Bridge Statistics for Social Circle, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 34Number of bridges
  • 338ft / 103mTotal length
  • $117,303,000Total costs
  • 269,260Total average daily traffic
  • 30,414Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Social Circle
  • No street view available for this location

New bridges in Social Circle, GA - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 21950-1959
  • 51960-1969
  • 11970-1979
  • 41980-1989
  • 51990-1999
  • 22000-2009
  • 72010-2019
Average Bridge Daily Traffic in Social Circle, GA
Average Bridge Truck Traffic in Social Circle, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.3%Very good
  • 80.0%Good
  • 6.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 46.7%Very good
  • 46.7%Good
  • 6.7%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 40.0%Very good
  • 60.0%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 57.1%Very good
  • 14.3%Good
  • 28.6%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 14.3%Very good
  • 64.3%Good
  • 21.4%Satisfactory
Find on map >>   Show street view

Structure Number: 2110008,  Location: 3.8 MI SW OF RUTLEDGE (Lat: 33.604469,  Lng: -83.669878),  Route carried "on" structure: County highway 46,  Year Built: 1967,  Status: Open,  Structure Length: 8.02m (26.31ft),  Average Daily Traffic: 140 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 210 (year 2030),  Design Load: H 15,  Features Intersected: I-20,  Facility Carried by Structure: SEWELL CHURCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,028,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,541,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2110021,  Location: 3 MI SW OF RUTLEDGE (Lat: 33.600269,  Lng: -83.651939),  Route carried "on" structure: County highway 249,  Year Built: 1967,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 620 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 930 (year 2030),  Design Load: H 15,  Features Intersected: I-20,  Facility Carried by Structure: OLD MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,094,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,641,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2110023,  Location: 3.2 MI SW OF RUTLEDGE (Lat: 33.602469,  Lng: -83.658589),  Route carried "on" structure: Interstate 20,  Year Built: 1966,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 33,220 (year 2010),  Truck Traffic: 12%,  Average Future Daily Traffic: 49,830 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: HUNNICUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 165.762,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $170,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $256,000
Find on map >>   Show street view

Structure Number: 2115057,  Location: 4 MI S OF RUTLEDGE (Lat: 33.577628,  Lng: -83.648600),  Route carried "on" structure: County highway 2153,  Year Built: 1996,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 580 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 870 (year 2030),  Design Load: H 15,  Features Intersected: HUNNICUT CREEK,  Facility Carried by Structure: NEWBORN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $133,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $199,000
Find on map >>   Show street view

Structure Number: 2170005,  Location: 6 MI E OF COVINGTON (Lat: 33.605078,  Lng: -83.722669),  Route carried "on" structure: US 278,  Year Built: 1929,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,150 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,225 (year 2031),  Design Load: H 15,  Features Intersected: NELSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.22m (23.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 2170006,  Location: 7 MI E OF COVINGTON (Lat: 33.606900,  Lng: -83.708958),  Route carried "on" structure: US 278,  Year Built: 1929,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,150 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,225 (year 2031),  Design Load: H 15,  Features Intersected: LITTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 41.21m (135.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 2170016,  Location: 6.5 MI E OF COVINGTON (Lat: 33.611469,  Lng: -83.720169),  Route carried "on" structure: County highway 114,  Year Built: 1964,  Status: Posted for load,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 70 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 105 (year 2031),  Design Load: H 15,  Features Intersected: I-20,  Facility Carried by Structure: SOCIAL CIRCLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,086,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,629,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2170039,  Location: 6.5 MI E OF COVINGTON (Lat: 33.611719,  Lng: -83.728939),  Route carried "on" structure: Interstate 20,  Year Built: 1964,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 31,560 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 47,340 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NELSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 159.325,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $151,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $226,000
Find on map >>   Show street view

Structure Number: 2175039,  Location: 3 MI NE OF COVINGTON (Lat: 33.646519,  Lng: -83.773039),  Route carried "on" structure: County highway 278,  Year Built: 1992,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 970 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,455 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: STROUDS CREEK,  Facility Carried by Structure: HAMBY LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $195,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $293,000
Find on map >>   Show street view

