Bridge Statistics for Shoreline, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 230ft / 70.3mTotal length
  • $61,175,000Total costs
  • 1,541,323Total average daily traffic
  • 70,767Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Shoreline
  • No street view available for this location

New bridges in Shoreline, WA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 151960-1969
  • 41990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Shoreline, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31970-1979
  • 01980-1989
  • 21990-1999
Average Bridge Daily Traffic in Shoreline, WA
Average Bridge Truck Traffic in Shoreline, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 84.6%Good
  • 7.7%Satisfactory
  • 7.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 76.9%Good
  • 15.4%Satisfactory
  • 7.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 92.3%Good
  • 7.7%Fair
Find on map >>   Show street view

Structure Number: 7071A,  Location: 3.1 N JCT SR 523 (Lat: 47.777389,  Lng: -122.317750),  Route carried "on" structure: Interstate 5,  Year Built: 1963,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 81,740 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 115,416 (year 2039),  Design Load: HS 20,  Features Intersected: SR 104 / NE 205TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 286.061,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,800,000,  Roadway Improvement Cost: $560,000,  Total Project Cost: $5,600,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7071B,  Location: 3.1 N JCT SR 523 (Lat: 47.777389,  Lng: -122.318056),  Route carried "on" structure: Interstate 5,  Year Built: 1963,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 81,740 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 115,416 (year 2039),  Design Load: HS 20,  Features Intersected: SR 104 / NE 205TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 286.061,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 20.4m (66.9ft),  Out-to-Out Width: 21.2m (69.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 34.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.73m (18.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,707,000,  Roadway Improvement Cost: $541,000,  Total Project Cost: $5,414,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7071C,  Location: 3.1 N JCT SR 523 (Lat: 47.777361,  Lng: -122.317500),  Route carried "on" structure: Ramp Interstate 5,  Year Built: 1963,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 7,674 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,835 (year 2039),  Design Load: HS 20,  Features Intersected: SR 104
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.933,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.28m (20.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,813,000,  Roadway Improvement Cost: $363,000,  Total Project Cost: $3,626,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7270C,  Location: 0.5 N JCT SR 523 (Lat: 47.740989,  Lng: -122.328722),  Route carried "on" structure: Interstate 5,  Year Built: 1964,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 97,926 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 138,271 (year 2039),  Design Load: HS 20,  Features Intersected: NE 155TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 281.812,  Lanes on structure: 5,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.48m (14.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,293,000,  Roadway Improvement Cost: $459,000,  Total Project Cost: $4,586,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 7270D,  Location: 0.5 N JCT SR 523 (Lat: 47.740958,  Lng: -122.329025),  Route carried "on" structure: Interstate 5,  Year Built: 1964,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 97,926 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 138,271 (year 2039),  Design Load: HS 20,  Features Intersected: NE 155TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 281.812,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.48m (14.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,117,000,  Roadway Improvement Cost: $423,000,  Total Project Cost: $4,234,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 7270E,  Location: 1.0 E JCT SR 99 (Lat: 47.734086,  Lng: -122.325394),  Route carried "on" structure: State highway 523,  Year Built: 1964,  Status: Open,  Structure Length: 7.59m (24.90ft),  Average Daily Traffic: 30,279 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 42,753 (year 2039),  Design Load: HS 20,  Features Intersected: I-5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.481,  Lanes on structure: 5,  Lanes under structure: 11,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 80.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.59m (24.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,088,000,  Roadway Improvement Cost: $618,000,  Total Project Cost: $6,175,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7299A,  Location: 1.6 N JCT SR 523 (Lat: 47.755750,  Lng: -122.329500),  Route carried "on" structure: Interstate 5,  Year Built: 1964,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 87,353 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 123,342 (year 2039),  Design Load: HS 20,  Features Intersected: NE 175TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 283.454,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.97m (16.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,086,000,  Roadway Improvement Cost: $417,000,  Total Project Cost: $4,173,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 7299B,  Location: 1.6 N JCT SR 523 (Lat: 47.755750,  Lng: -122.329806),  Route carried "on" structure: Interstate 5,  Year Built: 1964,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 87,353 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 123,342 (year 2039),  Design Load: HS 20,  Features Intersected: NE 175TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 283.454,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.97m (16.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,478,000,  Roadway Improvement Cost: $496,000,  Total Project Cost: $4,955,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 7299C,  Location: 2.1 N JCT SR 523 (Lat: 47.763250,  Lng: -122.324306),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 7.59m (24.90ft),  Average Daily Traffic: 9,704 (year 2010),  Truck Traffic: 5%,  Average Future Daily Traffic: 15,255 (year 2036),  Design Load: HS 20,  Features Intersected: I-5,  Facility Carried by Structure: NE 185TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.472,  Lanes on structure: 2,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.59m (24.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,988,000,  Roadway Improvement Cost: $598,000,  Total Project Cost: $5,976,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 13302A,  Location: 0.9 N JCT SR 523 (Lat: 47.746914,  Lng: -122.329239),  Route carried "on" structure: Interstate 5,  Year Built: 1990,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 194,946 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 275,263 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: METRO ACCESS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 282.472,  Lanes on structure: 9,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 42.1m (138.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 42.1m (138.1ft),  Out-to-Out Width: 43.0m (141.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,120,000,  Roadway Improvement Cost: $224,000,  Total Project Cost: $2,240,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14326C,  Location: 3.2 N JCT SR 523 (Lat: 47.777389,  Lng: -122.318333),  Route carried "on" structure: Ramp Interstate 5,  Year Built: 1995,  Status: Open,  Structure Length: 5.76m (18.90ft),  Average Daily Traffic: 7,005 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,143 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: SR 104/205TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.789,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 14.8m (48.6ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.76m (18.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,928,000,  Roadway Improvement Cost: $386,000,  Total Project Cost: $3,856,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 81372,  Location: 0.1 MI W OF NW INNIS ARD (Lat: 47.751944,  Lng: -122.372583),  Route carried "on" structure: County highway 1169,  Year Built: 1931,  Status: Posted for load,  Structure Length: 9.51m (31.20ft),  Average Daily Traffic: 730 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 850 (year 2039),  Design Load: HS 15,  Features Intersected: SIDE HILL RAVINE,  Facility Carried by Structure: 10TH AVENUE NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 24.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 9.81m (32.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $4,894,000,  Roadway Improvement Cost: $979,000,  Total Project Cost: $9,789,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 88481,  Location: JCT RICH BEACH DR NW (Lat: 47.771186,  Lng: -122.392458),  Route carried "on" structure: City street 58695,  Year Built: 2011,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 650 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 800 (year 2040),  Design Load: HL 93,  Features Intersected: BNSF RR,  Facility Carried by Structure: NW 195TH CT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $276,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $551,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7071A,  Location: 1.3 E JCT SR 99 (Lat: 47.777389,  Lng: -122.317750),  Route carried "under" structure: State highway 104,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 48,479 (year 2019),  Truck Traffic: 2%,  Features Intersected: SR 104 / NE 205TH ST,  Facility Carried by Structure: I-5
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 47.749,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 7071B,  Location: 1.3 E JCT SR 99 (Lat: 47.777389,  Lng: -122.318056),  Route carried "under" structure: State highway 104,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 48,479 (year 2019),  Truck Traffic: 2%,  Features Intersected: SR 104 / NE 205TH ST,  Facility Carried by Structure: I-5
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 47.717,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 7071C,  Location: 1.3 E JCT SR 99 (Lat: 47.777361,  Lng: -122.317500),  Route carried "under" structure: State highway 104,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 48,479 (year 2019),  Truck Traffic: 2%,  Features Intersected: SR 104,  Facility Carried by Structure: I-5 NBCD
Minimum Vertical Clearance: 6.05m (19.85ft),  Kilometerpoint: 47.765,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 7270E,  Location: 3.8 N JCT SR 522 (Lat: 47.734086,  Lng: -122.325394),  Route carried "under" structure: Interstate 5,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 175,081 (year 2019),  Truck Traffic: 5%,  Features Intersected: I-5
Minimum Vertical Clearance: 6.58m (21.59ft),  Kilometerpoint: 280.959,  Lanes on structure: 5,  Lanes under structure: 11,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 7299C,  Location: 2.6 N JCT SR 523 (Lat: 47.763250,  Lng: -122.324306),  Route carried "under" structure: Interstate 5,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 189,639 (year 2019),  Truck Traffic: 5%,  Features Intersected: I-5
Minimum Vertical Clearance: 6.63m (21.75ft),  Kilometerpoint: 284.403,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 7299D,  Location: 2.6 N JCT SR 523 (Lat: 47.770250,  Lng: -122.321667),  Route carried "under" structure: Interstate 5,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 163,479 (year 2019),  Truck Traffic: 5%,  Features Intersected: I-5
Minimum Vertical Clearance: 6.63m (21.75ft),  Kilometerpoint: 285.192,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 13302A,  Location: 0.9 N JCT SR 523 (Lat: 47.746914,  Lng: -122.329239),  Route carried "under" structure: Ramp Interstate ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 1,144 (year 2020),  Truck Traffic: 75%,  Features Intersected: METRO ACCESS,  Facility Carried by Structure: I-5
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.032,  Lanes on structure: 9,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 11.3m (37.1ft)

Find on map >>   Show street view

Structure Number: 14326C,  Location: 1.2 E JCT SR 99 (Lat: 47.777389,  Lng: -122.318333),  Route carried "under" structure: State highway 104,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 48,479 (year 2019),  Truck Traffic: 2%,  Features Intersected: SR 104/205TH ST,  Facility Carried by Structure: I-5 SBCD
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 47.685,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 200412,  Location: 14.7 N JCT SR 509 (Lat: 47.743417,  Lng: -122.345444),  Route carried "under" structure: State highway 99,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 33,038 (year 2019),  Truck Traffic: 3%,  Features Intersected: AURORA AVE/SR 99,  Facility Carried by Structure: INTERURBAN TRAIL
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 66.160,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 41.1m (134.8ft)