Bridge Statistics for Somerville, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 102ft / 30.6mTotal length
  • $9,638,000Total costs
  • 39,469Total average daily traffic
  • 3,180Total average daily truck traffic
  • 57,934Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Somerville
  • No street view available for this location

New bridges in Somerville, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31930-1939
  • 21950-1959
  • 41980-1989
  • 12000-2009
  • 22010-2019
  • 12020-2022
Average Bridge Daily Traffic in Somerville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Good
  • 66.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Good
  • 50.0%Satisfactory
  • 16.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Very good
  • 66.7%Good
  • 16.7%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 21.4%Very good
  • 28.6%Good
  • 28.6%Satisfactory
  • 21.4%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 37.5%Very good
  • 37.5%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 407,  Location: 0.5 M E JCT SR 36 & SR 67 (Lat: 34.445861,  Lng: -86.749333),  Route carried "on" structure: State highway 36,  Year Built: 1927,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 3,650 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,419 (year 2033),  Design Load: H 20,  Features Intersected: TOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.982,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $312,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $343,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1775,  Location: 5 MI E JCT SR 36 & I 65 (Lat: 34.446975,  Lng: -86.809214),  Route carried "on" structure: State highway 36,  Year Built: 1938,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 4,110 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,975 (year 2033),  Design Load: H 15,  Features Intersected: GUM SPRINGS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.430,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $397,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $437,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1794,  Location: 0.7 M N JCT SR 67 & SR 36 (Lat: 34.453000,  Lng: -86.767100),  Route carried "on" structure: State highway 67,  Year Built: 1938,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 5,600 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 7,265 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.023,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $474,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $521,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1796,  Location: 6.5 MI S JCT SR 67 & I 65 (Lat: 34.475000,  Lng: -86.809500),  Route carried "on" structure: State highway 67,  Year Built: 1938,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 6,950 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 9,016 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.663,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $403,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4699,  Location: 1 MI S SOMERVILLE (Lat: 34.459114,  Lng: -86.799139),  Route carried "on" structure: County highway 333,  Year Built: 1953,  Status: Posted for load,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 1,562 (year 1982),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,061 (year 2041),  Features Intersected: TOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 29.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $605,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $666,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5365,  Location: 1.5 MI N SR 36 (Lat: 34.464053,  Lng: -86.736333),  Route carried "on" structure: County highway 387,  Year Built: 1955,  Status: Posted for load,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 700 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,514 (year 2042),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: ANTIOCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 6.95m (22.80ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $1,096,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,206,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12847,  Location: 1.5 MI NW SR 36 (Lat: 34.461014,  Lng: -86.795606),  Route carried "on" structure: County highway 331,  Year Built: 1982,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 330 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 635 (year 2040),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: OLD SIX MILE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $912,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,003,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13314,  Location: 1 MI W JCT SR 36 & SR 67 (Lat: 34.446331,  Lng: -86.771083),  Route carried "on" structure: State highway 36,  Year Built: 1984,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 3,460 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,189 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.487,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 66.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $436,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $480,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13315,  Location: 0.8 M W JCT SR 36 & SR 67 (Lat: 34.446392,  Lng: -86.775069),  Route carried "on" structure: State highway 36,  Year Built: 1984,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,460 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,189 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.809,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 65.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $349,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $384,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17547,  Location: 1.0 MI S HWY 67 (Lat: 34.465011,  Lng: -86.808883),  Route carried "on" structure: County highway 334,  Year Built: 1985,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 510 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 962 (year 2039),  Design Load: HS 20,  Features Intersected: GILL CREEK,  Facility Carried by Structure: BLACK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.2m (7.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $592,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $651,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19286,  Location: 5 MI WEST OF SR 67 (Lat: 34.515883,  Lng: -86.771161),  Route carried "on" structure: County highway 1356,  Year Built: 2005,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,831 (year 2004),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,662 (year 2039),  Design Load: HS 20,  Features Intersected: MADDEN BRANCH,  Facility Carried by Structure: UPPER RIVER ROAD
Minimum Vertical Clearance: 9.14m (29.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.8m (9.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $456,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $502,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20384,  Location: 2.6M W Jct SR36 & SR67 (Lat: 34.446911,  Lng: -86.802406),  Route carried "on" structure: State highway 36,  Year Built: 2021,  Status: Open,  Structure Length: 1.76m (5.77ft),  Average Daily Traffic: 5,040 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 8,260 (year 2039),  Design Load: HS 20,  Features Intersected: ROAN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.041,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 79.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $712,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $783,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20637,  Location: 0.5 MI SOUTH SR36 (Lat: 34.442567,  Lng: -86.817950),  Route carried "on" structure: County highway 1328,  Year Built: 2013,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 850 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,509 (year 2041),  Design Load: HS 20,  Features Intersected: GUM SPRINGS CREEK,  Facility Carried by Structure: GUM SPRINGS ROAD
Minimum Vertical Clearance: 12.19m (39.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $453,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $498,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20944,  Location: 1.5 mi North of SR67 (Lat: 34.439681,  Lng: -86.700642),  Route carried "on" structure: County highway 1152,  Year Built: 2016,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 1,416 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,278 (year 2040),  Design Load: HS 20,  Features Intersected: Cotaco Creek,  Facility Carried by Structure: Cotaco Florette Rd
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.34m (27.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,601,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $1,761,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels