  • National Bridge Inventory (NBI) Statistics
  • 35Number of bridges
  • 394ft / 120mTotal length
  • $73,533,000Total costs
  • 667,214Total average daily traffic
  • 36,825Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Silverdale
  • No street view available for this location

New bridges in Silverdale, WA - historical statistics
  • New bridges - historical statistics
  • 91970-1979
  • 201980-1989
  • 42000-2009
  • 22010-2019
Average Bridge Daily Traffic in Silverdale, WA
Average Bridge Truck Traffic in Silverdale, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 80.0%Good
  • 10.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.0%Very good
  • 70.0%Good
  • 5.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.0%Very good
  • 85.0%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 85.7%Very good
  • 14.3%Good
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 75.0%Good
Find on map >>   Show street view

Structure Number: 9124A,  Location: 9.9 N JCT SR 304 (Lat: 47.653733,  Lng: -122.705892),  Route carried "on" structure: State highway 3,  Year Built: 1972,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 26,694 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 35,449 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: ANDERSON HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.938,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,226,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $2,453,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9269B,  Location: 8.7 N JCT SR 304 (Lat: 47.636722,  Lng: -122.707194),  Route carried "on" structure: State highway 3,  Year Built: 1972,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 23,974 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 31,837 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: NEWBERRY HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 69.990,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.07m (23.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,856,000,  Roadway Improvement Cost: $371,000,  Total Project Cost: $3,712,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9269C,  Location: 8.7 N JCT SR 304 (Lat: 47.636700,  Lng: -122.707669),  Route carried "on" structure: State highway 3,  Year Built: 1972,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 23,974 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 31,837 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: NEWBERRY HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 69.974,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.35m (24.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,290,000,  Roadway Improvement Cost: $458,000,  Total Project Cost: $4,579,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10331A,  Location: JCT SR 3 (Lat: 47.661333,  Lng: -122.693028),  Route carried "on" structure: State highway 303,  Year Built: 1977,  Status: Open,  Structure Length: 5.82m (19.09ft),  Average Daily Traffic: 26,526 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 35,226 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.597,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.82m (19.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,063,000,  Roadway Improvement Cost: $413,000,  Total Project Cost: $4,126,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10729A,  Location: 9.9 N JCT SR 304 (Lat: 47.653739,  Lng: -122.705469),  Route carried "on" structure: State highway 3,  Year Built: 1978,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 26,694 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 35,449 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: ANDERSON HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.938,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,226,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $2,453,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 11375A,  Location: 2.1 N JCT SR 303 (Lat: 47.693850,  Lng: -122.687511),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 320 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 447 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: SR 3,  Facility Carried by Structure: MOUNTAIN VIEW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.899,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.1m (138.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 22.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.68m (25.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,512,000,  Roadway Improvement Cost: $302,000,  Total Project Cost: $3,024,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 11375B,  Location: 2.6 N JCT SR 303 (Lat: 47.700981,  Lng: -122.684683),  Route carried "on" structure: State highway 3,  Year Built: 1981,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 20,221 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 26,853 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 308 (LUOTO RD)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 78.021,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.33m (14.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,136,000,  Roadway Improvement Cost: $227,000,  Total Project Cost: $2,272,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 11375C,  Location: 2.6 N JCT SR 303 (Lat: 47.701061,  Lng: -122.684964),  Route carried "on" structure: State highway 3,  Year Built: 1981,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 20,221 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 26,853 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 308 (LUOTO RD)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 78.021,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.8m (137.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.18m (13.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,151,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $2,302,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 11375D,  Location: 2.6 N JCT SR 303 (Lat: 47.700558,  Lng: -122.684408),  Route carried "on" structure: Ramp State highway 3,  Year Built: 1981,  Status: Open,  Structure Length: 18.65m (61.19ft),  Average Daily Traffic: 3,955 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,252 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 3,  Facility Carried by Structure: N-W RAMP TO LUOTO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 39.9m (130.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.65m (61.