Structure Number: 2175052,  Location: 5.5 MI E OF COVINGTON (Lat: 33.612408,  Lng: -83.750128),  Route carried "on" structure: State highway 11,  Year Built: 2003,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 9,450 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,175 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 19.6m (64.3ft),  Out-to-Out Width: 23.9m (78.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,377,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $2,065,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2175053,  Location: NEWTON-WALTON CO. LINE (Lat: 33.609469,  Lng: -83.699478),  Route carried "on" structure: US 278,  Year Built: 2003,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 2,730 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,095 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,407,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 217506,  Location: AT THE MORGAN CO LINE (Lat: 33.573978,  Lng: -83.679678),  Route carried "on" structure: County highway 132,  Year Built: 2014,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 230 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 345 (year 2031),  Design Load: HS 20,  Features Intersected: LITTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.0m (13.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $4,085,000,  Roadway Improvement Cost: $408,000,  Total Project Cost: $6,128,000 ( Estimate for 2015),  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 2970016,  Location: 4.5 MI N OF SOCIAL CIRCLE (Lat: 33.720069,  Lng: -83.695719),  Route carried "on" structure: State highway 11,  Year Built: 1926,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 6,030 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,045 (year 2032),  Design Load: H 15,  Features Intersected: ROCKY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 297004,  Location: 3.2 M NW OF SOCIAL CIRCLE (Lat: 33.692900,  Lng: -83.751169),  Route carried "on" structure: County highway 1051,  Year Built: 1958,  Status: Posted for load,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 1,680 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,520 (year 2032),  Design Load: H 15,  Features Intersected: ALCOVY RIVER,  Facility Carried by Structure: JERSEY SOC. CIR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 13.38m (43.90ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: April 2020,  Bridge Improvement Cost: $242,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $400,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2970041,  Location: 3 MI NW OF SOCIAL CIRCLE (Lat: 33.691408,  Lng: -83.749558),  Route carried "on" structure: County highway 1051,  Year Built: 1958,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,680 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,520 (year 2032),  Design Load: H 15,  Features Intersected: RICHLAND CREEK,  Facility Carried by Structure: JERSEY SOC. CIR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 2970042,  Location: IN SOCIAL CIRCLE (Lat: 33.654297,  Lng: -83.714847),  Route carried "on" structure: County highway 1051,  Year Built: 1986,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 700 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,050 (year 2032),  Design Load: HS 20,  Features Intersected: GREAT WALTON RAILROAD,  Facility Carried by Structure: EAST HIGHTOWER TRL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $426,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $639,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2970043,  Location: CITY OF SOCIAL CIRCLE (Lat: 33.654019,  Lng: -83.713428),  Route carried "on" structure: County highway 1051,  Year Built: 1970,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 700 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,050 (year 2032),  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: EAST HIGHTOWER TRL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 43.01m (141.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $356,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $533,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2975028,  Location: 2.5 M NW OF SOCIAL CIRCLE (Lat: 33.682878,  Lng: -83.744858),  Route carried "on" structure: County highway 165,  Year Built: 1988,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: GIBBS CREEK,  Facility Carried by Structure: CLEGG FARM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 297507,  Location: 3.5 MI NW OF MONROE (Lat: 33.820408,  Lng: -83.761808),  Route carried "on" structure: County highway 467,  Year Built: 1981,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 3%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BEAVERDAM CREEK,  Facility Carried by Structure: DOUBLE SPRINGS CH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $195,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $293,000
Find on map >>   Show street view

Structure Number: 2975072,  Location: NW SOCIAL CIRCLE (Lat: 33.677369,  Lng: -83.729747),  Route carried "on" structure: County highway 1051,  Year Built: 1989,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,970 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,955 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: GIBBS CREEK,  Facility Carried by Structure: WEST HIGHTOWER TRL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $141,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $211,000
Find on map >>   Show street view

