,  Facility Carried by Structure: 7TH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.29m (7.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $80,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $100,000 ( Estimate for 2050),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8564,  Location: 00.23 E JCT 09900 (Lat: 47.226972,  Lng: -123.221361),  Route carried "on" structure: County highway 90100,  Year Built: 1988,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,777 (year 2017),  Truck Traffic: 20%,  Average Future Daily Traffic: 5,000 (year 2037),  Design Load: H 20,  Features Intersected: NO. FORK GOLDSBOROUGH CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $500,000 ( Estimate for 2040)
Find on map >>   Show street view

Structure Number: 86009,  Location: 0.65 N JCT 20900 (Lat: 47.223056,  Lng: -123.012722),  Route carried "on" structure: County highway 23910,  Year Built: 1993,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 3,036 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,663 (year 2037),  Design Load: HS 20,  Features Intersected: CAMPBELL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,094,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 86011,  Location: 2.68 N JCT SR 3 (Lat: 47.279056,  Lng: -123.045333),  Route carried "on" structure: County highway 52210,  Year Built: 1993,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,783 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,000 (year 2037),  Design Load: HS 20,  Features Intersected: CRANBERRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $40,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $50,000 ( Estimate for 2075)
Find on map >>   Show street view

Structure Number: 87098,  Location: 0.23 mi So. 10000 (Lat: 47.157250,  Lng: -123.169917),  Route carried "on" structure: County highway 10510,  Year Built: 2003,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 36 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 50 (year 2037),  Design Load: HS 20,  Features Intersected: Gosnell Creek,  Facility Carried by Structure: Bolling Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $760,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $1,520,000 ( Estimate for 2014),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 89185,  Location: 2.35 E JCT 90100 (Lat: 47.182344,  Lng: -123.154747),  Route carried "on" structure: Spur County highway 6110,  Year Built: 2020,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 187 (year 2017),  Average Future Daily Traffic: 250 (year 2040),  Design Load: HL 93,  Features Intersected: Coffee Creek,  Facility Carried by Structure: Deegan Road West
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,064,000,  Roadway Improvement Cost: $213,000,  Total Project Cost: $2,128,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: KV,  Location: 3.3 N JCT US 101 (Lat: 47.214000,  Lng: -123.090028),  Route carried "under" structure: State highway 3,  Year Built: 1944,  Structure Length: 0. m,  Average Daily Traffic: 10,433 (year 2019),  Truck Traffic: 6%,  Features Intersected: STATE ROUTE 3,  Facility Carried by Structure: NP RR
Minimum Vertical Clearance: 6.71m (22.01ft),  Kilometerpoint: 5.391,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 9121A,  Location: 4.5 S JCT SR 102 (Lat: 47.191578,  Lng: -123.115800),  Route carried "under" structure: US 101,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 19,468 (year 2019),  Truck Traffic: 9%,  Features Intersected: US 101,  Facility Carried by Structure: W CLOQUALLUM RD
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 560.164,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 9121B,  Location: JCT US 101 (Lat: 47.180889,  Lng: -123.099167),  Route carried "under" structure: State highway 3,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 8,054 (year 2019),  Truck Traffic: 8%,  Features Intersected: SR 3,  Facility Carried by Structure: US 101
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 9361A,  Location: 2.8 S JCT SR 102 (Lat: 47.215917,  Lng: -123.129139),  Route carried "under" structure: US 101,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 17,671 (year 2019),  Truck Traffic: 8%,  Features Intersected: US 101,  Facility Carried by Structure: C ST
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 557.123,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 12707A,  Location: 7.7 E GRAYS HBR CO (Lat: 47.130361,  Lng: -123.099167),  Route carried "under" structure: State highway 108,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 11,498 (year 2019),  Truck Traffic: 8%,  Features Intersected: SR 108,  Facility Carried by Structure: US 101
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 19.248,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 14145A,  Location: 1.7 S JCT SR 102 (Lat: 47.231222,  Lng: -123.128472),  Route carried "under" structure: US 101,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 12,924 (year 2019),  Truck Traffic: 8%,  Features Intersected: US 101,  Facility Carried by Structure: W. KNEELAND BLVD
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 555.417,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: UCW0033,  Location: 4.0 N JCT US 101 (Lat: 47.220278,  Lng: -123.078611),  Route carried "under" structure: State highway 3,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 10,433 (year 2019),  Truck Traffic: 6%,  Features Intersected: SR 3,  Facility Carried by Structure: GRAVEL CHUTE
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 6.518,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Truss - Thru,  Length of Maximum Span: 30.5m (100.1ft)

Discuss Shelton, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.