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $4,896,000,  Roadway Improvement Cost: $979,000,  Total Project Cost: $9,792,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 11591A,  Location: 1.0 N JCT SR 303 (Lat: 47.678556,  Lng: -122.691528),  Route carried "on" structure: County highway ,  Year Built: 1979,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 5,355 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,439 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: SR 3,  Facility Carried by Structure: TRIGGER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.35m (24.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,024,000,  Roadway Improvement Cost: $405,000,  Total Project Cost: $4,049,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 11864A,  Location: JCT SR 3 (Lat: 47.664694,  Lng: -122.687639),  Route carried "on" structure: State highway 303,  Year Built: 1981,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 7.38m (24.21ft),  Average Daily Traffic: 36,265 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 48,159 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.985,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.8m (137.1ft),  Curb-To-Curb Width: 28.2m (92.5ft),  Out-to-Out Width: 29.1m (95.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.38m (24.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $3,194,000,  Roadway Improvement Cost: $639,000,  Total Project Cost: $6,389,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11864B,  Location: 0.3 W SR 3 (Lat: 47.700903,  Lng: -122.692139),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 3,389 (year 2002),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,154 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: SR 3 ACCESS - LUOTO ROAD,  Facility Carried by Structure: CLEAR CREEK RD NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.216,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.19m (20.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,462,000,  Roadway Improvement Cost: $292,000,  Total Project Cost: $2,923,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 81758,  Location: 6.6 N JCT SR 304 (Lat: 47.650131,  Lng: -122.650350),  Route carried "on" structure: County highway ,  Year Built: 1982,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 9,751 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,949 (year 2039),  Design Load: HS 20,  Features Intersected: SR 303,  Facility Carried by Structure: CENTRAL VALLEY RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.34m (20.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,618,000,  Roadway Improvement Cost: $524,000,  Total Project Cost: $5,236,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 81878,  Location: 7.7 N JCT SR 304 (Lat: 47.656211,  Lng: -122.670811),  Route carried "on" structure: State highway 303,  Year Built: 1982,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 14,829 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 19,692 (year 2039),  Design Load: HS 20,  Features Intersected: RIDGETOP BLVD NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.328,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,413,000,  Roadway Improvement Cost: $283,000,  Total Project Cost: $2,826,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 81879,  Location: 7.7 N JCT SR 304 (Lat: 47.656378,  Lng: -122.670614),  Route carried "on" structure: State highway 303,  Year Built: 1982,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 14,829 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 19,692 (year 2039),  Design Load: HS 20,  Features Intersected: RIDGETOP BLVD NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.328,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,413,000,  Roadway Improvement Cost: $283,000,  Total Project Cost: $2,826,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82008,  Location: 0.2 S JCT SR 3 (Lat: 47.664000,  Lng: -122.683333),  Route carried "on" structure: State highway 303,  Year Built: 1982,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 36,265 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 48,159 (year 2039),  Design Load: HS 20,  Features Intersected: SILVERDALE WAY NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.631,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,568,000,  Roadway Improvement Cost: $314,000,  Total Project Cost: $3,136,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 85739,  Location: 0.2 E SILVERDALE WAY NW (Lat: 47.654086,  Lng: -122.685375),  Route carried "on" structure: County highway 56791,  Year Built: 1989,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 10,894 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,983 (year 2042),  Design Load: HS 20,  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: RIDGETOP BLVD NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $223,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $446,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 86066,  Location: .1 MILE WEST OF SR3 (Lat: 47.678431,  Lng: -122.698883),  Route carried "on" structure: County highway 57770,  Year Built: 1979,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 4,517 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,969 (year 2042),  Design Load: HS 20,  Features Intersected: TRIGGER AVE,  Facility Carried by Structure: CLEAR CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,184,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $2,369,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 87536,  Location: 0.15 E JCT SILVRDLE WY NW (Lat: 47.659578,  Lng: -122.682644),  Route carried "on" structure: County highway 57720,  Year Built: 2006,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 10,436 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,480 (year 2042),  Design Load: HS 20,  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: MYHRE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $546,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,092,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 87537,  Location: 0.1 N JCT SR 303 (Lat: 47.665114,  Lng: -122.682739),  Route carried "on" structure: County highway 19515,  Year Built: 2006,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 14,889 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,378 (year 2042),  Design Load: HS 20,  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: SILVERDALE WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $441,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $882,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 