Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Snake Creek, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 161ft / 49.0mTotal length
  • $13,398,000Total costs
  • 47,333Total average daily traffic
  • 10,754Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Snake Creek
  • No street view available for this location

New bridges in Snake Creek, OK - historical statistics
  • New bridges - historical statistics
  • 101990-1999
  • 12010-2019
Average Bridge Daily Traffic in Snake Creek, OK
Average Bridge Truck Traffic in Snake Creek, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 85.7%Good
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 71.4%Very good
  • 14.3%Satisfactory
  • 14.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 71.4%Good
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 60.0%Very good
  • 40.0%Fair
Find on map >>   Show street view

Structure Number: 22924,  Location: 5.96 MI.NE OF TP GATE (Lat: 36.190636,  Lng: -95.127467),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 8.66m (28.41ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: HS 20,  Features Intersected: CHEROKEE TP UNDER,  Facility Carried by Structure: CO. RD. E0570
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.789,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.66m (28.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,082,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $2,663,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22928,  Location: 9.45 MI.NE OF TP GATE (Lat: 36.200258,  Lng: -95.118608),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: HS 20,  Features Intersected: CHEROKEE TP UNDER,  Facility Carried by Structure: CO. RD. N4430
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.433,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 35.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.27m (30.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,158,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $2,748,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22929,  Location: 10.6 MI.NE OF TP GATE (Lat: 36.210714,  Lng: -95.100736),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 800 (year 2040),  Design Load: HS 20,  Features Intersected: CHEROKEE TP UNDER,  Facility Carried by Structure: CO. RD. N4440
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.201,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.56m (24.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $944,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $2,506,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22934,  Location: 11.5 MI.NE OF TP GATE (Lat: 36.211828,  Lng: -95.085675),  Route carried "on" structure: Other road 412,  Year Built: 1991,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 6,100 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 9,760 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE SPRING CREEK,  Facility Carried by Structure: CHEROKEE TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.743,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.15m (36.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $858,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $2,409,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23922,  Location: MAYES CL 1.2 E. OF NW COR (Lat: 36.161531,  Lng: -95.098397),  Route carried "on" structure: County highway 1117,  Year Built: 1994,  Status: Posted for load,  Structure Length: 1.23m (4.04ft),  Average Daily Traffic: 133 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 213 (year 2040),  Design Load: H 20,  Features Intersected: SNAKE CREEK TRIB.,  Facility Carried by Structure: IRON POST RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.73m (12.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $191,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $303,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 23941,  Location: 11.6 MI.NE OF TP GATE (Lat: 36.212117,  Lng: -95.085417),  Route carried "on" structure: Other road 412,  Year Built: 1991,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 6,100 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 9,760 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE SPRING CREEK,  Facility Carried by Structure: CHEROKEE TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.769,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.15m (36.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $858,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $2,409,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23946,  Location: 9.9 MI E OF TP GATE (Lat: 36.204350,  Lng: -95.112372),  Route carried "on" structure: Other road 412,  Year Built: 1991,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 6,100 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 9,760 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: CHEROKEE TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.470,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 33.2m (108.9ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 114.3m (375.0ft),  Out-to-Out Width: 114.9m (377.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.46m (14.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 31713,  Location: 3E OF US412/SH82 (Lat: 36.195278,  Lng: -95.105000),  Route carried "on" structure: County highway E0563,  Year Built: 2015,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: SNAKE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Fair,  Operating Rating: 67.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22924,  Location: 5.96 MI.NE OF TP GATE (Lat: 36.190636,  Lng: -95.127467),  Route carried "under" structure: Other road 412,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 6,100 (year 2020),  Truck Traffic: 25%,  Features Intersected: CHEROKEE TP UNDER,  Facility Carried by Structure: CO. RD. E0570
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 13.789,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 22928,  Location: 9.45 MI.NE OF TP GATE (Lat: 36.200258,  Lng: -95.118608),  Route carried "under" structure: Other road 412,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 6,100 (year 2020),  Truck Traffic: 25%,  Features Intersected: CHEROKEE TP UNDER,  Facility Carried by Structure: CO. RD. N4430
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 14.433,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 22929,  Location: 10.6 MI.NE OF TP GATE (Lat: 36.210714,  Lng: -95.100736),  Route carried "under" structure: Other road 412,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 6,100 (year 2020),  Truck Traffic: 25%,  Features Intersected: CHEROKEE TP UNDER,  Facility Carried by Structure: CO. RD. N4440
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 17.201,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Discuss Snake Creek, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.