Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for South Corning, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 56ft / 17.5mTotal length
  • $13,951,000Total costs
  • 44,762Total average daily traffic
  • 1,000Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for South Corning
  • No street view available for this location

New bridges in South Corning, NY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11970-1979
  • 41980-1989
  • 21990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in South Corning, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 37.5%Very good
  • 50.0%Good
  • 12.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Very good
  • 37.5%Good
  • 12.5%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Excellent
  • 12.5%Very good
  • 25.0%Good
  • 37.5%Satisfactory
  • 12.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Very good
  • 71.4%Fair
  • 14.3%Poor
Find on map >>   Show street view

Structure Number: 104202,  Location: 3.0 MI S OF CORNING (Lat: 42.094178,  Lng: -77.041406),  Route carried "on" structure: State highway 225,  Year Built: 2014,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 1,660 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,731 (year 2040),  Design Load: HL 93,  Features Intersected: CATON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.475,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $654,000,  Roadway Improvement Cost: $383,000,  Total Project Cost: $1,037,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107283,  Location: 2.1 MI SE OF CORNING (Lat: 42.124642,  Lng: -77.022119),  Route carried "on" structure: Ramp State highway 961,  Year Built: 1985,  Status: Open,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 4,803 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,848 (year 2040),  Design Load: HS 20,  Features Intersected: 86I 17 64043119, RTE I86
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.3m (102.7ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.06m (19.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,229,000,  Roadway Improvement Cost: $1,891,000,  Total Project Cost: $5,120,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107284,  Location: 4 MI SE OF CORNING (Lat: 42.125261,  Lng: -77.021267),  Route carried "on" structure: Ramp Other road 961,  Year Built: 1985,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 4,803 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,848 (year 2040),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 18.6m (61.0ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,244,000,  Roadway Improvement Cost: $1,314,000,  Total Project Cost: $3,559,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10965,  Location: 1.0 MI S OF CORNING (Lat: 42.128514,  Lng: -77.035639),  Route carried "on" structure: State highway 225,  Year Built: 1976,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 7,840 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,524 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: UNKNOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.594,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $253,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 221677,  Location: 0.6 MI SW OF S.CORNING (Lat: 42.116831,  Lng: -77.050389),  Route carried "on" structure: Other road ,  Year Built: 1986,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 632 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 885 (year 2039),  Features Intersected: BAILEY CREEK,  Facility Carried by Structure: BAILEY CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.942,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $535,000,  Roadway Improvement Cost: $313,000,  Total Project Cost: $848,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221678,  Location: 1.9 MI S OF S CORNING (Lat: 42.099114,  Lng: -77.039878),  Route carried "on" structure: Other road ,  Year Built: 2004,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 51 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 71 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: WHISKEY CREEK,  Facility Carried by Structure: RIFF ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $347,000,  Roadway Improvement Cost: $203,000,  Total Project Cost: $550,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333358,  Location: 3.1 MILES NORTH OF CATON (Lat: 42.099561,  Lng: -77.040700),  Route carried "on" structure: County highway ,  Year Built: 1938,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 441 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 617 (year 2040),  Design Load: HS 20,  Features Intersected: WHISKEY CREEK,  Facility Carried by Structure: COUNTY ROAD 34
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.875,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 83.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $548,000,  Roadway Improvement Cost: $321,000,  Total Project Cost: $868,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333368,  Location: .7 MI E OF S CORNING (Lat: 42.120050,  Lng: -77.021683),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 2,316 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,416 (year 2040),  Design Load: HS 20,  Features Intersected: WHISKEY CREEK,  Facility Carried by Structure: COUNTY ROAD 44
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $654,000,  Roadway Improvement Cost: $383,000,  Total Project Cost: $1,038,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333369,  Location: 3.0 MI E OF S CORNING (Lat: 42.115311,  Lng: -76.991239),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 1992,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 2,316 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,416 (year 2040),  Design Load: HS 20,  Features Intersected: GILLETTE CREEK,  Facility Carried by Structure: COUNTY ROAD 44
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.379,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $428,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $678,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 107283,  Location: 2.1 MI SE OF CORNING (Lat: 42.124642,  Lng: -77.022119),  Route carried "under" structure: Interstate 86,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 19,900 (year 1985),  Features Intersected: 86I 17 64043119, RTE I86,  Facility Carried by Structure: RTE 961
Minimum Vertical Clearance: 6.48m (21.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.3m (102.7ft)

Discuss South Corning, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.