87556,  Location: 0.42 N HWY 303 (Lat: 47.650378,  Lng: -122.632139),  Route carried "on" structure: County highway 57290,  Year Built: 2007,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 4,305 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,736 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: STEELE CREEK,  Facility Carried by Structure: BROWNSVILLE HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $154,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $307,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 87557,  Location: 0.41 N HWY 303 (Lat: 47.650950,  Lng: -122.632069),  Route carried "on" structure: County highway 57290,  Year Built: 2007,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 4,305 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,736 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: STEELE CREEK,  Facility Carried by Structure: BROWNSVILLE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $154,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $307,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 88911,  Location: 0.3 E SILVERDALE WAY (Lat: 47.650500,  Lng: -122.685858),  Route carried "on" structure: County highway 57740,  Year Built: 2016,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 14,857 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 16,343 (year 2042),  Design Load: HL 93,  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: NW BUCKLIN HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,880,000,  Roadway Improvement Cost: $576,000,  Total Project Cost: $5,760,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 88987,  Location: 0.17 SE SILVERDALE WAY NW (Lat: 47.666503,  Lng: -122.677919),  Route carried "on" structure: County highway 3340,  Year Built: 2017,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 370 (year 2019),  Truck Traffic: 29%,  Average Future Daily Traffic: 407 (year 2039),  Design Load: HL 93,  Features Intersected: WETLANDS,  Facility Carried by Structure: WOODBRIDGE ST NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 0.0m

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.61m (2.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $136,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $272,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 10331A,  Location: 10.8 N JCT SR 304 (Lat: 47.661333,  Lng: -122.693028),  Route carried "under" structure: State highway 3,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 53,388 (year 2019),  Truck Traffic: 7%,  Features Intersected: SR 3
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 73.354,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 11375A,  Location: 2.1 N JCT SR 303 (Lat: 47.693850,  Lng: -122.687511),  Route carried "under" structure: State highway 3,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 40,441 (year 2019),  Truck Traffic: 7%,  Features Intersected: SR 3,  Facility Carried by Structure: MOUNTAIN VIEW RD
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 77.200,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 11375B,  Location: JCT SR 3 (Lat: 47.700981,  Lng: -122.684683),  Route carried "under" structure: State highway 308,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 7,619 (year 2019),  Truck Traffic: 4%,  Features Intersected: SR 308 (LUOTO RD),  Facility Carried by Structure: SR 3
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 11375C,  Location: JCT SR 3 (Lat: 47.701061,  Lng: -122.684964),  Route carried "under" structure: State highway 308,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 7,619 (year 2019),  Truck Traffic: 4%,  Features Intersected: SR 308 (LUOTO RD),  Facility Carried by Structure: SR 3
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 11375D,  Location: 2.6 N JCT SR 303 (Lat: 47.700558,  Lng: -122.684408),  Route carried "under" structure: State highway 3,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 40,441 (year 2019),  Truck Traffic: 7%,  Features Intersected: SR 3,  Facility Carried by Structure: N-W RAMP TO LUOTO
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 78.021,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 11591A,  Location: 1.0 N JCT SR 303 (Lat: 47.678556,  Lng: -122.691528),  Route carried "under" structure: State highway 3,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 50,088 (year 2019),  Truck Traffic: 7%,  Features Intersected: SR 3,  Facility Carried by Structure: TRIGGER AVE
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 75.462,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 11864A,  Location: 11.1 N JCT SR 304 (Lat: 47.664694,  Lng: -122.687639),  Route carried "under" structure: State highway 3,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 29,906 (year 2019),  Truck Traffic: 7%,  Features Intersected: SR 3
Minimum Vertical Clearance: 6.73m (22.08ft),  Kilometerpoint: 73.885,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 11864B,  Location: 0.3 W SR 3 (Lat: 47.700903,  Lng: -122.692139),  Route carried "under" structure: County highway 3,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 7,619 (year 2019),  Truck Traffic: 4%,  Features Intersected: SR 3 ACCESS - LUOTO ROAD,  Facility Carried by Structure: CLEAR CREEK RD NW
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 81758,  Location: 6.6 N JCT SR 304 (Lat: 47.650131,  Lng: -122.650350),  Route carried "under" structure: State highway 303,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 36,706 (year 2019),  Truck Traffic: 3%,  Features Intersected: SR 303,  Facility Carried by Structure: CENTRAL VALLEY RD.
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 10.573,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 81878,  Location: 7.7 N JCT SR 304 (Lat: 47.656211,  Lng: -122.670811),  Route carried "under" structure: County highway 303,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 17,776 (year 2019),  Truck Traffic: 2%,  Features Intersected: RIDGETOP BLVD NW
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.048,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 81879,  Location: 7.7 N JCT SR 304 (Lat: 47.656378,  Lng: -122.670614),  Route carried "under" structure: County highway 303,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 17,776 (year 2019),  Truck Traffic: 2%,  Features Intersected: RIDGETOP BLVD NW
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.080,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Discuss Silverdale, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.