Structure Number: 2975078,  Location: 2.8 MI E OF SOCIAL CIRCLE (Lat: 33.665358,  Lng: -83.672658),  Route carried "on" structure: County highway 210,  Year Built: 1994,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MEANS CREEK,  Facility Carried by Structure: HAWKINS ACAD. RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 2975079,  Location: 3 MI W OF SOCIAL CIRCLE (Lat: 33.666550,  Lng: -83.764119),  Route carried "on" structure: County highway 162,  Year Built: 1995,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ALCOVY RIVER,  Facility Carried by Structure: COUNTY LINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,094,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,641,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 297508,  Location: 3.5 MI W OF SOCIAL CIRCLE (Lat: 33.666519,  Lng: -83.776758),  Route carried "on" structure: County highway 162,  Year Built: 1995,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BIG FLAT CREEK,  Facility Carried by Structure: COUNTY LINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2975096,  Location: 4 MI NE OF SOCIAL CIRCLE (Lat: 33.687608,  Lng: -83.658758),  Route carried "on" structure: County highway 240,  Year Built: 2014,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 490 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2034),  Design Load: HS 20+Mod,  Features Intersected: REEDY CREEK,  Facility Carried by Structure: SOC CIR FAIRPLAY R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.04m (19.82ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: April 2020,  Bridge Improvement Cost: $14,652,000,  Roadway Improvement Cost: $1,465,000,  Total Project Cost: $21,978,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2975097,  Location: 5 MI NE OF SOCIAL CIRCLE (Lat: 33.717647,  Lng: -83.671708),  Route carried "on" structure: County highway 218,  Year Built: 2014,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 490 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2034),  Design Load: HS 20+Mod,  Features Intersected: ROCKY CREEK,  Facility Carried by Structure: MT. PARON CH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $1,850,000,  Roadway Improvement Cost: $185,000,  Total Project Cost: $2,775,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 29751,  Location: 1.5 MI SE OF SOCIAL CIRCL (Lat: 33.640617,  Lng: -83.701681),  Route carried "on" structure: City street 754,  Year Built: 2014,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 490 (year 2015),  Truck Traffic: 12%,  Average Future Daily Traffic: 735 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: LITTLE RIVER TRIB,  Facility Carried by Structure: SOCIAL CIRCLE BYPA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.71m (22.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $16,280,000,  Roadway Improvement Cost: $1,628,000,  Total Project Cost: $24,420,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2975101,  Location: 1.6 MI SE OF SOCIAL CIRCL (Lat: 33.640781,  Lng: -83.708267),  Route carried "on" structure: City street 754,  Year Built: 2014,  Status: Open,  Structure Length: 6.00m (19.69ft),  Average Daily Traffic: 490 (year 2015),  Truck Traffic: 12%,  Average Future Daily Traffic: 735 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: LITTLE RIVER TRIB,  Facility Carried by Structure: SOCIAL CIRCLE BYPA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.19m (23.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $17,464,000,  Roadway Improvement Cost: $1,746,000,  Total Project Cost: $26,196,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2975102,  Location: 1.7 MI SE OF SOCIAL CIRCL (Lat: 33.640817,  Lng: -83.695650),  Route carried "on" structure: City street 754,  Year Built: 2014,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 490 (year 2015),  Truck Traffic: 12%,  Average Future Daily Traffic: 735 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: LITTLE RIVER TRIB,  Facility Carried by Structure: SOCIAL CIRCLE BYPA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 9 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,197,000,  Roadway Improvement Cost: $320,000,  Total Project Cost: $4,795,000 ( Estimate for 2016)
Find on map >>   Show street view

Structure Number: 2975104,  Location: IN SOUTH SOCIAL CIRCLE (Lat: 33.652519,  Lng: -83.721128),  Route carried "on" structure: State highway 11,  Year Built: 2019,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 12,730 (year 2016),  Truck Traffic: 13%,  Average Future Daily Traffic: 17,140 (year 2036),  Design Load: HL 93,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: SOUTH CHEROKEE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.3m (128.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $11,470,000,  Roadway Improvement Cost: $1,147,000,  Total Project Cost: $17,205,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2110008,  Location: 3.8 MI SW OF RUTLEDGE (Lat: 33.604469,  Lng: -83.669878),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 29,500 (year 2010),  Truck Traffic: 12%,  Features Intersected: CR 46 SEWELL CHURCH ROAD,  Facility Carried by Structure: SEWELL CHURCH RD
Minimum Vertical Clearance: 6.24m (20.47ft),  Kilometerpoint: 164.153,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2110021,  Location: 3 MI SW OF RUTLEDGE (Lat: 33.600269,  Lng: -83.651939),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 29,500 (year 2010),  Truck Traffic: 12%,  Features Intersected: CR 249 OLD MILL ROAD,  Facility Carried by Structure: OLD MILL ROAD
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 167.372,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2170016,  Location: 6.5 MI E OF COVINGTON (Lat: 33.611469,  Lng: -83.720169),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 32,000 (year 2000),  Truck Traffic: 31%,  Features Intersected: CR 114 SOCIAL CIRCLE RD,  Facility Carried by Structure: SOCIAL CIRCLE RD
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 159.325,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2175052,  Location: 5.5 MI E OF COVINGTON (Lat: 33.612408,  Lng: -83.750128),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 32,000 (year 2001),  Truck Traffic: 6%,  Features Intersected: SR 11,  Facility Carried by Structure: SR 11
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 157.716,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2175053,  Location: NEWTON-WALTON CO. LINE (Lat: 33.609469,  Lng: -83.699478),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 32,000 (year 2001),  Truck Traffic: 15%,  Features Intersected: SR 12 (US 278),  Facility Carried by Structure: US 278
Minimum Vertical Clearance: 5.63m (18.47ft),  Kilometerpoint: 162.544,  Lanes on structure: 2,  Length of Maximum Span: 0.0m